Resumo: The daily schedule of hydroelectric plants aims to determine which units will be operating and their respective generation levels for the following day. The representation of this process is subject to imperfections in the representation of reality due to the multiple uncertainties that condition it. The present work focused on exploring considerations about the resolution method, on the assumptions of the problem and on its uncertainties in the optimization of the problem. The work methodology is divided into three stages. The work methodology is divided into three stages, applied in a modeling/formulation of the unit commitment problem present in the literature. The first step consists of developing an alternative solution methodology, based on Constructive Heuristics. In turn, in the second stage, changes in the modeling are analyzed/proposed of the problem in order to verify possible gains for those involved. Finally, the third step is to consider uncertainties in the modeling, in this case the forecasts of daily flows natural tributaries to each plant in the cascade are considered uncertain. The use of the alternative strategy to solve the problem proved to be an approach capable of providing a solution for the case studied. In regarding the second stage, two modifications of the original problem were carried out. In the first change, it was verified that the flexibility of the hourly restriction of attendance of the generation target increases the efficiency in the studied operation points. In the same sense, making it more flexible to meet the aggregate generation target for the entire cascade also improves the cascade’s operating point. The results of the third stage concern the insertion of hydrological uncertainties in the original problem. For the model adopted, there was no difference in the number of units dispatched per plant per time step, considering the variation of inflows. Finally, as a conclusion, the methodology proved to be able to explore different alterations of an original problem from the literature and evaluate its impact on results.
id UNIOESTE-1_b762a30af5458dfefcca60d819bf2558
oai_identifier_str oai:tede.unioeste.br:tede/6299
network_acronym_str UNIOESTE-1
network_name_str Biblioteca Digital de Teses e Dissertações do UNIOESTE
repository_id_str
spelling Rocha, Carlos Roberto Mendonça dahttp://lattes.cnpq.br/4658529903411274Motter, Danielhttp://lattes.cnpq.br/2485951756714882Scuzziato, Murilo Reolonhttp://lattes.cnpq.br/0940716462707317Freitas, Ricardo Luiz Barros dehttp://lattes.cnpq.br/2930318641344862http://lattes.cnpq.br/3497838643314993Kazay, Daniel Firmo2022-11-16T18:59:17Z2022-08-03Kazay, Daniel Firmo. Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas. 2022. 96 f. Dissertação (Programa de Pós-Graduação em Engenharia Elétrica e Computação) - Universidade Estadual do Oeste do Paraná, Foz do Iguaçu-PR.https://tede.unioeste.br/handle/tede/6299The daily schedule of hydroelectric plants aims to determine which units will be operating and their respective generation levels for the following day. The representation of this process is subject to imperfections in the representation of reality due to the multiple uncertainties that condition it. The present work focused on exploring considerations about the resolution method, on the assumptions of the problem and on its uncertainties in the optimization of the problem. The work methodology is divided into three stages. The work methodology is divided into three stages, applied in a modeling/formulation of the unit commitment problem present in the literature. The first step consists of developing an alternative solution methodology, based on Constructive Heuristics. In turn, in the second stage, changes in the modeling are analyzed/proposed of the problem in order to verify possible gains for those involved. Finally, the third step is to consider uncertainties in the modeling, in this case the forecasts of daily flows natural tributaries to each plant in the cascade are considered uncertain. The use of the alternative strategy to solve the problem proved to be an approach capable of providing a solution for the case studied. In regarding the second stage, two modifications of the original problem were carried out. In the first change, it was verified that the flexibility of the hourly restriction of attendance of the generation target increases the efficiency in the studied operation points. In the same sense, making it more flexible to meet the aggregate generation target for the entire cascade also improves the cascade’s operating point. The results of the third stage concern the insertion of