Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário

Detalhes bibliográficos
Autor(a) principal: Almeida, Aurélia de Oliveira
Data de Publicação: 2010
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Biblioteca Digital de Teses e Dissertações da USP
Texto Completo: http://www.teses.usp.br/teses/disponiveis/18/18138/tde-13072010-141158/
Resumo: Este trabalho se propôs a avaliar o desempenho de um reator com leito de biomassa aderida de fluxo ascensional em escala plena (159 \'M POT.3\') e com aeração contínua a 7 m acima da base do reator para o tratamento do esgoto sanitário. O leito do reator era formado por carvão ativado granular, carvão antracitoso e areia. O trabalho foi dividido em duas etapas. Na primeira etapa foram feitos ensaios hidrodinâmicos que consistiram da curva de expansão/fluidificação para as biopartículas do leito do reator em escala plena e do ensaio de estímulo-resposta com o traçador \'NA\'CL\'. Na segunda etapa monitorou-se o comportamento do reator com leito de biomassa aderida operado com setor 1 (sem aeração) e setor 2 (com aeração) sobrepostos e foi utilizada a recirculação para expandir o leito. As curvas de expansão/fluidificação das biopartículas constituintes do leito do reator mostraram que o leito do reator no setor 1 encontrava-se sem expansão e no setor 2 estava expandido, sob as condições de operação determinadas para esse trabalho. Do ensaio com o traçador \'NA\'CL\', obtiverem-se tempo de detenção hidráulica médio (TDHM) de 18,45 h para o ensaio sem recirculação e com compressor desligado; e de 16,90 h para o ensaio com recirculação e compressor ligado. Os TDHM obtidos foram maiores que o TDH teórico (igual a 12 h), provavelmente devido à difusão do traçador no biofilme. A Etapa II foi dividida em duas fases, na fase 1 o TDH teórico médio foi de 12 h e na fase 2 foi de 16 h. Verificou-se baixa retenção de sólidos no sistema, visto que o efluente apresentou, durante a maior parte do período de monitoramento, concentrações de sólidos totais e sólidos suspensos totais superiores as do afluente. A maior eficiência de remoção de DQO de amostra bruta aconteceu na fase 2 e foi de 32% sob taxa de carregamento de 0,86kgDQObruta/\'M POT.3\'.d. Os valores médios de DQO de ) amostras filtradas do efluente foram iguais 119 e 116 mg \'O IND.2\'/L, o que equivale a remoções médias de 54% e 63%, respectivamente para a fase 1 e 2. A maior remoção DBO de amostra filtrada no sistema aconteceu na fase 1 e foi de 91%, com o efluente apresentando concentração de 19 mg \'O IND.2\'/L. Com relação à concentração de NTK, o sistema foi pouco eficiente em sua remoção e apresentou concentrações muito baixa de nitrogênio oxidado (menores que 1 mg \'NO IND.3\'POT.-1\'/L). O grau de amonificação foi de 89%, em média, quando considerou a concentração de NTK em amostra filtrada. Concluiu-se que o sistema não é eficiente na remoção de material orgânico e de nutrientes devido ao arraste de sólidos e material biológico no efluente.
id USP_e0b2b87de9c8d96db263a4d72c72a0d0
oai_identifier_str oai:teses.usp.br:tde-13072010-141158
network_acronym_str USP
network_name_str Biblioteca Digital de Teses e Dissertações da USP
repository_id_str 2721
spelling Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitárioPartially aerated attached biomass bed reactor applied to treatment sanitary sewage treatmentArraste de sólidosAttached biomass bed reactorDrag of solidsEsgotos sanitáriosReator com leito de biomassa aderidaRemoção de matéria orgânicaRemoção de nutrientesRemoval nutrientsRemoval organic matterSanitary sewageEste trabalho se propôs a avaliar o desempenho de um reator com leito de biomassa aderida de fluxo ascensional em escala plena (159 \'M POT.3\') e com aeração contínua a 7 m acima da base do reator para o tratamento do esgoto sanitário. O leito do reator era formado por carvão ativado granular, carvão antracitoso e areia. O trabalho foi dividido em duas etapas. Na primeira etapa foram feitos ensaios hidrodinâmicos que consistiram da curva de expansão/fluidificação para as biopartículas do leito do reator em escala plena e do ensaio de estímulo-resposta com o traçador \'NA\'CL\'. Na segunda etapa monitorou-se o comportamento do reator com leito de biomassa aderida operado com setor 1 (sem aeração) e setor 2 (com aeração) sobrepostos e foi utilizada a recirculação para expandir o leito. As curvas de expansão/fluidificação das biopartículas constituintes do leito do reator mostraram que o leito do reator no setor 1 encontrava-se sem expansão e no setor 2 estava expandido, sob as condições de operação determinadas para esse trabalho. Do ensaio com o traçador \'NA\'CL\', obtiverem-se tempo de detenção hidráulica médio (TDHM) de 18,45 h para o ensaio sem recirculação e com compressor desligado; e de 16,90 h para o ensaio com recirculação e compressor ligado. Os TDHM obtidos foram maiores que o TDH teórico (igual a 12 h), provavelmente devido à difusão do traçador no biofilme. A Etapa II foi dividida em duas