The use of FTA to evaluate the potential of BIM platform in building rehabilitation
Autor(a) principal: | |
---|---|
Data de Publicação: | 2017 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | PARC (Campinas) |
Texto Completo: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8649200 |
Resumo: | Several studies recognize the potential of interventions in existing buildings to reduce the consumption of natural resources and the use of new lands. In the context of sustainable design, the adoption of alternatives to support the integrated design and collaborative work - as Building Information Modeling (BIM) - offers a great potential to identify and propose interventions that implement sustainable practices equally - in new buildings as well as in the rehabilitation of existing ones. A case study was performed on the rehabilitation design process of the headquarters of PETROBRAS, in the city of Rio de Janeiro. The main purpose was to identify the potential of the BIM Platform for the improvement of the environmental performance of the building - one of the exigencies of the rehabilitation process - which had considered the requirements of the AQUA HQE environmental assessment and the Brazilian program of energy efficiency, the PROCEL EDIFICA, as its parameters. However, there was little integration among the design team and the BIM model. This article presents the results of the analysis of BIM Platform used in the design rehabilitation process of the given building, by using the FTA – the Fault Tree Analysis Method. The results indicate that BIM had not been considered from the beginning and the consequence was the low integration of the design process. BIM functionalities could, in turn, have brought more dynamism and integration to the design management process. Therefore, it is necessary to review the design process, in order to incorporate BIM potentialities since the beginning of the process and allow the collaborative work. |
id |
UNICAMP-20_efba96d04c22056fbd3c280b32cc6ade |
---|---|
oai_identifier_str |
oai:ojs.periodicos.sbu.unicamp.br:article/8649200 |
network_acronym_str |
UNICAMP-20 |
network_name_str |
PARC (Campinas) |
repository_id_str |
|
spelling |
The use of FTA to evaluate the potential of BIM platform in building rehabilitationO uso do FTA para avaliar o potencial da plataforma BIM na reabilitação de edifícioRehabilitation. Environmental quality. BIM.Reabilitação. Qualidade ambiental. BIM. FTA.Several studies recognize the potential of interventions in existing buildings to reduce the consumption of natural resources and the use of new lands. In the context of sustainable design, the adoption of alternatives to support the integrated design and collaborative work - as Building Information Modeling (BIM) - offers a great potential to identify and propose interventions that implement sustainable practices equally - in new buildings as well as in the rehabilitation of existing ones. A case study was performed on the rehabilitation design process of the headquarters of PETROBRAS, in the city of Rio de Janeiro. The main purpose was to identify the potential of the BIM Platform for the improvement of the environmental performance of the building - one of the exigencies of the rehabilitation process - which had considered the requirements of the AQUA HQE environmental assessment and the Brazilian program of energy efficiency, the PROCEL EDIFICA, as its parameters. However, there was little integration among the design team and the BIM model. This article presents the results of the analysis of BIM Platform used in the design rehabilitation process of the given building, by using the FTA – the Fault Tree Analysis Method. The results indicate that BIM had not been considered from the beginning and the consequence was the low integration of the design process. BIM functionalities could, in turn, have brought more dynamism and integration to the design management process. Therefore, it is necessary to review the design process, in order to incorporate BIM potentialities since the beginning of the process and allow the collaborative work.Diversos estudos reconhecem o potencial de intervenções em edifícios existentes, visto que reduzem o consumo de recursos naturais e de novas áreas. No âmbito do desenvolvimento de projetos sustentáveis, a adoção de ferramentas que auxiliem o projeto integrado e trabalho colaborativo, como a plataforma BIM (Building Information Modeling), tem grande potencial para a identificação e proposição de intervenções sustentáveis, tanto em novas construções como em existentes. Um estudo de caso foi realizado sobre o processo de projeto de reabilitação da sede da PETROBRAS, na cidade do Rio de Janeiro. O principal objetivo foi identificar o potencial da plataforma BIM na melhoria do desempenho ambiental do edifício – uma das exigências do processo de reabilitação - que considerou como parâmetros os requisitos do sistema de avaliação ambiental AQUA HQE e o Programa Brasileiro de Eficiência Energética PROCEL EDIFICA. Entretanto, houve pouca integração da equipe de projeto através do modelo BIM. Esse artigo apresenta a análise da adoção da Plataforma BIM no projeto de reabilitação do edifício, através do método da Análise de Árvore de Falhas (AAF). Os resultados indicam que o BIM não foi considerado desde o início e a consequência foi a pouca integração do processo de projeto. Entende-se que as funcionalidades do BIM poderiam ter trazido mais dinamismo e integração à