hydrological uncertainties in the original problem. For the model adopted, there was no difference in the number of units dispatched per plant per time step, considering the variation of inflows. Finally, as a conclusion, the methodology proved to be able to explore different alterations of an original problem from the literature and evaluate its impact on results.A programação diária de usinas hidrelétricas busca determinar quais unidades estarão operando e os seus respectivos níveis de geração para o dia seguinte. A representação desse processo está sujeita a imperfeições na representação da realidade em função das múltiplas incertezas que o condicionam. A presente dissertação teve como foco explorar considerações sobre o método de resolução, sobre as premissas do problema e sobre suas incertezas na otimização da programação. A metodologia do trabalho está dividida em três etapas, aplicadas em uma modelagem/formulação do problema de unit commitment presente na literatura. A primeira etapa consiste em desenvolver uma metodologia de solução alternativa, baseada em Heurísticas Construtivas. Por sua vez, na segunda etapa, são analisadas/propostas modificações na modelagem do problema com o objetivo de verificar possíveis ganhos para os envolvidos. Por fim, a terceira etapa consiste em considerar incertezas na modelagem, neste caso as previsões de vazões diárias naturais afluentes à cada usina da cascata são consideradas incertas. O uso da estratégia alternativa para resolução do problema se mostrou uma abordagem capaz de fornecer uma solução para o caso estudado. Em relação à segunda etapa, foram realizadas duas modificações do problema original. Na primeira alteração, foi verificado que a flexibilização da restrição horária de atendimento da meta de geração aumenta a eficiência nos pontos de operação estudados. Nesse mesmo sentido, a flexibilização de atendimento a meta de geração agregada para toda a cascata também aprimora o ponto de operação da cascata. Os resultados da terceira etapa dizem respeito à inserção das incertezas hidrológicas no problema original. Para a modelagem adotada, não houve diferença no número de unidades despachadas por usina por passo temporal, considerando a variação das vazões afluentes. Por fim, como conclusão, a metodologia se mostrou capaz de explorar diferentes alterações de um problema original da literatura e avaliar seus impactos nos resultados.Submitted by Katia Abreu (katia.abreu@unioeste.br) on 2022-11-16T18:59:17Z No. of bitstreams: 2 Daniel_Firmo_Kazay_2022.pdf: 2422342 bytes, checksum: ef321ebc01a84ea94eaf3be138ba2edf (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)Made available in DSpace on 2022-11-16T18:59:17Z (GMT). No. of bitstreams: 2 Daniel_Firmo_Kazay_2022.pdf: 2422342 bytes, checksum: ef321ebc01a84ea94eaf3be138ba2edf (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2022-08-03application/pdfpor8774263440366006536500Universidade Estadual do Oeste do ParanáFoz do IguaçuPrograma de Pós-Graduação em Engenharia Elétrica e ComputaçãoUNIOESTEBrasilCentro de Engenharias e Ciências Exatashttp://creativecommons.org/licenses/by-nc-nd/4.0/info:eu-repo/semantics/openAccessProgramação diária da operaçãoOtimizaçãoIncertezas hidrológicasDaily operation scheduleOptimizationHydrological uncertaintiesENGENHARIAS::ENGENHARIA ELETRICAModelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicasModel for optimizing the daily schedule of the operation of cascade hydroelectric powerplants with the consideration of hydrological uncertaintiesinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis-1040084669565072649600600600-7734402124082146922-1431013593610671097reponame:Biblioteca Digital de Teses e Dissertações do UNIOESTEinstname:Universidade Estadual do Oeste do Paraná (UNIOESTE)instacron:UNIOESTEORIGINALDaniel_Firmo_Kazay_2022.pdfDaniel_Firmo_Kazay_2022.pdfapplication/pdf2422342http://tede.unioeste.br:8080/tede/bitstream/tede/6299/5/Daniel_Firmo_Kazay_2022.pdfef321ebc01a84ea94eaf3be138ba2edfMD55CC-LICENSElicense_urllicense_urltext/plain; charset=utf-849http://tede.unioeste.br:8080/tede/bitstream/tede/6299/2/license_url4afdbb8c545fd630ea7db775da747b2fMD52license_textlicense_texttext/html; charset=utf-80http://tede.unioeste.br:8080/tede/bitstream/tede/6299/3/license_textd41d8cd98f00b204e9800998ecf8427eMD53license_rdflicense_rdfapplication/rdf+xml; charset=utf-80http://tede.unioeste.br:8080/tede/bitstream/tede/6299/4/license_rdfd41d8cd98f00b204e9800998ecf8427eMD54LICENSElicense.txtlicense.txttext/plain; charset=utf-82165http://tede.unioeste.br:8080/tede/bitstream/tede/6299/1/license.txtbd3efa91386c1718a7f26a329fdcb468MD51tede/62992022-11-16 15:59:17.746oai:tede.unioeste.br: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Biblioteca Digital de Teses e Dissertaçõeshttp://tede.unioeste.br/PUBhttp://tede.unioeste.br/oai/requestbiblioteca.repositorio@unioeste.bropendoar:2022-11-16T18:59:17Biblioteca Digital de Teses e Dissertações do UNIOESTE - Universidade Estadual do Oeste do Paraná (UNIOESTE)false