fases, na fase 1 o TDH teórico médio foi de 12 h e na fase 2 foi de 16 h. Verificou-se baixa retenção de sólidos no sistema, visto que o efluente apresentou, durante a maior parte do período de monitoramento, concentrações de sólidos totais e sólidos suspensos totais superiores as do afluente. A maior eficiência de remoção de DQO de amostra bruta aconteceu na fase 2 e foi de 32% sob taxa de carregamento de 0,86kgDQObruta/\'M POT.3\'.d. Os valores médios de DQO de ) amostras filtradas do efluente foram iguais 119 e 116 mg \'O IND.2\'/L, o que equivale a remoções médias de 54% e 63%, respectivamente para a fase 1 e 2. A maior remoção DBO de amostra filtrada no sistema aconteceu na fase 1 e foi de 91%, com o efluente apresentando concentração de 19 mg \'O IND.2\'/L. Com relação à concentração de NTK, o sistema foi pouco eficiente em sua remoção e apresentou concentrações muito baixa de nitrogênio oxidado (menores que 1 mg \'NO IND.3\'POT.-1\'/L). O grau de amonificação foi de 89%, em média, quando considerou a concentração de NTK em amostra filtrada. Concluiu-se que o sistema não é eficiente na remoção de material orgânico e de nutrientes devido ao arraste de sólidos e material biológico no efluente.This work aimed to evaluate the performance of a full scale up-flow attached biomass bed reactor (159 \'M POT.3\') and with continuous aeration at 7 m above bottom of the reactor to sanitary sewage treatment. The bed of the reactor was constituted for activated granular carbon, anthracite carbon and sand. The work was divided into two stages. In the first stage, hydrodynamics tests were made which consisted of the expansion/fluidization curve for the bioparticles of the bed of the full scale reactor and of the test of stimulus-response with tracer \'NA\'CL\'. In the second stage, it monitored the performance of the attached biomass bed reactor operated with overlapping sector 1 (without aeration) and sector 2 (with aeration) and it utilized the recirculation to expand the bed. The expansion/fluidization curves of the bioparticles of the bed of the reactor showed that the bed of the reactor in the sector 1 was without expansion and in the sector 2 was expanded, under the operating conditions determined for this work. Of the test with \'NA\'CL\' tracer obtained mean hydraulic detention time (HDTM) of 18,45 h for the test without recirculation and compressor off; and of 16,90 h for the test with recirculation and compressor on. The obtained HDTM were bigger than the theoretical HDT (equal at 12 h), probably due to at the diffusion of trace into biofilm. The stage II was divided into two phases, in the phase 1 mean theoretical HDT was of 12 h, and in the phase 2 was of 16 h. It verified low retention of solids in the system, since the effluent presented, during most of the monitoring period, concentrations of total solids and total suspended solids higher than the influent. The greater efficiency of COD removal of raw sample occurred in phase 2 and was of 32% under loading rate of 0,86kgCODraw/\'M POT.3\'.d. The mean amounts COD of filtered samples in the effluent were equal to 119 and 116mg\'O IND.2\'/L, which is equivalent ) to mean removals of 54% and 63%, respectively for phase 1 and 2. The higher efficiency of removal BOD filtered sample in the system was in phase 1 and was of 91%, with effluent presenting concentration of 19mg \'O IND.2\'/L. With respect to the TKN concentration, the system was little efficient in its removal and presented very low concentration of oxidized nitrogen (lower than 1mg \'NO IND.3\'POT.-1\'). The degree of ammonification was 89%, on average, when considered the TKN concentration in the filtered sample. It concluded that the system is not effective removing organic material and nutrients due to drag of solids and biological material in the effluent.Biblioteca Digitais de Teses e Dissertações da USPCampos, José RobertoAlmeida, Aurélia de Oliveira2010-04-23info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttp://www.teses.usp.br/teses/disponiveis/18/18138/tde-13072010-141158/reponame:Biblioteca Digital de Teses e Dissertações da USPinstname:Universidade de São Paulo (USP)instacron:USPLiberar o conteúdo para acesso público.info:eu-repo/semantics/openAccesspor2016-07-28T16:10:08Zoai:teses.usp.br:tde-13072010-141158Biblioteca Digital de Teses e Dissertaçõeshttp://www.teses.usp.br/PUBhttp://www.teses.usp.br/cgi-bin/mtd2br.plvirginia@if.usp.br|| atendimento@aguia.usp.br||virginia@if.usp.bropendoar:27212016-07-28T16:10:08Biblioteca Digital de Teses e Dissertações da USP - Universidade de São Paulo (USP)false
dc.title.none.fl_str_mv Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
Partially aerated attached biomass bed reactor applied to treatment sanitary sewage treatment
title Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
spellingShingle Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
Almeida, Aurélia de Oliveira
Arraste de sólidos
Attached biomass bed reactor
Drag of solids
Esgotos sanitários
