Resumo: | Nowadays, several test systems available in the specialized literature are used to verify studies regarding power system planning or network reliability. However, there are no test systems currently available with enough information in order to endorse studies that simultaneously approach expansion planning, operation, and reliability issues. This paper introduces a real test system, including the load modeling, and generation and transmission systems. The main objective is to provide all the details and information required to evaluate methods and models developed for power system planning, operation, and reliability. The presented load modeling includes hourly, daily, weekly, monthly, and seasonal patterns. Furthermore, besides the substation data, reliability details, construction costs, and characteristics of right of ways (e.g., line length, impedance, and ratings) for the transmission system are exposed. The real transmission system presented contains 39 buses, 135 transformers, and 66 lines at two voltage levels: 230 and 400 kV. Finally, the generation system reliability data as well as operation and installation costs for each unit are also provided. |
id |
UNSP_bedc8aa8cb525bb8df51bc59fd5ca843 |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/163915 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
A Real Test System For Power System Planning, Operation, and ReliabilityNetwork reliabilityPower system operationPower system planningReal test systemNowadays, several test systems available in the specialized literature are used to verify studies regarding power system planning or network reliability. However, there are no test systems currently available with enough information in order to endorse studies that simultaneously approach expansion planning, operation, and reliability issues. This paper introduces a real test system, including the load modeling, and generation and transmission systems. The main objective is to provide all the details and information required to evaluate methods and models developed for power system planning, operation, and reliability. The presented load modeling includes hourly, daily, weekly, monthly, and seasonal patterns. Furthermore, besides the substation data, reliability details, construction costs, and characteristics of right of ways (e.g., line length, impedance, and ratings) for the transmission system are exposed. The real transmission system presented contains 39 buses, 135 transformers, and 66 lines at two voltage levels: 230 and 400 kV. Finally, the generation system reliability data as well as operation and installation costs for each unit are also provided.Sao Paulo State Univ, Fac Engn Ilha Solteira Campus, Dept Elect Engn, Ilha Solteira, SP, BrazilShahid Beheshti Univ, Dept Elect Engn, Tehran, IranUniv Tehran, Sch Elect & Comp Engn, Coll Engn, Tehran, IranSao Paulo State Univ, Fac Engn Ilha Solteira Campus, Dept Elect Engn, Ilha Solteira, SP, BrazilSpringerUniversidade Estadual Paulista (Unesp)Shahid Beheshti UnivUniv TehranMahdavi, Meisam [UNESP]Sabillon, Carlos [UNESP]Ajalli, MajidMonsef, HassanRomero, Ruben [UNESP]2018-11-26T17:48:24Z2018-11-26T17:48:24Z2018-04-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article192-208application/pdfhttp://dx.doi.org/10.1007/s40313-017-0361-8Journal Of Control Automation And Electrical Systems. New York: Springer, v. 29, n. 2, p. 192-208, 2018.2195-3880http://hdl.handle.net/11449/16391510.1007/s40313-017-0361-8WOS:000426289500006WOS000426289500006.pdfWeb of Sciencereponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengJournal Of Control Automation And Electrical Systems0,274info:eu-repo/semantics/openAccess2024-07-04T19:06:26Zoai:repositorio.unesp.br:11449/163915Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T19:39:31.785283Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
A Real Test System For Power System Planning, Operation, and Reliability |
title |
A Real Test System For Power System Planning, Operation, and Reliability |
spellingShingle |
A Real Test System For Power System Planning, Operation, and Reliability Mahdavi, Meisam [UNESP] Network reliability Power system operation Power system planning Real test system |
title_short |
A Real Test System For Power System Planning, Operation, and Reliability |
title_full |
A Real Test System For Power System Planning, Operation, and Reliability |
title_fullStr |
A Real Test System For Power System Planning, Operation, and Reliability |
title_full_unstemmed |
A Real Test System For Power System Planning, Operation, and Reliability |
title_sort |
A Real Test System For Power System Planning, Operation, and Reliability |
author |
Mahdavi, Meisam [UNESP] |
author_facet |
Mahdavi, Meisam [UNESP] Sabillon, Carlos [UNESP] Ajalli, Majid Monsef, Hassan Romero, Ruben [UNESP] |
author_role |
author |
author2 |
Sabillon, Carlos [UNESP] Ajalli, Majid Monsef, Hassan Romero, Ruben [UNESP] |
author2_role |
author author author author |
dc.contributor.none.fl_str_mv |
Universidade Estadual Paulista (Unesp) Shahid Beheshti Univ Univ Tehran |
dc.contributor.author.fl_str_mv |
Mahdavi, Meisam [UNESP] Sabillon, Carlos [UNESP] Ajalli, Majid Monsef, Hassan Romero, Ruben [UNESP] |
dc.subject.por.fl_str_mv |
Network reliability Power system operation Power system planning Real test system |
topic |
Network reliability Power system operation Power system planning Real test system |
description |
Nowadays, several test systems available in the specialized literature are used to verify studies regarding power system planning or network reliability. However, there are no test systems currently available with enough information in order to endorse studies that simultaneously approach expansion planning, operation, and reliability issues. This paper introduces a real test system, including the load modeling, and generation and transmission systems. The main objective is to provide all the details and information required to evaluate methods and models developed for power system planning, operation, and reliability. The presented load modeling includes hourly, daily, weekly, monthly, and seasonal patterns. Furthermore, besides the substation data, reliability details, construction costs, and characteristics of right of ways (e.g., line length, impedance, and ratings) for the transmission system are exposed. The real transmission system presented contains 39 buses, 135 transformers, and 66 lines at two voltage levels: 230 and 400 kV. Finally, the generation system reliability data as well as operation and installation costs for each unit are also provided. |
publishDate |
2018 |
dc.date.none.fl_str_mv |
2018-11-26T17:48:24Z 2018-11-26T17:48:24Z 2018-04-01 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://dx.doi.org/10.1007/s40313-017-0361-8 Journal Of Control Automation And Electrical Systems. New York: Springer, v. 29, n. 2, p. 192-208, 2018. 2195-3880 http://hdl.handle.net/11449/163915 10.1007/s40313-017-0361-8 WOS:000426289500006 WOS000426289500006.pdf |
url |
http://dx.doi.org/10.1007/s40313-017-0361-8 http://hdl.handle.net/11449/163915 |
identifier_str_mv |
Journal Of Control Automation And Electrical Systems. New York: Springer, v. 29, n. 2, p. 192-208, 2018. 2195-3880 10.1007/s40313-017-0361-8 WOS:000426289500006 WOS000426289500006.pdf |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
Journal Of Control Automation And Electrical Systems 0,274 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
192-208 application/pdf |
dc.publisher.none.fl_str_mv |
Springer |
publisher.none.fl_str_mv |
Springer |
dc.source.none.fl_str_mv |
Web of Science reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
|
_version_ |
1808129102033453056 |