QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART
Autor(a) principal: | |
---|---|
Data de Publicação: | 2007 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Produção Online |
Texto Completo: | https://www.producaoonline.org.br/rpo/article/view/77 |
Resumo: | This paper aims to evaluate stability and quality guarantee of the productive process regarding soluble coffee plant situated in the state of Paraná. The collected sample contents 4.598 observations of weight of 50 and 100 grams cans. The process of collection was made automatically during period of October 8th and December 5th 2004. ARIMA model’s residues were evaluated by the cumulated sum control charts (CUSUM) with “V” mask form, which showed that productive process is statistically unstable. This is evinces fragility of the process regarding the guarantee for the products that do not comply with requirements, mainly the weight of the 50 grams’ containers. The results suggest that employees should have more accurate attention to the discipline and control of everyday activities, besides banning mistakes made by them on the routine work that can be solved with the right orientation and changing equipment adjustment procedures. Key Words: ARIMA, Cumulated Cum Control Charts (CUSUM), Soluble Coffee Productive Process. |
id |
ABEPRO-2_92dc6657af9e3d4f4997a6cd8f2c39c7 |
---|---|
oai_identifier_str |
oai:ojs.emnuvens.com.br:article/77 |
network_acronym_str |
ABEPRO-2 |
network_name_str |
Revista Produção Online |
repository_id_str |
|
spelling |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHARTGARANTIA DA QUALIDADE DO CAFÉ SOLÚVEL COM O USO DO GRÁFICO DE CONTROLE DE SOMAS ACUMULADASThis paper aims to evaluate stability and quality guarantee of the productive process regarding soluble coffee plant situated in the state of Paraná. The collected sample contents 4.598 observations of weight of 50 and 100 grams cans. The process of collection was made automatically during period of October 8th and December 5th 2004. ARIMA model’s residues were evaluated by the cumulated sum control charts (CUSUM) with “V” mask form, which showed that productive process is statistically unstable. This is evinces fragility of the process regarding the guarantee for the products that do not comply with requirements, mainly the weight of the 50 grams’ containers. The results suggest that employees should have more accurate attention to the discipline and control of everyday activities, besides banning mistakes made by them on the routine work that can be solved with the right orientation and changing equipment adjustment procedures. Key Words: ARIMA, Cumulated Cum Control Charts (CUSUM), Soluble Coffee Productive Process.Este trabalho tem por objetivo analisar o nível de estabilidade e garantia da qualidade do processo de fabricação de café solúvel em uma indústria no Estado do Paraná. A amostra coletada corresponde a 4.598 observações do peso de latas de 50g e 100g de café instantâneo em pó, sendo realizada de forma computadorizada no período de 8 de outubro a 5 de dezembro de 2004. Os resultados auferidos, com base nos resíduos provenientes dos modelos autoregressivos de terceira ordem (ARIMA), foram avaliados com base na carta de controle de somas acumuladas (CUSUM) a qual evidenciou um processo produtivo instável estatisticamente, o que corrobora com uma fragilidade do processo no que tange à garantia de produtos não conformes, principalmente quanto ao peso dos vasilhames de 50g. Os resultados apresentados propõem maior atenção por parte dos funcionários da indústria de fabricação de café, dispensando maior disciplina e controle nas atividades realizadas no dia-a-dia, além de permitir dizimar importantes erros cometidos na rotina de trabalho e que podem ser solucionados com boa orientação e mudança de comportamento no que tange à regulagem e manutenção dos equipamentos. Palavras Chave: ARIMA, Somas Acumuladas e Café.Associação Brasileira de Engenharia de Produção2007-10-24info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpeghttps://www.producaoonline.org.br/rpo/article/view/7710.14488/1676-1901.v7i2.77Revista Produção Online; Vol. 7 No. 2 (2007)Revista Produção Online; v. 7 n. 2 (2007)1676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/77/82https://www.producaoonline.org.br/rpo/article/view/77/83Copyright (c) 2014 Revista Produção Onlineinfo:eu-repo/semantics/openAccessda Silva, Wesley VieiraFontanini, Carlos Augusto CandêoDel Corso, Jansen Maia2021-10-14T22:02:45Zoai:ojs.emnuvens.com.br:article/77Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2021-10-14T22:02:45Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART GARANTIA DA QUALIDADE DO CAFÉ SOLÚVEL COM O USO DO GRÁFICO DE CONTROLE DE SOMAS ACUMULADAS |
title |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
spellingShingle |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART da Silva, Wesley Vieira |
title_short |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
title_full |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
title_fullStr |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
title_full_unstemmed |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
title_sort |
QUALITY ASSURANCE IN THE PRODUCTION OF INSTANT COFFEE USING THE CUSUM CONTROL CHART |
author |
da Silva, Wesley Vieira |
author_facet |
da Silva, Wesley Vieira Fontanini, Carlos Augusto Candêo Del Corso, Jansen Maia |
author_role |
author |
author2 |
Fontanini, Carlos Augusto Candêo Del Corso, Jansen Maia |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
da Silva, Wesley Vieira Fontanini, Carlos Augusto Candêo Del Corso, Jansen Maia |
description |
This paper aims to evaluate stability and quality guarantee of the productive process regarding soluble coffee plant situated in the state of Paraná. The collected sample contents 4.598 observations of weight of 50 and 100 grams cans. The process of collection was made automatically during period of October 8th and December 5th 2004. ARIMA model’s residues were evaluated by the cumulated sum control charts (CUSUM) with “V” mask form, which showed that productive process is statistically unstable. This is evinces fragility of the process regarding the guarantee for the products that do not comply with requirements, mainly the weight of the 50 grams’ containers. The results suggest that employees should have more accurate attention to the discipline and control of everyday activities, besides banning mistakes made by them on the routine work that can be solved with the right orientation and changing equipment adjustment procedures. Key Words: ARIMA, Cumulated Cum Control Charts (CUSUM), Soluble Coffee Productive Process. |
publishDate |
2007 |
dc.date.none.fl_str_mv |
2007-10-24 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/77 10.14488/1676-1901.v7i2.77 |
url |
https://www.producaoonline.org.br/rpo/article/view/77 |
identifier_str_mv |
10.14488/1676-1901.v7i2.77 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/77/82 https://www.producaoonline.org.br/rpo/article/view/77/83 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2014 Revista Produção Online info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2014 Revista Produção Online |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf audio/mpeg |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Revista Produção Online; Vol. 7 No. 2 (2007) Revista Produção Online; v. 7 n. 2 (2007) 1676-1901 reponame:Revista Produção Online instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Revista Produção Online |
collection |
Revista Produção Online |
repository.name.fl_str_mv |
Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||producaoonline@gmail.com |
_version_ |
1761536946744590336 |