Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand
Autor(a) principal: | |
---|---|
Data de Publicação: | 2010 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Brazilian Journal of Operations & Production Management (Online) |
Texto Completo: | https://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1 |
Resumo: | This study was motivated by the poor inventory management performance in a Brazilian food company with a high seasonal demand. It was clearly recognized that the best inventory management would depend on improvements in demand forecasting and in the production planning process itself. In order to deal with the identified problems, an aggregate production planning model based on linear programming has been developed. The model determines the monthly production rates and inventory levels of finished products as well as the work-force requirements to accomplish productions plans. A simple disaggregating method, which searches for equal run out times, translates the aggregate plans into a detailed master production schedule for a shorter horizon of three months.With the effective usage of this model, and improvements in the demand forecasting processes, a global reduction of inventory levels of both raw materials and final products can be achieved. |
id |
ABEPRO_62c346615826e990fea9fa73176f9bb9 |
---|---|
oai_identifier_str |
oai:ojs.bjopm.org.br:article/29 |
network_acronym_str |
ABEPRO |
network_name_str |
Brazilian Journal of Operations & Production Management (Online) |
repository_id_str |
|
spelling |
Aggregate Planning for a Large Food Manufacturer with High Seasonal DemandThis study was motivated by the poor inventory management performance in a Brazilian food company with a high seasonal demand. It was clearly recognized that the best inventory management would depend on improvements in demand forecasting and in the production planning process itself. In order to deal with the identified problems, an aggregate production planning model based on linear programming has been developed. The model determines the monthly production rates and inventory levels of finished products as well as the work-force requirements to accomplish productions plans. A simple disaggregating method, which searches for equal run out times, translates the aggregate plans into a detailed master production schedule for a shorter horizon of three months.With the effective usage of this model, and improvements in the demand forecasting processes, a global reduction of inventory levels of both raw materials and final products can be achieved.Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)2010-02-08info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer-reviewed Articleapplication/pdfhttps://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1Brazilian Journal of Operations & Production Management; Vol. 3 No. 1 (2006): July, 2006; 5-202237-8960reponame:Brazilian Journal of Operations & Production Management (Online)instname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROenghttps://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1/pdf_21Takey, Flávia M.Mesquita, Marco A.info:eu-repo/semantics/openAccess2019-04-04T07:29:15Zoai:ojs.bjopm.org.br:article/29Revistahttps://bjopm.org.br/bjopmONGhttps://bjopm.org.br/bjopm/oaibjopm.journal@gmail.com2237-89601679-8171opendoar:2023-03-13T09:45:00.991902Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
title |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
spellingShingle |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand Takey, Flávia M. |
title_short |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
title_full |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
title_fullStr |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
title_full_unstemmed |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
title_sort |
Aggregate Planning for a Large Food Manufacturer with High Seasonal Demand |
author |
Takey, Flávia M. |
author_facet |
Takey, Flávia M. Mesquita, Marco A. |
author_role |
author |
author2 |
Mesquita, Marco A. |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Takey, Flávia M. Mesquita, Marco A. |
description |
This study was motivated by the poor inventory management performance in a Brazilian food company with a high seasonal demand. It was clearly recognized that the best inventory management would depend on improvements in demand forecasting and in the production planning process itself. In order to deal with the identified problems, an aggregate production planning model based on linear programming has been developed. The model determines the monthly production rates and inventory levels of finished products as well as the work-force requirements to accomplish productions plans. A simple disaggregating method, which searches for equal run out times, translates the aggregate plans into a detailed master production schedule for a shorter horizon of three months.With the effective usage of this model, and improvements in the demand forecasting processes, a global reduction of inventory levels of both raw materials and final products can be achieved. |
publishDate |
2010 |
dc.date.none.fl_str_mv |
2010-02-08 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer-reviewed Article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1 |
url |
https://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/BJV3N1_2006_P1/pdf_21 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
dc.source.none.fl_str_mv |
Brazilian Journal of Operations & Production Management; Vol. 3 No. 1 (2006): July, 2006; 5-20 2237-8960 reponame:Brazilian Journal of Operations & Production Management (Online) instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Brazilian Journal of Operations & Production Management (Online) |
collection |
Brazilian Journal of Operations & Production Management (Online) |
repository.name.fl_str_mv |
Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
bjopm.journal@gmail.com |
_version_ |
1797051459567616000 |