PMBOK® and critical chain practices: Antagonisms and opportunities for complementation
Autor(a) principal: | |
---|---|
Data de Publicação: | 2017 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UNESP |
Texto Completo: | http://dx.doi.org/10.1590/0104-530X1510-16 http://hdl.handle.net/11449/170319 |
Resumo: | The endeavor of the Project Management Institute (PMI) in gathering and codifying valuable knowledge in the field of Project Management (PM) has resulted in A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Goldratt has contributed to the body of knowledge in PM to develop the Critical Chain Project Management (CCPM) method, based on the Theory of Constraints (TOC). CCPM superficially recommended by the PMBOK® Guide introduces new concepts and methods aimed at PM, some of which conflict with the practices recommended by the guide itself. This research assumes that CCPM can bring significant benefits to the field of knowledge in PM and questions the little relevance given to it in the PMBOK® Guide. Therefore, the general proposal of the study is initially checking the degree of insertion of CCPM in the Guide, and then evaluating possible contradictions as well as opportunities for complementation between them. The analysis was based on a literature review and a field study with certified experts. Despite the fact that CCPM is recommended by the Guide as a method aimed at Time Management, the research indicated that other practices involving CCPM and not covered by the Guide can contribute not only to Time Management, but also to Human Resources and Communications. The research also found that CCPM is not self-sufficient in its practices, and the Guide should be referred to especially on Integration and Scope Management. It was further noted that CCPM conflicts with certain time-management practices recommended by the Guide that, if used concurrently, may potentially jeopardize the effectiveness of PM. |
id |
UNSP_a2921e88db260911124b48a6a1f14a69 |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/170319 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementationCritical chainGuidePMBOK®Projects managementThe endeavor of the Project Management Institute (PMI) in gathering and codifying valuable knowledge in the field of Project Management (PM) has resulted in A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Goldratt has contributed to the body of knowledge in PM to develop the Critical Chain Project Management (CCPM) method, based on the Theory of Constraints (TOC). CCPM superficially recommended by the PMBOK® Guide introduces new concepts and methods aimed at PM, some of which conflict with the practices recommended by the guide itself. This research assumes that CCPM can bring significant benefits to the field of knowledge in PM and questions the little relevance given to it in the PMBOK® Guide. Therefore, the general proposal of the study is initially checking the degree of insertion of CCPM in the Guide, and then evaluating possible contradictions as well as opportunities for complementation between them. The analysis was based on a literature review and a field study with certified experts. Despite the fact that CCPM is recommended by the Guide as a method aimed at Time Management, the research indicated that other practices involving CCPM and not covered by the Guide can contribute not only to Time Management, but also to Human Resources and Communications. The research also found that CCPM is not self-sufficient in its practices, and the Guide should be referred to especially on Integration and Scope Management. It was further noted that CCPM conflicts with certain time-management practices recommended by the Guide that, if used concurrently, may potentially jeopardize the effectiveness of PM.Universidade Estadual Paulista 'Júlio de Mesquita Filho' - UNESP, Av. Eng. Luiz Edmundo C. Coube, 14-01Universidade Estadual Paulista 'Júlio de Mesquita Filho' - UNESP, Av. Eng. Luiz Edmundo C. Coube, 14-01Universidade Estadual Paulista (Unesp)Luiz, João Victor Rojas [UNESP]De Souza, Fernando Bernardi [UNESP]Luiz, Octaviano Rojas [UNESP]2018-12-11T16:50:16Z2018-12-11T16:50:16Z2017-07-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article464-476application/pdfhttp://dx.doi.org/10.1590/0104-530X1510-16Gestao e Producao, v. 24, n. 3, p. 464-476, 2017.1806-96490104-530Xhttp://hdl.handle.net/11449/17031910.1590/0104-530X1510-16S0104-530X20170003004642-s2.0-85032457264S0104-530X2017000300464.pdf08110783301398420000-0003-4302-7636Scopusreponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengGestao e Producaoinfo:eu-repo/semantics/openAccess2023-11-03T06:07:23Zoai:repositorio.unesp.br:11449/170319Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T16:47:09.805916Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
title |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
spellingShingle |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation Luiz, João Victor Rojas [UNESP] Critical chain Guide PMBOK® Projects management |
title_short |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
title_full |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
title_fullStr |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
title_full_unstemmed |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
title_sort |
PMBOK® and critical chain practices: Antagonisms and opportunities for complementation |
author |
Luiz, João Victor Rojas [UNESP] |
author_facet |
Luiz, João Victor Rojas [UNESP] De Souza, Fernando Bernardi [UNESP] Luiz, Octaviano Rojas [UNESP] |
author_role |
author |
author2 |
De Souza, Fernando Bernardi [UNESP] Luiz, Octaviano Rojas [UNESP] |
author2_role |
author author |
dc.contributor.none.fl_str_mv |
Universidade Estadual Paulista (Unesp) |
dc.contributor.author.fl_str_mv |
Luiz, João Victor Rojas [UNESP] De Souza, Fernando Bernardi [UNESP] Luiz, Octaviano Rojas [UNESP] |
dc.subject.por.fl_str_mv |
Critical chain Guide PMBOK® Projects management |
topic |
Critical chain Guide PMBOK® Projects management |
description |
The endeavor of the Project Management Institute (PMI) in gathering and codifying valuable knowledge in the field of Project Management (PM) has resulted in A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Goldratt has contributed to the body of knowledge in PM to develop the Critical Chain Project Management (CCPM) method, based on the Theory of Constraints (TOC). CCPM superficially recommended by the PMBOK® Guide introduces new concepts and methods aimed at PM, some of which conflict with the practices recommended by the guide itself. This research assumes that CCPM can bring significant benefits to the field of knowledge in PM and questions the little relevance given to it in the PMBOK® Guide. Therefore, the general proposal of the study is initially checking the degree of insertion of CCPM in the Guide, and then evaluating possible contradictions as well as opportunities for complementation between them. The analysis was based on a literature review and a field study with certified experts. Despite the fact that CCPM is recommended by the Guide as a method aimed at Time Management, the research indicated that other practices involving CCPM and not covered by the Guide can contribute not only to Time Management, but also to Human Resources and Communications. The research also found that CCPM is not self-sufficient in its practices, and the Guide should be referred to especially on Integration and Scope Management. It was further noted that CCPM conflicts with certain time-management practices recommended by the Guide that, if used concurrently, may potentially jeopardize the effectiveness of PM. |
publishDate |
2017 |
dc.date.none.fl_str_mv |
2017-07-01 2018-12-11T16:50:16Z 2018-12-11T16:50:16Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://dx.doi.org/10.1590/0104-530X1510-16 Gestao e Producao, v. 24, n. 3, p. 464-476, 2017. 1806-9649 0104-530X http://hdl.handle.net/11449/170319 10.1590/0104-530X1510-16 S0104-530X2017000300464 2-s2.0-85032457264 S0104-530X2017000300464.pdf 0811078330139842 0000-0003-4302-7636 |
url |
http://dx.doi.org/10.1590/0104-530X1510-16 http://hdl.handle.net/11449/170319 |
identifier_str_mv |
Gestao e Producao, v. 24, n. 3, p. 464-476, 2017. 1806-9649 0104-530X 10.1590/0104-530X1510-16 S0104-530X2017000300464 2-s2.0-85032457264 S0104-530X2017000300464.pdf 0811078330139842 0000-0003-4302-7636 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
Gestao e Producao |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
464-476 application/pdf |
dc.source.none.fl_str_mv |
Scopus reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
|
_version_ |
1808128700674211840 |