Resumo: Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.
id UFRGS-2_3e8f418b243cf53a71d2c0f999c0c1eb
oai_identifier_str oai:www.lume.ufrgs.br:10183/218178
network_acronym_str UFRGS-2
network_name_str Repositório Institucional da UFRGS
repository_id_str
spelling Fontes, Marcélio PradoPeroni, Rodrigo de Lemos2021-02-24T04:18:25Z20202448-167Xhttp://hdl.handle.net/10183/218178001121225Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.application/pdfengREM : international engineering journal. Ouro Preto, MG. Vol. 73, no. 2 (Apr./June 2020), p. 233-240MineraçãoLençol freáticoEconomia mineralSequencingMiningGroundwaterMineral economicsInfluence of water level in mine sequencing applied to strategic mining planninginfo:eu-repo/semantics/articleinfo:eu-repo/semantics/otherinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/openAccessreponame:Repositório Institucional da UFRGSinstname:Universidade Federal do Rio Grande do Sul (UFRGS)instacron:UFRGSTEXT001121225.pdf.txt001121225.pdf.txtExtracted Texttext/plain33275http://www.lume.ufrgs.br/bitstream/10183/218178/2/001121225.pdf.txt6c9c7a1ad318f8db6df6d81e9824ac34MD52ORIGINAL001121225.pdfTexto completo (inglês)application/pdf1028987http://www.lume.ufrgs.br/bitstream/10183/218178/1/001121225.pdf8e0d5ddcdcea37a50aa822685152ca79MD5110183/2181782023-08-09 03:49:03.669196oai:www.lume.ufrgs.br:10183/218178Repositório de PublicaçõesPUBhttps://lume.ufrgs.br/oai/requestopendoar:2023-08-09T06:49:03Repositório Institucional da UFRGS - Universidade Federal do Rio Grande do Sul (UFRGS)false
dc.title.pt_BR.fl_str_mv Influence of water level in mine sequencing applied to strategic mining planning
title Influence of water level in mine sequencing applied to strategic mining planning
spellingShingle Influence of water level in mine sequencing applied to strategic mining planning
Fontes, Marcélio Prado
Mineração
Lençol freático
Economia mineral
Sequencing
Mining
Groundwater
Mineral economics
title_short Influence of water level in mine sequencing applied to strategic mining planning
title_full Influence of water level in mine sequencing applied to strategic mining planning
title_fullStr Influence of water level in mine sequencing applied to strategic mining planning
title_full_unstemmed Influence of water level in mine sequencing applied to strategic mining planning
title_sort Influence of water level in mine sequencing applied to strategic mining planning
author Fontes, Marcélio Prado
author_facet Fontes, Marcélio Prado
Peroni, Rodrigo de Lemos
author_role author
author2 Peroni, Rodrigo de Lemos
author2_role author
dc.contributor.author.fl_str_mv Fontes, Marcélio Prado
Peroni, Rodrigo de Lemos
dc.subject.por.fl_str_mv Mineração
Lençol freático
Economia mineral
topic Mineração
Lençol freático
Economia mineral
Sequencing
Mining
Groundwater
Mineral economics
dc.subject.eng.fl_str_mv Sequencing
Mining
Groundwater
Mineral economics
description Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.
publishDate 2020
dc.date.issued.fl_str_mv 2020
dc.date.accessioned.fl_str_mv 2021-02-24T04:18:25Z
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/other
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://hdl.handle.net/10183/218178
dc.identifier.issn.pt_BR.fl_str_mv 2448-167X
dc.identifier.nrb.pt_BR.fl_str_mv 001121225
identifier_str_mv 2448-167X
001121225
url http://hdl.handle.net/10183/218178
dc.language.iso.fl_str_mv eng
language eng
dc.relation.ispartof.pt_BR.fl_str_mv REM : international engineering journal. Ouro Preto, MG. Vol. 73, no. 2 (Apr./June 2020), p. 233-240
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFRGS
instname:Universidade Federal do Rio Grande do Sul (UFRGS)
instacron:UFRGS
instname_str Universidade Federal do Rio Grande do Sul (UFRGS)
instacron_str UFRGS
institution UFRGS
reponame_str Repositório Institucional da UFRGS
collection Repositório Institucional da UFRGS
bitstream.url.fl_str_mv http://www.lume.ufrgs.br/bitstream/10183/218178/2/001121225.pdf.txt
http://www.lume.ufrgs.br/bitstream/10183/218178/1/001121225.pdf
bitstream.checksum.fl_str_mv 6c9c7a1ad318f8db6df6d81e9824ac34
8e0d5ddcdcea37a50aa822685152ca79
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFRGS - Universidade Federal do Rio Grande do Sul (UFRGS)
repository.mail.fl_str_mv
_version_ 1801225008822878208