Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users
Autor(a) principal: | |
---|---|
Data de Publicação: | 2012 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Gestão e Projetos (GeP) |
Texto Completo: | https://periodicos.uninove.br/gep/article/view/9555 |
Resumo: | To attend Brazil‘s energy demands, considering the typical seasonality of Brazilian climates conditions, part of the energy available in the national electrical system has been generated from natural gas power plant (in the most recent years). This paper analyses a case of technology transfer with focus on end-users, observing theirs perception in relation to attributes of technological tool installed, a control and monitoring system. The case, developed in a thermoelectric power plant, has four organizations participants: the thermoelectric power plant that bought the technology, the company that will operate with the new technology, a research institution that helped out on the selection process and adjustments of technological tool to local necessities and the international supplier of the technology. This work used qualitative and quantitative methodology to arrive its purpose. Between the findings, there are some differences on perception of attributes for some users groups. Given the relevance of technological tool acquired, it‘s possible that communications actions and technical trainings would be necessaries to ensure that users know all the functionalities of new system, its advantages in relation to previous system and its compatibility with power plant‘s technical process. The technological dependency of foreign companies and necessities of adjustments to schedule of technological tool installation contributed for a partial transference of the technology observed, demanding future researches to check the overcoming of these limitations. |
id |
UNINOVE-4_2b00d4ff59b55b65f6e32a57dd80fa33 |
---|---|
oai_identifier_str |
oai:https://periodicos.uninove.br:article/9555 |
network_acronym_str |
UNINOVE-4 |
network_name_str |
Revista Gestão e Projetos (GeP) |
repository_id_str |
|
spelling |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End UsersPercepção dos Atributos de uma Inovação por Parte dos Profissionais de Operação e Manutenção de uma Usina Termelétrica: Um Caso de Transferência de Tecnologia com Foco nos Usuários FinaisTechnology Transfer; Distributed Control System; Thermoelectric Power Plant.Transferência de Tecnologia; Sistema de Controle Distribuído; Usina Termoelétrica.To attend Brazil‘s energy demands, considering the typical seasonality of Brazilian climates conditions, part of the energy available in the national electrical system has been generated from natural gas power plant (in the most recent years). This paper analyses a case of technology transfer with focus on end-users, observing theirs perception in relation to attributes of technological tool installed, a control and monitoring system. The case, developed in a thermoelectric power plant, has four organizations participants: the thermoelectric power plant that bought the technology, the company that will operate with the new technology, a research institution that helped out on the selection process and adjustments of technological tool to local necessities and the international supplier of the technology. This work used qualitative and quantitative methodology to arrive its purpose. Between the findings, there are some differences on perception of attributes for some users groups. Given the relevance of technological tool acquired, it‘s possible that communications actions and technical trainings would be necessaries to ensure that users know all the functionalities of new system, its advantages in relation to previous system and its compatibility with power plant‘s technical process. The technological dependency of foreign companies and necessities of adjustments to schedule of technological tool installation contributed for a partial transference of the technology observed, demanding future researches to check the overcoming of these limitations.Para atender as demandas de energia do país, considerando as eventuais sazonalidades inerentes às condições climáticas brasileiras, parte da energia disponibilizada no sistema elétrico nacional tem sido originada (nos anos mais recentes) a partir das usinas que geram eletricidade utilizando o gás natural. O presente trabalho possui como objetivo analisar um caso de transferência de tecnologia com foco no usuário final, observando qual é a sua percepção com relação aos atributos da ferramenta tecnológica implantada, um sistema de controle e monitoramento. O caso, desenvolvido em uma usina termoelétrica, abrange a participação de quatro organizações: a usina termelétrica que adquiriu a tecnologia, a empresa que vai operar com a nova tecnologia, um instituto de pesquisa que auxiliou no processo de seleção e ajustes da ferramenta tecnológica às necessidades locais e a empresa internacional fornecedora. Utilizou-se a metodologia qualitativa e quantitativa para o alcance dos propósitos da pesquisa. Entre os achados, verificaram-se algumas diferenças na percepção de atributos por determinados grupos de usuários. Dada a relevância do ferramenta tecnológica adquirida, é possível que ações de comunicação e treinamentos técnicos sejam necessários de modo a assegurar que os usuários conheçam todas as funcionalidades do novo sistema, suas vantagens em relação ao sistema anteriormente usado e