Project optimization
Autor(a) principal: | |
---|---|
Data de Publicação: | 2015 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | REM. Revista Escola de Minas (Online) |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000100097 |
Resumo: | A mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for the project is the application of combined methods, i.e., the open pit followed by underground mining. In these situations, the major difficulty is the definition of the transition point of methods, seeking to maximize the net present value of the project and the use of mineral resources. The premature suspension of activities in the open pit, as well as advancing beyond the optimum depth, can derail the implementation of the combination of methods, so it is important to analyze the project not only individually but also in an integrated way. |
id |
ESCOLADEMINAS-1_60f43ec9ab22a39430ba4f661f9020cc |
---|---|
oai_identifier_str |
oai:scielo:S0370-44672015000100097 |
network_acronym_str |
ESCOLADEMINAS-1 |
network_name_str |
REM. Revista Escola de Minas (Online) |
repository_id_str |
|
spelling |
Project optimizationmine planningopen pit optimizationunderground miningmethods transitionA mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for the project is the application of combined methods, i.e., the open pit followed by underground mining. In these situations, the major difficulty is the definition of the transition point of methods, seeking to maximize the net present value of the project and the use of mineral resources. The premature suspension of activities in the open pit, as well as advancing beyond the optimum depth, can derail the implementation of the combination of methods, so it is important to analyze the project not only individually but also in an integrated way.Escola de Minas2015-03-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000100097Rem: Revista Escola de Minas v.68 n.1 2015reponame:REM. Revista Escola de Minas (Online)instname:Escola de Minasinstacron:ESCOLA DE MINAS10.1590/0370-44672015680018info:eu-repo/semantics/openAccessCarli,Carla DeLemos,Peroni Rodrigo deeng2015-10-09T00:00:00Zoai:scielo:S0370-44672015000100097Revistahttp://www.scielo.br/remhttps://old.scielo.br/oai/scielo-oai.phpeditor@rem.com.br1807-03530370-4467opendoar:2015-10-09T00:00REM. Revista Escola de Minas (Online) - Escola de Minasfalse |
dc.title.none.fl_str_mv |
Project optimization |
title |
Project optimization |
spellingShingle |
Project optimization Carli,Carla De mine planning open pit optimization underground mining methods transition |
title_short |
Project optimization |
title_full |
Project optimization |
title_fullStr |
Project optimization |
title_full_unstemmed |
Project optimization |
title_sort |
Project optimization |
author |
Carli,Carla De |
author_facet |
Carli,Carla De Lemos,Peroni Rodrigo de |
author_role |
author |
author2 |
Lemos,Peroni Rodrigo de |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Carli,Carla De Lemos,Peroni Rodrigo de |
dc.subject.por.fl_str_mv |
mine planning open pit optimization underground mining methods transition |
topic |
mine planning open pit optimization underground mining methods transition |
description |
A mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for the project is the application of combined methods, i.e., the open pit followed by underground mining. In these situations, the major difficulty is the definition of the transition point of methods, seeking to maximize the net present value of the project and the use of mineral resources. The premature suspension of activities in the open pit, as well as advancing beyond the optimum depth, can derail the implementation of the combination of methods, so it is important to analyze the project not only individually but also in an integrated way. |
publishDate |
2015 |
dc.date.none.fl_str_mv |
2015-03-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000100097 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000100097 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/0370-44672015680018 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Escola de Minas |
publisher.none.fl_str_mv |
Escola de Minas |
dc.source.none.fl_str_mv |
Rem: Revista Escola de Minas v.68 n.1 2015 reponame:REM. Revista Escola de Minas (Online) instname:Escola de Minas instacron:ESCOLA DE MINAS |
instname_str |
Escola de Minas |
instacron_str |
ESCOLA DE MINAS |
institution |
ESCOLA DE MINAS |
reponame_str |
REM. Revista Escola de Minas (Online) |
collection |
REM. Revista Escola de Minas (Online) |
repository.name.fl_str_mv |
REM. Revista Escola de Minas (Online) - Escola de Minas |
repository.mail.fl_str_mv |
editor@rem.com.br |
_version_ |
1754122198993338368 |