Reator com leito de biomassa aderida
Remoção de matéria orgânica
Remoção de nutrientes
Removal nutrients
Removal organic matter
Sanitary sewage
title_short Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
title_full Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
title_fullStr Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
title_full_unstemmed Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
title_sort Reator com leito de biomassa aderida aerado parcialmente aplicado ao tratamento de esgoto sanitário
author Almeida, Aurélia de Oliveira
author_facet Almeida, Aurélia de Oliveira
author_role author
dc.contributor.none.fl_str_mv Campos, José Roberto
dc.contributor.author.fl_str_mv Almeida, Aurélia de Oliveira
dc.subject.por.fl_str_mv Arraste de sólidos
Attached biomass bed reactor
Drag of solids
Esgotos sanitários
Reator com leito de biomassa aderida
Remoção de matéria orgânica
Remoção de nutrientes
Removal nutrients
Removal organic matter
Sanitary sewage
topic Arraste de sólidos
Attached biomass bed reactor
Drag of solids
Esgotos sanitários
Reator com leito de biomassa aderida
Remoção de matéria orgânica
Remoção de nutrientes
Removal nutrients
Removal organic matter
Sanitary sewage
description Este trabalho se propôs a avaliar o desempenho de um reator com leito de biomassa aderida de fluxo ascensional em escala plena (159 \'M POT.3\') e com aeração contínua a 7 m acima da base do reator para o tratamento do esgoto sanitário. O leito do reator era formado por carvão ativado granular, carvão antracitoso e areia. O trabalho foi dividido em duas etapas. Na primeira etapa foram feitos ensaios hidrodinâmicos que consistiram da curva de expansão/fluidificação para as biopartículas do leito do reator em escala plena e do ensaio de estímulo-resposta com o traçador \'NA\'CL\'. Na segunda etapa monitorou-se o comportamento do reator com leito de biomassa aderida operado com setor 1 (sem aeração) e setor 2 (com aeração) sobrepostos e foi utilizada a recirculação para expandir o leito. As curvas de expansão/fluidificação das biopartículas constituintes do leito do reator mostraram que o leito do reator no setor 1 encontrava-se sem expansão e no setor 2 estava expandido, sob as condições de operação determinadas para esse trabalho. Do ensaio com o traçador \'NA\'CL\', obtiverem-se tempo de detenção hidráulica médio (TDHM) de 18,45 h para o ensaio sem recirculação e com compressor desligado; e de 16,90 h para o ensaio com recirculação e compressor ligado. Os TDHM obtidos foram maiores que o TDH teórico (igual a 12 h), provavelmente devido à difusão do traçador no biofilme. A Etapa II foi dividida em duas fases, na fase 1 o TDH teórico médio foi de 12 h e na fase 2 foi de 16 h. Verificou-se baixa retenção de sólidos no sistema, visto que o efluente apresentou, durante a maior parte do período de monitoramento, concentrações de sólidos totais e sólidos suspensos totais superiores as do afluente. A maior eficiência de remoção de DQO de amostra bruta aconteceu na fase 2 e foi de 32% sob taxa de carregamento de 0,86kgDQObruta/\'M POT.3\'.d. Os valores médios de DQO de ) amostras filtradas do efluente foram iguais 119 e 116 mg \'O IND.2\'/L, o que equivale a remoções médias de 54% e 63%, respectivamente para a fase 1 e 2. A maior remoção DBO de amostra filtrada no sistema aconteceu na fase 1 e foi de 91%, com o efluente apresentando concentração de 19 mg \'O IND.2\'/L. Com relação à concentração de NTK, o sistema foi pouco eficiente em sua remoção e apresentou concentrações muito baixa de nitrogênio oxidado (menores que 1 mg \'NO IND.3\'POT.-1\'/L). O grau de amonificação foi de 89%, em média, quando considerou a concentração de NTK em amostra filtrada. Concluiu-se que o sistema não é eficiente na remoção de material orgânico e de nutrientes devido ao arraste de sólidos e material biológico no efluente.
publishDate 2010
dc.date.none.fl_str_mv 2010-04-23
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://www.teses.usp.br/teses/disponiveis/18/18138/tde-13072010-141158/
url http://www.teses.usp.br/teses/disponiveis/18/18138/tde-13072010-141158/
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv
dc.rights.driver.fl_str_mv Liberar o conteúdo para acesso público.
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Liberar o conteúdo para acesso público.
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.coverage.none.fl_str_mv
dc.publisher.none.fl_str_mv Biblioteca Digitais de Teses e Dissertações da USP
publisher.none.fl_str_mv Biblioteca Digitais de Teses e Dissertações da USP
dc.source.none.fl_str_mv
reponame:Biblioteca Digital de Teses e Dissertações da USP
instname:Universidade de São Paulo (USP)
instacron:USP
instname_str Universidade de São Paulo (USP)
instacron_str USP
institution USP
reponame_str Biblioteca Digital de Teses e Dissertações da USP
collection Biblioteca Digital de Teses e Dissertações da USP
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações da USP - Universidade de São Paulo (USP)