Analysis of the design process of Hydro-Sanitary Systems for buildings

Detalhes bibliográficos
Autor(a) principal: Lima, Camila Fonseca Melo
Data de Publicação: 2016
Outros Autores: Andery, Paulo Roberto Pereira, Veiga, Ana Cecília Rocha
Tipo de documento: Artigo
Idioma: por
Título da fonte: PARC (Campinas)
Texto Completo: https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049
Resumo: This article presents a diagnosis of the design process of hydro-sanitary systems in real estate projects, with emphasis on the analysis of the contracts and coordination mechanisms of the projects, including the challenges of implementing the NBR 15575 standard and the BIM (Building Information Modeling). We used the case study method and conducted semi-structured interviews with different agents: designers, builders, design engineers, and architects. Additionally, other sources of evidence were analyzed, such as drawings, design documents, contracts, and coordination records. The results suggest that deficiencies in the design process of hydro-sanitary systems are primarily due to the late involvement of designers in project design and their discontinued and occasional participation, failing to include the development of the “as built” and post-occupancy evaluations. Difficulties relative to the implementation of the NBR 15575 standard and BIM can be easily foreseen, as they are unknown and are also very new in the present scenario of projects relative to hydro-sanitary systems. Concerning the management challenges encountered in this work, as well as the gaps previously highlighted in the theoretical framework and confirmed a posteriori by the investigated cases, we propose recommendations resulting in improving the management of the design process for hydro-sanitary systems. By showing the procedural deficiencies and presenting these recommendations, this study adds significant contributions besides the simple diagnosis; it further becomes a source of propositions that impact the performance of buildings and that can be extended to the best market and management practices.
id UNICAMP-20_cd6b733d7087bebac45d7bdd55bd6708
oai_identifier_str oai:ojs.periodicos.sbu.unicamp.br:article/8645049
network_acronym_str UNICAMP-20
network_name_str PARC (Campinas)
repository_id_str
spelling Analysis of the design process of Hydro-Sanitary Systems for buildingsAnálise do processo de projeto de sistemas hidrossanitários prediaisGestão. Sistemas hidrossanitários prediais. BIM. Desempenho. NBR 15.575.Hydro-sanitary SystemsProject Process ManagementPerformance GuaranteeThis article presents a diagnosis of the design process of hydro-sanitary systems in real estate projects, with emphasis on the analysis of the contracts and coordination mechanisms of the projects, including the challenges of implementing the NBR 15575 standard and the BIM (Building Information Modeling). We used the case study method and conducted semi-structured interviews with different agents: designers, builders, design engineers, and architects. Additionally, other sources of evidence were analyzed, such as drawings, design documents, contracts, and coordination records. The results suggest that deficiencies in the design process of hydro-sanitary systems are primarily due to the late involvement of designers in project design and their discontinued and occasional participation, failing to include the development of the “as built” and post-occupancy evaluations. Difficulties relative to the implementation of the NBR 15575 standard and BIM can be easily foreseen, as they are unknown and are also very new in the present scenario of projects relative to hydro-sanitary systems. Concerning the management challenges encountered in this work, as well as the gaps previously highlighted in the theoretical framework and confirmed a posteriori by the investigated cases, we propose recommendations resulting in improving the management of the design process for hydro-sanitary systems. By showing the procedural deficiencies and presenting these recommendations, this study adds significant contributions besides the simple diagnosis; it further becomes a source of propositions that impact the performance of buildings and that can be extended to the best market and management practices.Esse artigo apresenta um diagnóstico sobre o processo de projeto de sistemas hidrossanitários em empreendimentos de incorporação imobiliária, com ênfase na análise dos mecanismos de contratação e coordenação dos projetos, incluindo os desafios da implementação da NBR 15.575 e do BIM (Building Information Modeling). Utilizou-se o método do estudo de caso, sendo conduzidas entrevistas semiestruturadas com distintos agentes: projetistas, construtores, coordenadores de projeto e arquitetos. Adicionalmente, foram analisadas outras fontes de evidência, como desenhos, documentos de projeto, contratos e registros de coordenação. Os resultados sugerem que as deficiências no processo de projeto de sistemas hidrossanitários são decorrentes, principalmente, do envolvimento tardio dos projetistas na concepção do projeto e de sua participação descontinuada e pontual, deixando de incluir o desenvolvimento do as built e avaliações pós-ocupação. Percebe-se dificuldades associadas à implementação da NBR 15.575 e do BIM, consequência do desconhecimento pleno de ambos e de serem recentes no cenário projetual de instalações hidrossanitárias. Para os desafios gerenciais encontrados neste trabalho, bem como para as lacunas previamente demarcadas no referencial teórico e confirmadas a posteriori pelos casos investigados, são propostas recomendações visando a melhoria da gestão do processo de projeto de sistemas hidrossanitários. Ao evidenciar as deficiências processuais e encaminhar essas recomendações, o presente trabalho acrescenta relevantes contribuições para além de diagnósticos, constituindo-se como fonte de proposições que impactam o desempenho das edificações e que podem ser estendidas às melhores práticas de mercado e de gestão.Universidade Estadual de Campinas2016-06-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionEmpirical studyEstudo exploratórioapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/864504910.20396/parc.v7i2.8645049PARC Pesquisa em Arquitetura e Construção; Vol. 7 No. 2 (2016); 102-113PARC Pesquisa em Arquitetura e Construção; Vol. 7 Núm. 2 (2016); 102-113PARC Pesquisa em Arquitetura e Construção; v. 7 n. 2 (2016); 102-1131980-6809reponame:PARC (Campinas)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPporhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049/14726Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construçãoinfo:eu-repo/semantics/openAccessLima, Camila Fonseca MeloAndery, Paulo Roberto PereiraVeiga, Ana Cecília Rocha2019-06-17T17:46:05Zoai:ojs.periodicos.sbu.unicamp.br:article/8645049Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/parcPUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/oai||parc@fec.unicamp.br1980-68091980-6809opendoar:2019-06-17T17:46:05PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)false
dc.title.none.fl_str_mv Analysis of the design process of Hydro-Sanitary Systems for buildings
Análise do processo de projeto de sistemas hidrossanitários prediais
title Analysis of the design process of Hydro-Sanitary Systems for buildings
spellingShingle Analysis of the design process of Hydro-Sanitary Systems for buildings
Lima, Camila Fonseca Melo
Gestão. Sistemas hidrossanitários prediais. BIM. Desempenho. NBR 15.575.
