Influence of water level in mine sequencing applied to strategic mining planning

Detalhes bibliográficos
Autor(a) principal: Fontes,Marcélio Prado
Data de Publicação: 2020
Outros Autores: Peroni,Rodrigo de Lemos
Tipo de documento: Artigo
Idioma: eng
Título da fonte: REM - International Engineering Journal
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2020000200233
Resumo: Abstract Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.
id FG-1_6282ee2cedaebfa0222bb24c4dfe85a3
oai_identifier_str oai:scielo:S2448-167X2020000200233
network_acronym_str FG-1
network_name_str REM - International Engineering Journal
repository_id_str
spelling Influence of water level in mine sequencing applied to strategic mining planningsequencingmininggroundwatermineral economicsAbstract Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.Fundação Gorceix2020-06-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2020000200233REM - International Engineering Journal v.73 n.2 2020reponame:REM - International Engineering Journalinstname:Fundação Gorceix (FG)instacron:FG10.1590/0370-44672019730082info:eu-repo/semantics/openAccessFontes,Marcélio PradoPeroni,Rodrigo de Lemoseng2020-04-08T00:00:00Zoai:scielo:S2448-167X2020000200233Revistahttps://www.rem.com.br/?lang=pt-brPRIhttps://old.scielo.br/oai/scielo-oai.php||editor@rem.com.br2448-167X2448-167Xopendoar:2020-04-08T00:00REM - International Engineering Journal - Fundação Gorceix (FG)false
dc.title.none.fl_str_mv Influence of water level in mine sequencing applied to strategic mining planning
title Influence of water level in mine sequencing applied to strategic mining planning
spellingShingle Influence of water level in mine sequencing applied to strategic mining planning
Fontes,Marcélio Prado
sequencing
mining
groundwater
mineral economics
title_short Influence of water level in mine sequencing applied to strategic mining planning
title_full Influence of water level in mine sequencing applied to strategic mining planning
title_fullStr Influence of water level in mine sequencing applied to strategic mining planning
title_full_unstemmed Influence of water level in mine sequencing applied to strategic mining planning
title_sort Influence of water level in mine sequencing applied to strategic mining planning
author Fontes,Marcélio Prado
author_facet Fontes,Marcélio Prado
Peroni,Rodrigo de Lemos
author_role author
author2 Peroni,Rodrigo de Lemos
author2_role author
dc.contributor.author.fl_str_mv Fontes,Marcélio Prado
Peroni,Rodrigo de Lemos
dc.subject.por.fl_str_mv sequencing
mining
groundwater
mineral economics
topic sequencing
mining
groundwater
mineral economics
description Abstract Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.
publishDate 2020
dc.date.none.fl_str_mv 2020-06-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2020000200233
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2020000200233
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/0370-44672019730082
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Fundação Gorceix
publisher.none.fl_str_mv Fundação Gorceix
dc.source.none.fl_str_mv REM - International Engineering Journal v.73 n.2 2020
reponame:REM - International Engineering Journal
instname:Fundação Gorceix (FG)
instacron:FG
instname_str Fundação Gorceix (FG)
instacron_str FG
institution FG
reponame_str REM - International Engineering Journal
collection REM - International Engineering Journal
repository.name.fl_str_mv REM - International Engineering Journal - Fundação Gorceix (FG)
repository.mail.fl_str_mv ||editor@rem.com.br
_version_ 1754734691479453696