dc.title.por.fl_str_mv Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
dc.title.alternative.eng.fl_str_mv Model for optimizing the daily schedule of the operation of cascade hydroelectric powerplants with the consideration of hydrological uncertainties
title Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
spellingShingle Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
Kazay, Daniel Firmo
Programação diária da operação
Otimização
Incertezas hidrológicas
Daily operation schedule
Optimization
Hydrological uncertainties
ENGENHARIAS::ENGENHARIA ELETRICA
title_short Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
title_full Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
title_fullStr Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
title_full_unstemmed Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
title_sort Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas
author Kazay, Daniel Firmo
author_facet Kazay, Daniel Firmo
author_role author
dc.contributor.advisor1.fl_str_mv Rocha, Carlos Roberto Mendonça da
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/4658529903411274
dc.contributor.referee1.fl_str_mv Motter, Daniel
dc.contributor.referee1Lattes.fl_str_mv http://lattes.cnpq.br/2485951756714882
dc.contributor.referee2.fl_str_mv Scuzziato, Murilo Reolon
dc.contributor.referee2Lattes.fl_str_mv http://lattes.cnpq.br/0940716462707317
dc.contributor.referee3.fl_str_mv Freitas, Ricardo Luiz Barros de
dc.contributor.referee3Lattes.fl_str_mv http://lattes.cnpq.br/2930318641344862
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/3497838643314993
dc.contributor.author.fl_str_mv Kazay, Daniel Firmo
contributor_str_mv Rocha, Carlos Roberto Mendonça da
Motter, Daniel
Scuzziato, Murilo Reolon
Freitas, Ricardo Luiz Barros de
dc.subject.por.fl_str_mv Programação diária da operação
Otimização
Incertezas hidrológicas
topic Programação diária da operação
Otimização
Incertezas hidrológicas
Daily operation schedule
Optimization
Hydrological uncertainties
ENGENHARIAS::ENGENHARIA ELETRICA
dc.subject.eng.fl_str_mv Daily operation schedule
Optimization
Hydrological uncertainties
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA ELETRICA
description The daily schedule of hydroelectric plants aims to determine which units will be operating and their respective generation levels for the following day. The representation of this process is subject to imperfections in the representation of reality due to the multiple uncertainties that condition it. The present work focused on exploring considerations about the resolution method, on the assumptions of the problem and on its uncertainties in the optimization of the problem. The work methodology is divided into three stages. The work methodology is divided into three stages, applied in a modeling/formulation of the unit commitment problem present in the literature. The first step consists of developing an alternative solution methodology, based on Constructive Heuristics. In turn, in the second stage, changes in the modeling are analyzed/proposed of the problem in order to verify possible gains for those involved. Finally, the third step is to consider uncertainties in the modeling, in this case the forecasts of daily flows natural tributaries to each plant in the cascade are considered uncertain. The use of the alternative strategy to solve the problem proved to be an approach capable of providing a solution for the case studied. In regarding the second stage, two modifications of the original problem were carried out. In the first change, it was verified that the flexibility of the hourly restriction of attendance of the generation target increases the efficiency in the studied operation points. In the same sense, making it more flexible to meet the aggregate generation target for the entire cascade also improves the cascade’s operating point. The results of the third stage concern the insertion of hydrological uncertainties in the original problem. For the model adopted, there was no difference in the number of units dispatched per plant per time step, considering the variation of inflows. Finally, as a conclusion, the methodology proved to be able to explore different alterations of an original problem from the literature and evaluate its impact on results.
