A Multiobjective Model for Distribution System Planning based on Tabu Search
Autor(a) principal: | |
---|---|
Data de Publicação: | 2013 |
Outros Autores: | , , , |
Tipo de documento: | Artigo de conferência |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UNESP |
Texto Completo: | http://hdl.handle.net/11449/196089 |
Resumo: | This paper presents a multiobjective model for the multistage planning problem of a distribution system. The problem is formulated as a multiobjective mixed integer nonlinear programming model. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalizing switches and construction of tie lines. Taking into account these actions, the objective functions used in this model are the investment and operational costs as well as the system's reliability under contingencies using an n-1 criterion. Reliability is calculated by means of the non-supplied energy. To solve the proposed multiobjective model a multiobjective tabu search method is used. Numerical results are presented for a 54-bus system. |
id |
UNSP_370619f9b9d074f34ad35abe8bb36fa1 |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/196089 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
A Multiobjective Model for Distribution System Planning based on Tabu SearchDistribution system planningmultiobjective optimizationreliabilitytabu searchThis paper presents a multiobjective model for the multistage planning problem of a distribution system. The problem is formulated as a multiobjective mixed integer nonlinear programming model. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalizing switches and construction of tie lines. Taking into account these actions, the objective functions used in this model are the investment and operational costs as well as the system's reliability under contingencies using an n-1 criterion. Reliability is calculated by means of the non-supplied energy. To solve the proposed multiobjective model a multiobjective tabu search method is used. Numerical results are presented for a 54-bus system.Sao Paulo State Univ, UNESP, Dept Elect Engn, Ilha Solteira, BrazilSao Paulo State Univ, UNESP, Dept Math, Ilha Solteira, BrazilUniv Castilla La Mancha, ETS Ingenieros Ind, Ciudad Real, SpainSao Paulo State Univ, UNESP, Dept Elect Engn, Ilha Solteira, BrazilSao Paulo State Univ, UNESP, Dept Math, Ilha Solteira, BrazilIeeeUniversidade Estadual Paulista (Unesp)Univ Castilla La ManchaPereira Junior, Benvindo Rodrigues [UNESP]Sanches Mantovani, Jose Roberto [UNESP]Cossi, Antonio Marcos [UNESP]Contreras, JavierIEEE2020-12-10T19:33:03Z2020-12-10T19:33:03Z2013-01-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObject62013 Ieee Grenoble Powertech (powertech). New York: Ieee, 6 p., 2013.http://hdl.handle.net/11449/196089WOS:000387091900037Web of Sciencereponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPeng2013 Ieee Grenoble Powertech (powertech)info:eu-repo/semantics/openAccess2024-07-10T15:42:07Zoai:repositorio.unesp.br:11449/196089Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T23:43:19.713628Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
title |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
spellingShingle |
A Multiobjective Model for Distribution System Planning based on Tabu Search Pereira Junior, Benvindo Rodrigues [UNESP] Distribution system planning multiobjective optimization reliability tabu search |
title_short |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
title_full |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
title_fullStr |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
title_full_unstemmed |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
title_sort |
A Multiobjective Model for Distribution System Planning based on Tabu Search |
author |
Pereira Junior, Benvindo Rodrigues [UNESP] |
author_facet |
Pereira Junior, Benvindo Rodrigues [UNESP] Sanches Mantovani, Jose Roberto [UNESP] Cossi, Antonio Marcos [UNESP] Contreras, Javier IEEE |
author_role |
author |
author2 |
Sanches Mantovani, Jose Roberto [UNESP] Cossi, Antonio Marcos [UNESP] Contreras, Javier IEEE |
author2_role |
author author author author |
dc.contributor.none.fl_str_mv |
Universidade Estadual Paulista (Unesp) Univ Castilla La Mancha |
dc.contributor.author.fl_str_mv |
Pereira Junior, Benvindo Rodrigues [UNESP] Sanches Mantovani, Jose Roberto [UNESP] Cossi, Antonio Marcos [UNESP] Contreras, Javier IEEE |
dc.subject.por.fl_str_mv |
Distribution system planning multiobjective optimization reliability tabu search |
topic |
Distribution system planning multiobjective optimization reliability tabu search |
description |
This paper presents a multiobjective model for the multistage planning problem of a distribution system. The problem is formulated as a multiobjective mixed integer nonlinear programming model. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalizing switches and construction of tie lines. Taking into account these actions, the objective functions used in this model are the investment and operational costs as well as the system's reliability under contingencies using an n-1 criterion. Reliability is calculated by means of the non-supplied energy. To solve the proposed multiobjective model a multiobjective tabu search method is used. Numerical results are presented for a 54-bus system. |
publishDate |
2013 |
dc.date.none.fl_str_mv |
2013-01-01 2020-12-10T19:33:03Z 2020-12-10T19:33:03Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/conferenceObject |
format |
conferenceObject |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
2013 Ieee Grenoble Powertech (powertech). New York: Ieee, 6 p., 2013. http://hdl.handle.net/11449/196089 WOS:000387091900037 |
identifier_str_mv |
2013 Ieee Grenoble Powertech (powertech). New York: Ieee, 6 p., 2013. WOS:000387091900037 |
url |
http://hdl.handle.net/11449/196089 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
2013 Ieee Grenoble Powertech (powertech) |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
6 |
dc.publisher.none.fl_str_mv |
Ieee |
publisher.none.fl_str_mv |
Ieee |
dc.source.none.fl_str_mv |
Web of Science reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
|
_version_ |
1808129545915596800 |