A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times

Detalhes bibliográficos
Autor(a) principal: Mundim, Leandro Resende
Data de Publicação: 2017
Outros Autores: Fuchigami, Helio Yochihiro
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista Produção Online
Texto Completo: https://www.producaoonline.org.br/rpo/article/view/2375
Resumo: This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times.
id ABEPRO-2_64d2b811ae4eb18e3067d7a85a01f0ca
oai_identifier_str oai:ojs.emnuvens.com.br:article/2375
network_acronym_str ABEPRO-2
network_name_str Revista Produção Online
repository_id_str
spelling A robust heuristic for parallel machines scheduling problem with sequence-dependent setup timesUma heurística robusta para programação de máquinas paralelas com tempos de setup dependentes da sequênciaScheduling. Parallel machines. Sequence-dependent setup times. Heuristic.Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística.This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times.O propósito deste trabalho foi elaborar uma heurística robusta e eficiente para o problema de programação de um conjunto de n tarefas com tempos de setup explícitos e dependentes da sequência em um conjunto de m máquinas de forma a minimizar o makespan (duração total da programação). Os resultados foram testados com instâncias artificiais baseadas em trabalhos publicados na literatura específica e comparados com um limitante inferior (lower bound) proposto a partir de um modelo de programação linear inteira mista. A qualidade da solução heurística foi medida com base no desvio percentual em relação ao limitante inferior. A experimentação demonstrou tanto a eficácia da solução, com desvio relativo médio de 5,51%, como a eficiência computacional da heurística, com tempos de execução desprezível.Associação Brasileira de Engenharia de Produção2017-06-14info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpeghttps://www.producaoonline.org.br/rpo/article/view/237510.14488/1676-1901.v17i2.2375Revista Produção Online; Vol. 17 No. 2 (2017); 463-481Revista Produção Online; v. 17 n. 2 (2017); 463-4811676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/2375/1530https://www.producaoonline.org.br/rpo/article/view/2375/1531Copyright (c) 2017 Revista Produção Onlineinfo:eu-repo/semantics/openAccessMundim, Leandro ResendeFuchigami, Helio Yochihiro2017-06-14T13:16:43Zoai:ojs.emnuvens.com.br:article/2375Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2017-06-14T13:16:43Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false
dc.title.none.fl_str_mv A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
Uma heurística robusta para programação de máquinas paralelas com tempos de setup dependentes da sequência
title A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
spellingShingle A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
Mundim, Leandro Resende
Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic.
Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística.
title_short A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
title_full A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
title_fullStr A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
title_full_unstemmed A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
title_sort A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
author Mundim, Leandro Resende
author_facet Mundim, Leandro Resende
Fuchigami, Helio Yochihiro
author_role author
author2 Fuchigami, Helio Yochihiro
author2_role author
dc.contributor.author.fl_str_mv Mundim, Leandro Resende
Fuchigami, Helio Yochihiro
dc.subject.por.fl_str_mv Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic.
Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística.
topic Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic.
Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística.
description This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times.
publishDate 2017
dc.date.none.fl_str_mv 2017-06-14
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/2375
10.14488/1676-1901.v17i2.2375
url https://www.producaoonline.org.br/rpo/article/view/2375
identifier_str_mv 10.14488/1676-1901.v17i2.2375
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/2375/1530
https://www.producaoonline.org.br/rpo/article/view/2375/1531
dc.rights.driver.fl_str_mv Copyright (c) 2017 Revista Produção Online
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2017 Revista Produção Online
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
audio/mpeg
dc.publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
dc.source.none.fl_str_mv Revista Produção Online; Vol. 17 No. 2 (2017); 463-481
Revista Produção Online; v. 17 n. 2 (2017); 463-481
1676-1901
reponame:Revista Produção Online
instname:Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron:ABEPRO
instname_str Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron_str ABEPRO
institution ABEPRO
reponame_str Revista Produção Online
collection Revista Produção Online
repository.name.fl_str_mv Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)
repository.mail.fl_str_mv ||producaoonline@gmail.com
_version_ 1761536950364274688