sua compatibilidade com as rotinas técnicas da usina objeto do estudo. A dependência tecnológica de empresas estrangeiras e as necessidades de ajustes aos cronogramas de implantação da ferramenta tecnológica contribuíram para a transferência parcial de tecnologia observada, demandando pesquisas futuras para a verificação da superação desta limitação.DOI:10.5585/gep.v3i3.59Universidade Nove de Julho (Uninove)Mussi, Fabricio BaronCanuto, Kleber Cuissi2012-12-29info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/955510.5585/gep.v3i3.59Revista de Gestão e Projetos; v. 3, n. 3 (2012): setembro-dezembro; 28-572236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9555/4299Direitos autorais 2013 Fabricio Baron Mussi, Kleber Cuissi Canutoinfo:eu-repo/semantics/openAccess2019-05-27T21:07:53Zoai:https://periodicos.uninove.br:article/9555Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:07:53Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false |
dc.title.none.fl_str_mv |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users Percepção dos Atributos de uma Inovação por Parte dos Profissionais de Operação e Manutenção de uma Usina Termelétrica: Um Caso de Transferência de Tecnologia com Foco nos Usuários Finais |
title |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
spellingShingle |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users Mussi, Fabricio Baron Technology Transfer; Distributed Control System; Thermoelectric Power Plant. Transferência de Tecnologia; Sistema de Controle Distribuído; Usina Termoelétrica. |
title_short |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
title_full |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
title_fullStr |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
title_full_unstemmed |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
title_sort |
Perception of Theattributes of a Professional of Innovation by Operation and Maintenance of a Thermal Power Plant: A Case for Technology Transfer to Focus On End Users |
author |
Mussi, Fabricio Baron |
author_facet |
Mussi, Fabricio Baron Canuto, Kleber Cuissi |
author_role |
author |
author2 |
Canuto, Kleber Cuissi |
author2_role |
author |
dc.contributor.none.fl_str_mv |
|
dc.contributor.author.fl_str_mv |
Mussi, Fabricio Baron Canuto, Kleber Cuissi |
dc.subject.por.fl_str_mv |
Technology Transfer; Distributed Control System; Thermoelectric Power Plant. Transferência de Tecnologia; Sistema de Controle Distribuído; Usina Termoelétrica. |
topic |
Technology Transfer; Distributed Control System; Thermoelectric Power Plant. Transferência de Tecnologia; Sistema de Controle Distribuído; Usina Termoelétrica. |
description |
To attend Brazil‘s energy demands, considering the typical seasonality of Brazilian climates conditions, part of the energy available in the national electrical system has been generated from natural gas power plant (in the most recent years). This paper analyses a case of technology transfer with focus on end-users, observing theirs perception in relation to attributes of technological tool installed, a control and monitoring system. The case, developed in a thermoelectric power plant, has four organizations participants: the thermoelectric power plant that bought the technology, the company that will operate with the new technology, a research institution that helped out on the selection process and adjustments of technological tool to local necessities and the international supplier of the technology. This work used qualitative and quantitative methodology to arrive its purpose. Between the findings, there are some differences on perception of attributes for some users groups. Given the relevance of technological tool acquired, it‘s possible that communications actions and technical trainings would be necessaries to ensure that users know all the functionalities of new system, its advantages in relation to previous system and its compatibility with power plant‘s technical process. The technological dependency of foreign companies and necessities of adjustments to schedule of technological tool installation contributed for a partial transference of the technology observed, demanding future researches to check the overcoming of these limitations. |
publishDate |
2012 |
dc.date.none.fl_str_mv |
2012-12-29 |
dc.type.none.fl_str_mv |
|
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9555 10.5585/gep.v3i3.59 |
url |
https://periodicos.uninove.br/gep/article/view/9555 |
identifier_str_mv |
10.5585/gep.v3i3.59 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9555/4299 |
dc.rights.driver.fl_str_mv |
Direitos autorais 2013 Fabricio Baron Mussi, Kleber Cuissi Canuto info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Direitos autorais 2013 Fabricio Baron Mussi, Kleber Cuissi Canuto |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
dc.source.none.fl_str_mv |
Revista de Gestão e Projetos; v. 3, n. 3 (2012): setembro-dezembro; 28-57 2236-0972 reponame:Revista Gestão e Projetos (GeP) instname:Universidade Nove de Julho (UNINOVE) instacron:UNINOVE |
instname_str |
Universidade Nove de Julho (UNINOVE) |
instacron_str |
UNINOVE |
institution |
UNINOVE |
reponame_str |
Revista Gestão e Projetos (GeP) |
collection |
Revista Gestão e Projetos (GeP) |
repository.name.fl_str_mv |
Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE) |
repository.mail.fl_str_mv |
gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br |
_version_ |
1797052865362001920 |