Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems
Autor(a) principal: | |
---|---|
Data de Publicação: | 2018 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UNESP |
Texto Completo: | http://dx.doi.org/10.1109/TSG.2017.2703152 http://hdl.handle.net/11449/185185 |
Resumo: | This paper presents a mixed-integer non-linear programming (MINLP) model for the optimal restoration/maintenance switching sequence of unbalanced three-phase electrical distribution systems. Once the protection coordination has identified and cleared a faulty zone, the proposed MINLP model determines the status of remotely controlled switches and the dispatchable distributed generation (DG) units, used to deenergized the troubled section of the network and supply as much load as possible. The restoration considers the switching sequence over a discrete horizon, guaranteeing that the operational constraints of the distribution system are not violated Functions in every step of the sequence. Furthermore, a set of linearization strategies are presented to transform the proposed MINLP, model into a mixed-integer linear programming (MILP) model. The use of MILP models guarantees convergence to optimality by applying convex optimization techniques. Tests are performed on an unbalanced three-phase radial distribution system consisting of 123 nodes, 12 switches, and three dispatchable DG units. The obtained results show that the proposed optimization model is a holistic procedure that can be used to efficiently manage power restoration or to minimize isolated areas in case of scheduled maintenance in modern electrical distribution systems. |
id |
UNSP_c60d17733b1b31a64dad92f74d05e018 |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/185185 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution SystemsMixed integer linear programmingrestoration/maintenance switching sequenceunbalanced three-phase electrical distribution systemsThis paper presents a mixed-integer non-linear programming (MINLP) model for the optimal restoration/maintenance switching sequence of unbalanced three-phase electrical distribution systems. Once the protection coordination has identified and cleared a faulty zone, the proposed MINLP model determines the status of remotely controlled switches and the dispatchable distributed generation (DG) units, used to deenergized the troubled section of the network and supply as much load as possible. The restoration considers the switching sequence over a discrete horizon, guaranteeing that the operational constraints of the distribution system are not violated Functions in every step of the sequence. Furthermore, a set of linearization strategies are presented to transform the proposed MINLP, model into a mixed-integer linear programming (MILP) model. The use of MILP models guarantees convergence to optimality by applying convex optimization techniques. Tests are performed on an unbalanced three-phase radial distribution system consisting of 123 nodes, 12 switches, and three dispatchable DG units. The obtained results show that the proposed optimization model is a holistic procedure that can be used to efficiently manage power restoration or to minimize isolated areas in case of scheduled maintenance in modern electrical distribution systems.Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)Univ Estadual Campinas, Dept Syst & Energy, BR-13083852 Campinas, SP, BrazilSao Paulo State Univ, BR-19274000 Rosana, BrazilSao Paulo State Univ, Dept Elect Engn, BR-15385 Ilha Solteira, BrazilSao Paulo State Univ, BR-19274000 Rosana, BrazilSao Paulo State Univ, Dept Elect Engn, BR-15385 Ilha Solteira, BrazilCNPq: 152002/2016-2FAPESP: 2015/12564-1Ieee-inst Electrical Electronics Engineers IncUniversidade Estadual de Campinas (UNICAMP)Universidade Estadual Paulista (Unesp)Lopez, Juan CamiloFranco, John F. [UNESP]Rider, Marcos J.Romero, Ruben [UNESP]2019-10-04T12:33:25Z2019-10-04T12:33:25Z2018-11-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article6058-6068http://dx.doi.org/10.1109/TSG.2017.2703152Ieee Transactions On Smart Grid. Piscataway: Ieee-inst Electrical Electronics Engineers Inc, v. 9, n. 6, p. 6058-6068, 2018.1949-3053http://hdl.handle.net/11449/18518510.1109/TSG.2017.2703152WOS:000452475200054Web of Sciencereponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengIeee Transactions On Smart Gridinfo:eu-repo/semantics/openAccess2024-08-06T18:56:02Zoai:repositorio.unesp.br:11449/185185Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-06T18:56:02Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
title |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
spellingShingle |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems Lopez, Juan Camilo Mixed integer linear programming restoration/maintenance switching sequence unbalanced three-phase electrical distribution systems |
title_short |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
title_full |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
title_fullStr |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
title_full_unstemmed |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
title_sort |
Optimal Restoration/Maintenance Switching Sequence of Unbalanced Three-Phase Distribution Systems |
author |
Lopez, Juan Camilo |
author_facet |
Lopez, Juan Camilo Franco, John F. [UNESP] Rider, Marcos J. Romero, Ruben [UNESP] |
author_role |
author |
author2 |
Franco, John F. [UNESP] Rider, Marcos J. Romero, Ruben [UNESP] |
author2_role |
author author author |
dc.contributor.none.fl_str_mv |
Universidade Estadual de Campinas (UNICAMP) Universidade Estadual Paulista (Unesp) |
dc.contributor.author.fl_str_mv |
Lopez, Juan Camilo Franco, John F. [UNESP] Rider, Marcos J. Romero, Ruben [UNESP] |
dc.subject.por.fl_str_mv |
Mixed integer linear programming restoration/maintenance switching sequence unbalanced three-phase electrical distribution systems |
topic |
Mixed integer linear programming restoration/maintenance switching sequence unbalanced three-phase electrical distribution systems |
description |
This paper presents a mixed-integer non-linear programming (MINLP) model for the optimal restoration/maintenance switching sequence of unbalanced three-phase electrical distribution systems. Once the protection coordination has identified and cleared a faulty zone, the proposed MINLP model determines the status of remotely controlled switches and the dispatchable distributed generation (DG) units, used to deenergized the troubled section of the network and supply as much load as possible. The restoration considers the switching sequence over a discrete horizon, guaranteeing that the operational constraints of the distribution system are not violated Functions in every step of the sequence. Furthermore, a set of linearization strategies are presented to transform the proposed MINLP, model into a mixed-integer linear programming (MILP) model. The use of MILP models guarantees convergence to optimality by applying convex optimization techniques. Tests are performed on an unbalanced three-phase radial distribution system consisting of 123 nodes, 12 switches, and three dispatchable DG units. The obtained results show that the proposed optimization model is a holistic procedure that can be used to efficiently manage power restoration or to minimize isolated areas in case of scheduled maintenance in modern electrical distribution systems. |
publishDate |
2018 |
dc.date.none.fl_str_mv |
2018-11-01 2019-10-04T12:33:25Z 2019-10-04T12:33:25Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://dx.doi.org/10.1109/TSG.2017.2703152 Ieee Transactions On Smart Grid. Piscataway: Ieee-inst Electrical Electronics Engineers Inc, v. 9, n. 6, p. 6058-6068, 2018. 1949-3053 http://hdl.handle.net/11449/185185 10.1109/TSG.2017.2703152 WOS:000452475200054 |
url |
http://dx.doi.org/10.1109/TSG.2017.2703152 http://hdl.handle.net/11449/185185 |
identifier_str_mv |
Ieee Transactions On Smart Grid. Piscataway: Ieee-inst Electrical Electronics Engineers Inc, v. 9, n. 6, p. 6058-6068, 2018. 1949-3053 10.1109/TSG.2017.2703152 WOS:000452475200054 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
Ieee Transactions On Smart Grid |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
6058-6068 |
dc.publisher.none.fl_str_mv |
Ieee-inst Electrical Electronics Engineers Inc |
publisher.none.fl_str_mv |
Ieee-inst Electrical Electronics Engineers Inc |
dc.source.none.fl_str_mv |
Web of Science reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
|
_version_ |
1808128139520376832 |