The Problem of Resource Allocation and Selection of Multiple Projects It

Detalhes bibliográficos
Autor(a) principal: Negreiros, Marcos
Data de Publicação: 2013
Outros Autores: Barbosa, Willame Tiberio
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista Gestão e Projetos (GeP)
Texto Completo: https://periodicos.uninove.br/gep/article/view/9577
Resumo: The organizations that have projects occurring simultaneously are faced with the task of selecting the projects according to some criterion, and the need to allocate resources to certain projects in certain times. The problem RCPSP (Resource-Constrained Project Scheduling Problem) belongs to the class of  NP-Complete problems, considers perform optimal schedules with resource constraints. This issue remains a challenge, even though the origin in 1960‘s decade, mainly due to its combinatorial nature. The objective of this study is to evaluate the use of exact optimization techniques in order to obtain an optimal allocation of resources to the activities of multiple IT projects that use agile methodologies (Scrum), considering resource constraints (analysts and programmers), aimed to build schedules between integrated multi-projects. This is a necessity of project management process once the difficulties and time consuming task related in the preparation of the resource assignment in reasonable time. This work shows a new approach that work towards the priorities of projects and the aspects of their progress to be implemented during a certain time horizon. We show that the model can be used in reasonable time to prepare real projects limited to 9.
id UNINOVE-4_5f885ea47f494b543e813c6aa93f1cc1
oai_identifier_str oai:https://periodicos.uninove.br:article/9577
network_acronym_str UNINOVE-4
network_name_str Revista Gestão e Projetos (GeP)
repository_id_str
spelling The Problem of Resource Allocation and Selection of Multiple Projects ItO Problema de Alocação de Recursos e Seleção de Múltiplos Projetos de TIRCPSP; múltiplos projetos de TI; Modelagem Matemática;The organizations that have projects occurring simultaneously are faced with the task of selecting the projects according to some criterion, and the need to allocate resources to certain projects in certain times. The problem RCPSP (Resource-Constrained Project Scheduling Problem) belongs to the class of  NP-Complete problems, considers perform optimal schedules with resource constraints. This issue remains a challenge, even though the origin in 1960‘s decade, mainly due to its combinatorial nature. The objective of this study is to evaluate the use of exact optimization techniques in order to obtain an optimal allocation of resources to the activities of multiple IT projects that use agile methodologies (Scrum), considering resource constraints (analysts and programmers), aimed to build schedules between integrated multi-projects. This is a necessity of project management process once the difficulties and time consuming task related in the preparation of the resource assignment in reasonable time. This work shows a new approach that work towards the priorities of projects and the aspects of their progress to be implemented during a certain time horizon. We show that the model can be used in reasonable time to prepare real projects limited to 9.As organizações que possuem projetos ocorrendo simultaneamente se deparam com a tarefa de selecioná-los segundo algum critério, bem como, a necessidade de alocação de recursos certos aos projetos certos nos tempos certos. O problema de RCPSP (Resource-Constrained Project Scheduling Problem) é um problema difícil que pertence à classe de problemas NP-Hard. Nele pretende-se criar cronogramas com restrições de recursos. Este problema continua desafiador, mesmo tendo origem na década de 1960, devido essencialmente a sua natureza combinatória. O objetivo deste trabalho é avaliar a utilização de técnicas exatas de otimização, no intuito de obter uma alocação ótima de recursos às atividades de múltiplos projetos de TI que usam metodologias ágeis (Scrum), considerando restrição de recursos (analistas e programadores), visando à construção de cronogramas de múltiplos projetos integrados. Utiliza-se neste trabalho uma nova abordagem no sentido de se encontrar a atribuição ótima de projetos considerando as suas prioridades relativas, e a avaliação poder ser realizada para um horizonte de planejamento ou enquanto estão em andamento. Mostramos que nosso modelo promove uma adequada avaliação de atribuição