gestão do processo de projeto. Portanto, é necessário rever o processo de projeto para incorporar as potencialidades do BIM desde o início do processo, permitindo o trabalho colaborativo.Universidade Estadual de Campinas2017-03-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionRevisão de literatura; Estudo de caso; Pesquisa empírica de campoCase studyapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/864920010.20396/parc.v8i1.8649200PARC Pesquisa em Arquitetura e Construção; Vol. 8 No. 1 (2017); 3-19PARC Pesquisa em Arquitetura e Construção; Vol. 8 Núm. 1 (2017); 3-19PARC Pesquisa em Arquitetura e Construção; v. 8 n. 1 (2017); 3-191980-6809reponame:PARC (Campinas)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPenghttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8649200/16690Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construçãoinfo:eu-repo/semantics/openAccessSilva, Fabiana Dias daSalgado, Mônica Santos2019-06-17T15:19:28Zoai:ojs.periodicos.sbu.unicamp.br:article/8649200Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/parcPUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/oai||parc@fec.unicamp.br1980-68091980-6809opendoar:2022-11-08T14:24:38.059248PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)false |
dc.title.none.fl_str_mv |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation O uso do FTA para avaliar o potencial da plataforma BIM na reabilitação de edifício |
title |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
spellingShingle |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation Silva, Fabiana Dias da Rehabilitation. Environmental quality. BIM. Reabilitação. Qualidade ambiental. BIM. FTA. |
title_short |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
title_full |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
title_fullStr |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
title_full_unstemmed |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
title_sort |
The use of FTA to evaluate the potential of BIM platform in building rehabilitation |
author |
Silva, Fabiana Dias da |
author_facet |
Silva, Fabiana Dias da Salgado, Mônica Santos |
author_role |
author |
author2 |
Salgado, Mônica Santos |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Silva, Fabiana Dias da Salgado, Mônica Santos |
dc.subject.por.fl_str_mv |
Rehabilitation. Environmental quality. BIM. Reabilitação. Qualidade ambiental. BIM. FTA. |
topic |
Rehabilitation. Environmental quality. BIM. Reabilitação. Qualidade ambiental. BIM. FTA. |
description |
Several studies recognize the potential of interventions in existing buildings to reduce the consumption of natural resources and the use of new lands. In the context of sustainable design, the adoption of alternatives to support the integrated design and collaborative work - as Building Information Modeling (BIM) - offers a great potential to identify and propose interventions that implement sustainable practices equally - in new buildings as well as in the rehabilitation of existing ones. A case study was performed on the rehabilitation design process of the headquarters of PETROBRAS, in the city of Rio de Janeiro. The main purpose was to identify the potential of the BIM Platform for the improvement of the environmental performance of the building - one of the exigencies of the rehabilitation process - which had considered the requirements of the AQUA HQE environmental assessment and the Brazilian program of energy efficiency, the PROCEL EDIFICA, as its parameters. However, there was little integration among the design team and the BIM model. This article presents the results of the analysis of BIM Platform used in the design rehabilitation process of the given building, by using the FTA – the Fault Tree Analysis Method. The results indicate that BIM had not been considered from the beginning and the consequence was the low integration of the design process. BIM functionalities could, in turn, have brought more dynamism and integration to the design management process. Therefore, it is necessary to review the design process, in order to incorporate BIM potentialities since the beginning of the process and allow the collaborative work. |
publishDate |
2017 |
dc.date.none.fl_str_mv |
2017-03-30 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Revisão de literatura; Estudo de caso; Pesquisa empírica de campo Case study |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8649200 10.20396/parc.v8i1.8649200 |
url |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8649200 |
identifier_str_mv |
10.20396/parc.v8i1.8649200 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8649200/16690 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Estadual de Campinas |
publisher.none.fl_str_mv |
Universidade Estadual de Campinas |
dc.source.none.fl_str_mv |
PARC Pesquisa em Arquitetura e Construção; Vol. 8 No. 1 (2017); 3-19 PARC Pesquisa em Arquitetura e Construção; Vol. 8 Núm. 1 (2017); 3-19 PARC Pesquisa em Arquitetura e Construção; v. 8 n. 1 (2017); 3-19 1980-6809 reponame:PARC (Campinas) instname:Universidade Estadual de Campinas (UNICAMP) instacron:UNICAMP |
instname_str |
Universidade Estadual de Campinas (UNICAMP) |
instacron_str |
UNICAMP |
institution |
UNICAMP |
reponame_str |
PARC (Campinas) |
collection |
PARC (Campinas) |
repository.name.fl_str_mv |
PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP) |
repository.mail.fl_str_mv |
||parc@fec.unicamp.br |
_version_ |
1800216629125054464 |