Scheduling on unrelated parallel machines with sequence dependent setup times

Detalhes bibliográficos
Autor(a) principal: Etcheverry, Guilherme
Data de Publicação: 2014
Outros Autores: Anzanello, Michel J.
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista Produção Online
Texto Completo: https://www.producaoonline.org.br/rpo/article/view/1498
Resumo: This article proposes a scheduling heuristic for unrelated parallel machines with sequence dependent setup times. The minimization of total weighted completion time and the minimization of weighted tardiness are the objective functions of interest. A three phase heuristic, based on Bank and Werner’s (2001) NP-hard problems solving procedure, is proposed to (i) perform an initial ordering of the jobs, (ii) allocate the jobs to the machines, and (iii) improve final solution of both objectives with Tabu Search. The heuristic performance is evaluated comparing the quality of proposed solution with the optimal solution obtained from total enumeration. The proposed model is applied in an industry of electronic components industry composed of two unrelated parallel machines with deterministic processing and setup times. We obtained a 1.1% deviation for the optimal total weighted completion time and 4.6% of deviation for the weighted tardiness in less than ten minutes of computational time.
id ABEPRO-2_2871ec5e52bddfb86265a075a5b04b93
oai_identifier_str oai:ojs.emnuvens.com.br:article/1498
network_acronym_str ABEPRO-2
network_name_str Revista Produção Online
repository_id_str
spelling Scheduling on unrelated parallel machines with sequence dependent setup timesSequenciamento de máquinas paralelas não-relacionadas com tempos de setup dependentes das tarefasJob scheduling. Unrelated parallel machines. Tabu search.Sequenciamento. Máquinas paralelas não relacionadas. Tabu search.This article proposes a scheduling heuristic for unrelated parallel machines with sequence dependent setup times. The minimization of total weighted completion time and the minimization of weighted tardiness are the objective functions of interest. A three phase heuristic, based on Bank and Werner’s (2001) NP-hard problems solving procedure, is proposed to (i) perform an initial ordering of the jobs, (ii) allocate the jobs to the machines, and (iii) improve final solution of both objectives with Tabu Search. The heuristic performance is evaluated comparing the quality of proposed solution with the optimal solution obtained from total enumeration. The proposed model is applied in an industry of electronic components industry composed of two unrelated parallel machines with deterministic processing and setup times. We obtained a 1.1% deviation for the optimal total weighted completion time and 4.6% of deviation for the weighted tardiness in less than ten minutes of computational time.Este artigo propõe uma heurística para sequenciamento de tarefas em um ambiente de manufatura composto por máquinas paralelas não-relacionadas com tempos de setup dependentes da sequência de processamento das tarefas. As funções-objetivo consideradas são a minimização da soma do tempo ponderado de processamento e a minimização do atraso ponderado das tarefas. O método proposto acrescenta uma etapa ao procedimento de duas etapas de Bank e Werner (2001), para solução de problemas NP-hard, e é executado em três etapas: (i) ordenação inicial das tarefas, (ii) alocação das tarefas às máquinas, e (iii) aprimoramento da solução final através da ferramenta de otimização Tabu Search. O desempenho da heurística é comparado à solução ótima obtida por enumeração total. Ao ser aplicada em um ambiente de manufatura de componentes eletrônicos composto por duas máquinas paralelas não-relacionadas com tempos de processamento e de setup, a heurística proposta resulta em um desvio de 1,1% em relação ao valor ótimo da soma do tempo ponderado de processamento e 4,6% do mínimo atraso ponderado das tarefas em tempo computacional inferior a dez minutos. Associação Brasileira de Engenharia de Produção2014-08-18info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfvideo/mp4https://www.producaoonline.org.br/rpo/article/view/149810.14488/1676-1901.v14i3.1498Revista Produção Online; Vol. 14 No. 3 (2014); 890-913Revista Produção Online; v. 14 n. 3 (2014); 890-9131676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/1498/1181https://www.producaoonline.org.br/rpo/article/view/1498/1182Copyright (c) 2014 Revista Produção Onlineinfo:eu-repo/semantics/openAccessEtcheverry, GuilhermeAnzanello, Michel J.2015-11-11T17:25:34Zoai:ojs.emnuvens.com.br:article/1498Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2015-11-11T17:25:34Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false
dc.title.none.fl_str_mv Scheduling on unrelated parallel machines with sequence dependent setup times
Sequenciamento de máquinas paralelas não-relacionadas com tempos de setup dependentes das tarefas
title Scheduling on unrelated parallel machines with sequence dependent setup times
spellingShingle Scheduling on unrelated parallel machines with sequence dependent setup times
Etcheverry, Guilherme
Job scheduling. Unrelated parallel machines. Tabu search.
Sequenciamento. Máquinas paralelas não relacionadas. Tabu search.
title_short Scheduling on unrelated parallel machines with sequence dependent setup times
title_full Scheduling on unrelated parallel machines with sequence dependent setup times
title_fullStr Scheduling on unrelated parallel machines with sequence dependent setup times
title_full_unstemmed Scheduling on unrelated parallel machines with sequence dependent setup times
title_sort Scheduling on unrelated parallel machines with sequence dependent setup times
author Etcheverry, Guilherme
author_facet Etcheverry, Guilherme
Anzanello, Michel J.
author_role author
author2 Anzanello, Michel J.
author2_role author
dc.contributor.author.fl_str_mv Etcheverry, Guilherme
Anzanello, Michel J.
dc.subject.por.fl_str_mv Job scheduling. Unrelated parallel machines. Tabu search.
Sequenciamento. Máquinas paralelas não relacionadas. Tabu search.
topic Job scheduling. Unrelated parallel machines. Tabu search.
Sequenciamento. Máquinas paralelas não relacionadas. Tabu search.
description This article proposes a scheduling heuristic for unrelated parallel machines with sequence dependent setup times. The minimization of total weighted completion time and the minimization of weighted tardiness are the objective functions of interest. A three phase heuristic, based on Bank and Werner’s (2001) NP-hard problems solving procedure, is proposed to (i) perform an initial ordering of the jobs, (ii) allocate the jobs to the machines, and (iii) improve final solution of both objectives with Tabu Search. The heuristic performance is evaluated comparing the quality of proposed solution with the optimal solution obtained from total enumeration. The proposed model is applied in an industry of electronic components industry composed of two unrelated parallel machines with deterministic processing and setup times. We obtained a 1.1% deviation for the optimal total weighted completion time and 4.6% of deviation for the weighted tardiness in less than ten minutes of computational time.
publishDate 2014
dc.date.none.fl_str_mv 2014-08-18
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/1498
10.14488/1676-1901.v14i3.1498
url https://www.producaoonline.org.br/rpo/article/view/1498
identifier_str_mv 10.14488/1676-1901.v14i3.1498
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/1498/1181
https://www.producaoonline.org.br/rpo/article/view/1498/1182
dc.rights.driver.fl_str_mv Copyright (c) 2014 Revista Produção Online
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2014 Revista Produção Online
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
video/mp4
dc.publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
dc.source.none.fl_str_mv Revista Produção Online; Vol. 14 No. 3 (2014); 890-913
Revista Produção Online; v. 14 n. 3 (2014); 890-913
1676-1901
reponame:Revista Produção Online
instname:Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron:ABEPRO
instname_str Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron_str ABEPRO
institution ABEPRO
reponame_str Revista Produção Online
collection Revista Produção Online
repository.name.fl_str_mv Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)
repository.mail.fl_str_mv ||producaoonline@gmail.com
_version_ 1761536949265367041