ótima de recursos de TI num contexto real de gestão de projetos para instâncias com até 9 projetos.DOI:10.5585/gep.v4i2.125Universidade Nove de Julho (Uninove)Negreiros, MarcosBarbosa, Willame Tiberio2013-08-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/957710.5585/gep.v4i2.125Revista de Gestão e Projetos; v. 4, n. 2 (2013): maio-agosto; 27-492236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9577/4321Direitos autorais 2013 Marcos Negreiros, Willame Tiberio Barbosainfo:eu-repo/semantics/openAccess2019-05-27T21:08:41Zoai:https://periodicos.uninove.br:article/9577Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:08:41Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false
dc.title.none.fl_str_mv The Problem of Resource Allocation and Selection of Multiple Projects It
O Problema de Alocação de Recursos e Seleção de Múltiplos Projetos de TI
title The Problem of Resource Allocation and Selection of Multiple Projects It
spellingShingle The Problem of Resource Allocation and Selection of Multiple Projects It
Negreiros, Marcos
RCPSP; múltiplos projetos de TI; Modelagem Matemática;
title_short The Problem of Resource Allocation and Selection of Multiple Projects It
title_full The Problem of Resource Allocation and Selection of Multiple Projects It
title_fullStr The Problem of Resource Allocation and Selection of Multiple Projects It
title_full_unstemmed The Problem of Resource Allocation and Selection of Multiple Projects It
title_sort The Problem of Resource Allocation and Selection of Multiple Projects It
author Negreiros, Marcos
author_facet Negreiros, Marcos
Barbosa, Willame Tiberio
author_role author
author2 Barbosa, Willame Tiberio
author2_role author
dc.contributor.none.fl_str_mv
dc.contributor.author.fl_str_mv Negreiros, Marcos
Barbosa, Willame Tiberio
dc.subject.por.fl_str_mv RCPSP; múltiplos projetos de TI; Modelagem Matemática;
topic RCPSP; múltiplos projetos de TI; Modelagem Matemática;
description The organizations that have projects occurring simultaneously are faced with the task of selecting the projects according to some criterion, and the need to allocate resources to certain projects in certain times. The problem RCPSP (Resource-Constrained Project Scheduling Problem) belongs to the class of  NP-Complete problems, considers perform optimal schedules with resource constraints. This issue remains a challenge, even though the origin in 1960‘s decade, mainly due to its combinatorial nature. The objective of this study is to evaluate the use of exact optimization techniques in order to obtain an optimal allocation of resources to the activities of multiple IT projects that use agile methodologies (Scrum), considering resource constraints (analysts and programmers), aimed to build schedules between integrated multi-projects. This is a necessity of project management process once the difficulties and time consuming task related in the preparation of the resource assignment in reasonable time. This work shows a new approach that work towards the priorities of projects and the aspects of their progress to be implemented during a certain time horizon. We show that the model can be used in reasonable time to prepare real projects limited to 9.
publishDate 2013
dc.date.none.fl_str_mv 2013-08-30
dc.type.none.fl_str_mv

dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.uninove.br/gep/article/view/9577
10.5585/gep.v4i2.125
url https://periodicos.uninove.br/gep/article/view/9577
identifier_str_mv 10.5585/gep.v4i2.125
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.uninove.br/gep/article/view/9577/4321
dc.rights.driver.fl_str_mv Direitos autorais 2013 Marcos Negreiros, Willame Tiberio Barbosa
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Direitos autorais 2013 Marcos Negreiros, Willame Tiberio Barbosa
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Nove de Julho (Uninove)
publisher.none.fl_str_mv Universidade Nove de Julho (Uninove)
dc.source.none.fl_str_mv Revista de Gestão e Projetos; v. 4, n. 2 (2013): maio-agosto; 27-49
2236-0972
reponame:Revista Gestão e Projetos (GeP)
instname:Universidade Nove de Julho (UNINOVE)
instacron:UNINOVE
instname_str Universidade Nove de Julho (UNINOVE)
instacron_str UNINOVE
institution UNINOVE
reponame_str Revista Gestão e Projetos (GeP)
collection Revista Gestão e Projetos (GeP)
repository.name.fl_str_mv Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)
repository.mail.fl_str_mv gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br
_version_ 1797052865229881344