Hydro-sanitary Systems
Project Process Management
Performance Guarantee
title_short Analysis of the design process of Hydro-Sanitary Systems for buildings
title_full Analysis of the design process of Hydro-Sanitary Systems for buildings
title_fullStr Analysis of the design process of Hydro-Sanitary Systems for buildings
title_full_unstemmed Analysis of the design process of Hydro-Sanitary Systems for buildings
title_sort Analysis of the design process of Hydro-Sanitary Systems for buildings
author Lima, Camila Fonseca Melo
author_facet Lima, Camila Fonseca Melo
Andery, Paulo Roberto Pereira
Veiga, Ana Cecília Rocha
author_role author
author2 Andery, Paulo Roberto Pereira
Veiga, Ana Cecília Rocha
author2_role author
author
dc.contributor.author.fl_str_mv Lima, Camila Fonseca Melo
Andery, Paulo Roberto Pereira
Veiga, Ana Cecília Rocha
dc.subject.por.fl_str_mv Gestão. Sistemas hidrossanitários prediais. BIM. Desempenho. NBR 15.575.
Hydro-sanitary Systems
Project Process Management
Performance Guarantee
topic Gestão. Sistemas hidrossanitários prediais. BIM. Desempenho. NBR 15.575.
Hydro-sanitary Systems
Project Process Management
Performance Guarantee
description This article presents a diagnosis of the design process of hydro-sanitary systems in real estate projects, with emphasis on the analysis of the contracts and coordination mechanisms of the projects, including the challenges of implementing the NBR 15575 standard and the BIM (Building Information Modeling). We used the case study method and conducted semi-structured interviews with different agents: designers, builders, design engineers, and architects. Additionally, other sources of evidence were analyzed, such as drawings, design documents, contracts, and coordination records. The results suggest that deficiencies in the design process of hydro-sanitary systems are primarily due to the late involvement of designers in project design and their discontinued and occasional participation, failing to include the development of the “as built” and post-occupancy evaluations. Difficulties relative to the implementation of the NBR 15575 standard and BIM can be easily foreseen, as they are unknown and are also very new in the present scenario of projects relative to hydro-sanitary systems. Concerning the management challenges encountered in this work, as well as the gaps previously highlighted in the theoretical framework and confirmed a posteriori by the investigated cases, we propose recommendations resulting in improving the management of the design process for hydro-sanitary systems. By showing the procedural deficiencies and presenting these recommendations, this study adds significant contributions besides the simple diagnosis; it further becomes a source of propositions that impact the performance of buildings and that can be extended to the best market and management practices.
publishDate 2016
dc.date.none.fl_str_mv 2016-06-30
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Empirical study
Estudo exploratório
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049
10.20396/parc.v7i2.8645049
url https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049
identifier_str_mv 10.20396/parc.v7i2.8645049
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049/14726
dc.rights.driver.fl_str_mv Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual de Campinas
publisher.none.fl_str_mv Universidade Estadual de Campinas
dc.source.none.fl_str_mv PARC Pesquisa em Arquitetura e Construção; Vol. 7 No. 2 (2016); 102-113
PARC Pesquisa em Arquitetura e Construção; Vol. 7 Núm. 2 (2016); 102-113
PARC Pesquisa em Arquitetura e Construção; v. 7 n. 2 (2016); 102-113
1980-6809
reponame:PARC (Campinas)
instname:Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
instname_str Universidade Estadual de Campinas (UNICAMP)
instacron_str UNICAMP
institution UNICAMP
reponame_str PARC (Campinas)
collection PARC (Campinas)
repository.name.fl_str_mv PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)
repository.mail.fl_str_mv ||parc@fec.unicamp.br
_version_ 1809283614295195648