Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company

Detalhes bibliográficos
Autor(a) principal: Santos, Pedro Vieira Souza
Data de Publicação: 2019
Outros Autores: Ferraz, Andréa de Vasconcelos, Castro Silva, Ana Cristina Gonçalves
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista Produção Online
Texto Completo: https://www.producaoonline.org.br/rpo/article/view/3310
Resumo: The industries of the gypsum segment, due to the high production volume, represent a sector of great economic importance and that needs studies that visualize the efficiency of the production system. Thus, using the Value Stream Mapping (MFV) tool, the study was able to answer the defined problem, namely, what are the probable wastes and bottlenecks that the value stream mapping can help to identify in a company of gypsum sector. Based on time studies (chronoanalysis), it was observed that the calcination operation is the bottleneck of the production system, presenting a Standard Time of 6338.5 s, which represents approximately 55% of the total processing time for a batch with an average of 95 bags of 40 kg each. Thus, it is emphasized the importance of studying the calcination process, indicated as bottleneck process, from the observation of the high cycle time in relation to the takt time, which results in an imbalance in the rhythm to meet the demand.
id ABEPRO-2_c386ed11787c4ed436085c0b9ccc37b5
oai_identifier_str oai:ojs.emnuvens.com.br:article/3310
network_acronym_str ABEPRO-2
network_name_str Revista Produção Online
repository_id_str
spelling Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing companyUtilização da ferramenta mapeamento de fluxo de valor (MFV) para identificação de desperdícios no processo produtivo de uma empresa fabricante de gessoValue Stream Mapping. Lean Manufacturing. Gypsum Industry.Mapeamento Fluxo de Valor. Lean Manufacturing. Indústria de gesso.The industries of the gypsum segment, due to the high production volume, represent a sector of great economic importance and that needs studies that visualize the efficiency of the production system. Thus, using the Value Stream Mapping (MFV) tool, the study was able to answer the defined problem, namely, what are the probable wastes and bottlenecks that the value stream mapping can help to identify in a company of gypsum sector. Based on time studies (chronoanalysis), it was observed that the calcination operation is the bottleneck of the production system, presenting a Standard Time of 6338.5 s, which represents approximately 55% of the total processing time for a batch with an average of 95 bags of 40 kg each. Thus, it is emphasized the importance of studying the calcination process, indicated as bottleneck process, from the observation of the high cycle time in relation to the takt time, which results in an imbalance in the rhythm to meet the demand.As indústrias do segmento gesseiro, devido ao alto volume de produção, representam um setor de grande importância econômica e que carece de estudos que visualizem a eficiência do sistema de produção. Assim, a partir da utilização da ferramenta Mapeamento de Fluxo de Valor (MFV), o estudo pôde responder a problemática definida, ou seja, apontar quais os prováveis desperdícios e gargalos que o mapeamento de fluxo de valor pode auxiliar a identificar em uma empresa do setor do gesso. Com base nos estudos de tempos (cronoanálise), observou-se que a operação de calcinação é o gargalo do sistema de produção, apresentando um Tempo Padrão de 6338,5 s, o que representa aproximadamente 55% do tempo total de processamento para produção de um lote com, em média, 95 sacos de 40 kg cada. Logo, ressalta-se a importância de se estudar o processo de calcinação, indicado como processo gargalo, a partir da observação do elevado tempo de ciclo em relação ao takt time, o que acarreta em um desequilíbrio no ritmo para atender a demanda.Associação Brasileira de Engenharia de Produção2019-12-16info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfvideo/mp4https://www.producaoonline.org.br/rpo/article/view/331010.14488/1676-1901.v19i4.3310Revista Produção Online; Vol. 19 No. 4 (2019); 1197-1230Revista Produção Online; v. 19 n. 4 (2019); 1197-12301676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/3310/1850https://www.producaoonline.org.br/rpo/article/view/3310/1851Copyright (c) 2019 Revista Produção Onlineinfo:eu-repo/semantics/openAccessSantos, Pedro Vieira SouzaFerraz, Andréa de VasconcelosCastro Silva, Ana Cristina Gonçalves2019-12-19T22:26:14Zoai:ojs.emnuvens.com.br:article/3310Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2019-12-19T22:26:14Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false
dc.title.none.fl_str_mv Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
Utilização da ferramenta mapeamento de fluxo de valor (MFV) para identificação de desperdícios no processo produtivo de uma empresa fabricante de gesso
title Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
spellingShingle Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
Santos, Pedro Vieira Souza
Value Stream Mapping. Lean Manufacturing. Gypsum Industry.
Mapeamento Fluxo de Valor. Lean Manufacturing. Indústria de gesso.
title_short Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
title_full Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
title_fullStr Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
title_full_unstemmed Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
title_sort Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company
author Santos, Pedro Vieira Souza
author_facet Santos, Pedro Vieira Souza
Ferraz, Andréa de Vasconcelos
Castro Silva, Ana Cristina Gonçalves
author_role author
author2 Ferraz, Andréa de Vasconcelos
Castro Silva, Ana Cristina Gonçalves
author2_role author
author
dc.contributor.author.fl_str_mv Santos, Pedro Vieira Souza
Ferraz, Andréa de Vasconcelos
Castro Silva, Ana Cristina Gonçalves
dc.subject.por.fl_str_mv Value Stream Mapping. Lean Manufacturing. Gypsum Industry.
Mapeamento Fluxo de Valor. Lean Manufacturing. Indústria de gesso.
topic Value Stream Mapping. Lean Manufacturing. Gypsum Industry.
Mapeamento Fluxo de Valor. Lean Manufacturing. Indústria de gesso.
description The industries of the gypsum segment, due to the high production volume, represent a sector of great economic importance and that needs studies that visualize the efficiency of the production system. Thus, using the Value Stream Mapping (MFV) tool, the study was able to answer the defined problem, namely, what are the probable wastes and bottlenecks that the value stream mapping can help to identify in a company of gypsum sector. Based on time studies (chronoanalysis), it was observed that the calcination operation is the bottleneck of the production system, presenting a Standard Time of 6338.5 s, which represents approximately 55% of the total processing time for a batch with an average of 95 bags of 40 kg each. Thus, it is emphasized the importance of studying the calcination process, indicated as bottleneck process, from the observation of the high cycle time in relation to the takt time, which results in an imbalance in the rhythm to meet the demand.
publishDate 2019
dc.date.none.fl_str_mv 2019-12-16
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/3310
10.14488/1676-1901.v19i4.3310
url https://www.producaoonline.org.br/rpo/article/view/3310
identifier_str_mv 10.14488/1676-1901.v19i4.3310
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://www.producaoonline.org.br/rpo/article/view/3310/1850
https://www.producaoonline.org.br/rpo/article/view/3310/1851
dc.rights.driver.fl_str_mv Copyright (c) 2019 Revista Produção Online
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2019 Revista Produção Online
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
video/mp4
dc.publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
dc.source.none.fl_str_mv Revista Produção Online; Vol. 19 No. 4 (2019); 1197-1230
Revista Produção Online; v. 19 n. 4 (2019); 1197-1230
1676-1901
reponame:Revista Produção Online
instname:Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron:ABEPRO
instname_str Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron_str ABEPRO
institution ABEPRO
reponame_str Revista Produção Online
collection Revista Produção Online
repository.name.fl_str_mv Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)
repository.mail.fl_str_mv ||producaoonline@gmail.com
_version_ 1761536951174823936