publishDate 2022
dc.date.accessioned.fl_str_mv 2022-11-16T18:59:17Z
dc.date.issued.fl_str_mv 2022-08-03
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv Kazay, Daniel Firmo. Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas. 2022. 96 f. Dissertação (Programa de Pós-Graduação em Engenharia Elétrica e Computação) - Universidade Estadual do Oeste do Paraná, Foz do Iguaçu-PR.
dc.identifier.uri.fl_str_mv https://tede.unioeste.br/handle/tede/6299
identifier_str_mv Kazay, Daniel Firmo. Modelo para otimização da programação diária da operação de usinas hidrelétricas em cascata com a consideração das incertezas hidrológicas. 2022. 96 f. Dissertação (Programa de Pós-Graduação em Engenharia Elétrica e Computação) - Universidade Estadual do Oeste do Paraná, Foz do Iguaçu-PR.
url https://tede.unioeste.br/handle/tede/6299
dc.language.iso.fl_str_mv por
language por
dc.relation.program.fl_str_mv -1040084669565072649
dc.relation.confidence.fl_str_mv 600
600
600
dc.relation.department.fl_str_mv -7734402124082146922
dc.relation.cnpq.fl_str_mv -1431013593610671097
dc.rights.driver.fl_str_mv http://creativecommons.org/licenses/by-nc-nd/4.0/
info:eu-repo/semantics/openAccess
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-nd/4.0/
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual do Oeste do Paraná
Foz do Iguaçu
dc.publisher.program.fl_str_mv Programa de Pós-Graduação em Engenharia Elétrica e Computação
dc.publisher.initials.fl_str_mv UNIOESTE
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Centro de Engenharias e Ciências Exatas
publisher.none.fl_str_mv Universidade Estadual do Oeste do Paraná
Foz do Iguaçu
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações do UNIOESTE
instname:Universidade Estadual do Oeste do Paraná (UNIOESTE)
instacron:UNIOESTE
instname_str Universidade Estadual do Oeste do Paraná (UNIOESTE)
instacron_str UNIOESTE
institution UNIOESTE
reponame_str Biblioteca Digital de Teses e Dissertações do UNIOESTE
collection Biblioteca Digital de Teses e Dissertações do UNIOESTE
bitstream.url.fl_str_mv http://tede.unioeste.br:8080/tede/bitstream/tede/6299/5/Daniel_Firmo_Kazay_2022.pdf
http://tede.unioeste.br:8080/tede/bitstream/tede/6299/2/license_url
http://tede.unioeste.br:8080/tede/bitstream/tede/6299/3/license_text
http://tede.unioeste.br:8080/tede/bitstream/tede/6299/4/license_rdf
http://tede.unioeste.br:8080/tede/bitstream/tede/6299/1/license.txt
bitstream.checksum.fl_str_mv ef321ebc01a84ea94eaf3be138ba2edf
4afdbb8c545fd630ea7db775da747b2f
d41d8cd98f00b204e9800998ecf8427e
d41d8cd98f00b204e9800998ecf8427e
bd3efa91386c1718a7f26a329fdcb468
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações do UNIOESTE - Universidade Estadual do Oeste do Paraná (UNIOESTE)
repository.mail.fl_str_mv biblioteca.repositorio@unioeste.br
_version_ 1811723463816118272