DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Brazilian Journal of Operations & Production Management (Online) |
Texto Completo: | https://bjopm.org.br/bjopm/article/view/V13N1A3 |
Resumo: | This project analyzes and discusses the application of a methodological valuation model of an environmental maturity of a company of vectors and pests control. The method used was the initial environmental diagnostics, which intended to classify in a scale of values the Business Process of the company to Certification based on NBR ISO 14001. As a result of the application of the method were identified EMS Critical Success Spots low performed by the company, and the positive influence of ISO 9001 Certification already established in the organization. As well as, proposed actions to improve the weaknesses that were identified by the diagnostics in order to establish a schedule for the compliance of the first phase of the PDCA method proposed by the ISO 14001. |
id |
ABEPRO_3ed953cf3e2809a7d7c80dfd317cf489 |
---|---|
oai_identifier_str |
oai:ojs.bjopm.org.br:article/237 |
network_acronym_str |
ABEPRO |
network_name_str |
Brazilian Journal of Operations & Production Management (Online) |
repository_id_str |
|
spelling |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTORDIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOREnvironmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001.Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001.This project analyzes and discusses the application of a methodological valuation model of an environmental maturity of a company of vectors and pests control. The method used was the initial environmental diagnostics, which intended to classify in a scale of values the Business Process of the company to Certification based on NBR ISO 14001. As a result of the application of the method were identified EMS Critical Success Spots low performed by the company, and the positive influence of ISO 9001 Certification already established in the organization. As well as, proposed actions to improve the weaknesses that were identified by the diagnostics in order to establish a schedule for the compliance of the first phase of the PDCA method proposed by the ISO 14001.This project analyzes and discusses the application of a methodological valuation model of an environmental maturity of a company of vectors and pests control. The method used was the initial environmental diagnostics, which intended to classify in a scale of values the Business Process of the company to Certification based on NBR ISO 14001. As a result of the application of the method were identified EMS Critical Success Spots low performed by the company, and the positive influence of ISO 9001 Certification already established in the organization. As well as, proposed actions to improve the weaknesses that were identified by the diagnostics in order to establish a schedule for the compliance of the first phase of the PDCA method proposed by the ISO 14001.Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)2016-03-20info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer-reviewed Articleapplication/pdfhttps://bjopm.org.br/bjopm/article/view/V13N1A310.14488/BJOPM.2016.v13.n1.a3Brazilian Journal of Operations & Production Management; Vol. 13 No. 1 (2016): March, 2016; 32-432237-8960reponame:Brazilian Journal of Operations & Production Management (Online)instname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROenghttps://bjopm.org.br/bjopm/article/view/V13N1A3/BJOPMV13N1A3Copyright (c) 2016 Brazilian Journal of Operations & Production Managementinfo:eu-repo/semantics/openAccessRibeiro, Renata MacielBarros, Sergio RicardoWasserman, Julio CesarFranz, Barbara2019-05-22T01:07:55Zoai:ojs.bjopm.org.br:article/237Revistahttps://bjopm.org.br/bjopmONGhttps://bjopm.org.br/bjopm/oaibjopm.journal@gmail.com2237-89601679-8171opendoar:2023-03-13T09:45:09.263723Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
title |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
spellingShingle |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR Ribeiro, Renata Maciel Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. |
title_short |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
title_full |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
title_fullStr |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
title_full_unstemmed |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
title_sort |
DIAGNOSIS FOR THE IMPLEMENTATION OF AN ENVIRONMENTAL MANAGEMENT SYSTEM IN A MICROBUSINESS IN THE URBAN VECTOR AND PEST CONTROL SECTOR |
author |
Ribeiro, Renata Maciel |
author_facet |
Ribeiro, Renata Maciel Barros, Sergio Ricardo Wasserman, Julio Cesar Franz, Barbara |
author_role |
author |
author2 |
Barros, Sergio Ricardo Wasserman, Julio Cesar Franz, Barbara |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Ribeiro, Renata Maciel Barros, Sergio Ricardo Wasserman, Julio Cesar Franz, Barbara |
dc.subject.por.fl_str_mv |
Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. |
topic |
Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. Environmental Management System. Environmental Diagnostics.Vectors and Pests Control. ISO 14001. |
description |
This project analyzes and discusses the application of a methodological valuation model of an environmental maturity of a company of vectors and pests control. The method used was the initial environmental diagnostics, which intended to classify in a scale of values the Business Process of the company to Certification based on NBR ISO 14001. As a result of the application of the method were identified EMS Critical Success Spots low performed by the company, and the positive influence of ISO 9001 Certification already established in the organization. As well as, proposed actions to improve the weaknesses that were identified by the diagnostics in order to establish a schedule for the compliance of the first phase of the PDCA method proposed by the ISO 14001. |
publishDate |
2016 |
dc.date.none.fl_str_mv |
2016-03-20 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer-reviewed Article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/V13N1A3 10.14488/BJOPM.2016.v13.n1.a3 |
url |
https://bjopm.org.br/bjopm/article/view/V13N1A3 |
identifier_str_mv |
10.14488/BJOPM.2016.v13.n1.a3 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/V13N1A3/BJOPMV13N1A3 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2016 Brazilian Journal of Operations & Production Management info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2016 Brazilian Journal of Operations & Production Management |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
dc.source.none.fl_str_mv |
Brazilian Journal of Operations & Production Management; Vol. 13 No. 1 (2016): March, 2016; 32-43 2237-8960 reponame:Brazilian Journal of Operations & Production Management (Online) instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Brazilian Journal of Operations & Production Management (Online) |
collection |
Brazilian Journal of Operations & Production Management (Online) |
repository.name.fl_str_mv |
Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
bjopm.journal@gmail.com |
_version_ |
1797051460394942464 |