The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model

Detalhes bibliográficos
Autor(a) principal: Toledo, Claudio F. M.
Data de Publicação: 2015
Outros Autores: Kimms, Alf, Franca, Paulo M. [UNESP], Morabito, Reinaldo
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Institucional da UNESP
Texto Completo: http://dx.doi.org/10.1155/2015/182781
http://hdl.handle.net/11449/160667
Resumo: This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setups in each level. For instance, in the first level of soft drink production, raw materials are stored in tanks flowing to production lines in the second level. The amount and the time the raw materials and products have to be stored and produced should be determined. A synchronization problem occurs because the production in lines and the storage in tanks have to be compatible with each other throughout the time horizon. The SITLSP and its mathematical model are described in detail by this paper. The lack of similar models in the literature has led us to also propose a set of instances for the SITLSP, based on data provided by a soft drink company. Thus, a set of benchmark results for these problem instances are established using an exact method available in an optimization package. Moreover, results for two relaxations proved that the modeling methodology could be useful in real-world applications.
id UNSP_7584650a4a72a5d9abc134cf8c8a8fd1
oai_identifier_str oai:repositorio.unesp.br:11449/160667
network_acronym_str UNSP
network_name_str Repositório Institucional da UNESP
repository_id_str 2946
spelling The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical ModelThis paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setups in each level. For instance, in the first level of soft drink production, raw materials are stored in tanks flowing to production lines in the second level. The amount and the time the raw materials and products have to be stored and produced should be determined. A synchronization problem occurs because the production in lines and the storage in tanks have to be compatible with each other throughout the time horizon. The SITLSP and its mathematical model are described in detail by this paper. The lack of similar models in the literature has led us to also propose a set of instances for the SITLSP, based on data provided by a soft drink company. Thus, a set of benchmark results for these problem instances are established using an exact method available in an optimization package. Moreover, results for two relaxations proved that the modeling methodology could be useful in real-world applications.Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)Univ Sao Paulo, Inst Sci Math & Comp, Dept Comp Syst, BR-13566590 Sao Carlos, SP, BrazilUniv Duisburg Essen, Mercator Sch Management, Dept Technol & Operat Management, D-47057 Duisburg, GermanyUniv Estadual Paulista, Dept Math & Comp Sci, BR-19060900 Presidente Prudente, SP, BrazilUniv Fed Sao Carlos, Dept Prod Engn, BR-13565905 Sao Carlos, SP, BrazilUniv Estadual Paulista, Dept Math & Comp Sci, BR-19060900 Presidente Prudente, SP, BrazilCNPq: 483474/2013-4CNPq: 312967/2014-4Hindawi Publishing CorporationUniversidade de São Paulo (USP)Univ Duisburg EssenUniversidade Estadual Paulista (Unesp)Universidade Federal de São Carlos (UFSCar)Toledo, Claudio F. M.Kimms, AlfFranca, Paulo M. [UNESP]Morabito, Reinaldo2018-11-26T16:16:13Z2018-11-26T16:16:13Z2015-01-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article18application/pdfhttp://dx.doi.org/10.1155/2015/182781Mathematical Problems In Engineering. New York: Hindawi Publishing Corporation, 18 p., 2015.1024-123Xhttp://hdl.handle.net/11449/16066710.1155/2015/182781WOS:000358206400001WOS000358206400001.pdfWeb of Sciencereponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengMathematical Problems In Engineeringinfo:eu-repo/semantics/openAccess2024-06-19T14:31:54Zoai:repositorio.unesp.br:11449/160667Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T17:51:09.595040Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false
dc.title.none.fl_str_mv The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
title The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
spellingShingle The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
Toledo, Claudio F. M.
title_short The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
title_full The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
title_fullStr The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
title_full_unstemmed The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
title_sort The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
author Toledo, Claudio F. M.
author_facet Toledo, Claudio F. M.
Kimms, Alf
Franca, Paulo M. [UNESP]
Morabito, Reinaldo
author_role author
author2 Kimms, Alf
Franca, Paulo M. [UNESP]
Morabito, Reinaldo
author2_role author
author
author
dc.contributor.none.fl_str_mv Universidade de São Paulo (USP)
Univ Duisburg Essen
Universidade Estadual Paulista (Unesp)
Universidade Federal de São Carlos (UFSCar)
dc.contributor.author.fl_str_mv Toledo, Claudio F. M.
Kimms, Alf
Franca, Paulo M. [UNESP]
Morabito, Reinaldo
description This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setups in each level. For instance, in the first level of soft drink production, raw materials are stored in tanks flowing to production lines in the second level. The amount and the time the raw materials and products have to be stored and produced should be determined. A synchronization problem occurs because the production in lines and the storage in tanks have to be compatible with each other throughout the time horizon. The SITLSP and its mathematical model are described in detail by this paper. The lack of similar models in the literature has led us to also propose a set of instances for the SITLSP, based on data provided by a soft drink company. Thus, a set of benchmark results for these problem instances are established using an exact method available in an optimization package. Moreover, results for two relaxations proved that the modeling methodology could be useful in real-world applications.
publishDate 2015
dc.date.none.fl_str_mv 2015-01-01
2018-11-26T16:16:13Z
2018-11-26T16:16:13Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://dx.doi.org/10.1155/2015/182781
Mathematical Problems In Engineering. New York: Hindawi Publishing Corporation, 18 p., 2015.
1024-123X
http://hdl.handle.net/11449/160667
10.1155/2015/182781
WOS:000358206400001
WOS000358206400001.pdf
url http://dx.doi.org/10.1155/2015/182781
http://hdl.handle.net/11449/160667
identifier_str_mv Mathematical Problems In Engineering. New York: Hindawi Publishing Corporation, 18 p., 2015.
1024-123X
10.1155/2015/182781
WOS:000358206400001
WOS000358206400001.pdf
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv Mathematical Problems In Engineering
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv 18
application/pdf
dc.publisher.none.fl_str_mv Hindawi Publishing Corporation
publisher.none.fl_str_mv Hindawi Publishing Corporation
dc.source.none.fl_str_mv Web of Science
reponame:Repositório Institucional da UNESP
instname:Universidade Estadual Paulista (UNESP)
instacron:UNESP
instname_str Universidade Estadual Paulista (UNESP)
instacron_str UNESP
institution UNESP
reponame_str Repositório Institucional da UNESP
collection Repositório Institucional da UNESP
repository.name.fl_str_mv Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)
repository.mail.fl_str_mv
_version_ 1808128866880847872