Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Independent Journal of Management & Production |
Texto Completo: | http://www.ijmp.jor.br/index.php/ijmp/article/view/455 |
Resumo: | The variation in processing times due to the human factor between the working stations of a production line can generate queues resulting in a higher cost to the productive process. The objective of this study was to apply Monte Carlo simulation to balance the capacity of a production line with stations suffering variability in processing time due to the human factor. Simulations of the current situation of the production line were performed by comparing it with a proposal to align capacity with the production restriction in order to reduce inventories process while maintaining full capacity of the line. To develop the study, the selection involves the case of a company’s production line in the metal industry that produces machinery and products for metalworking area. The results allowed pointing suggestions for the company to reduce in-process inventory, keeping then total capacity of the line. |
id |
IJMP_ea22fefdc72bfd7c8b729392e1bf95da |
---|---|
oai_identifier_str |
oai:www.ijmp.jor.br:article/455 |
network_acronym_str |
IJMP |
network_name_str |
Independent Journal of Management & Production |
repository_id_str |
|
spelling |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulationLine balancingProduction lineMonte Carlo simulationThe variation in processing times due to the human factor between the working stations of a production line can generate queues resulting in a higher cost to the productive process. The objective of this study was to apply Monte Carlo simulation to balance the capacity of a production line with stations suffering variability in processing time due to the human factor. Simulations of the current situation of the production line were performed by comparing it with a proposal to align capacity with the production restriction in order to reduce inventories process while maintaining full capacity of the line. To develop the study, the selection involves the case of a company’s production line in the metal industry that produces machinery and products for metalworking area. The results allowed pointing suggestions for the company to reduce in-process inventory, keeping then total capacity of the line.Independent2016-07-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://www.ijmp.jor.br/index.php/ijmp/article/view/45510.14807/ijmp.v7i5.455Independent Journal of Management & Production; Vol. 7 No. 5 (2016): Independent Journal of Management & Production (Special Edition); 643-6612236-269X2236-269Xreponame:Independent Journal of Management & Productioninstname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)instacron:IJM&Penghttp://www.ijmp.jor.br/index.php/ijmp/article/view/455/540http://www.ijmp.jor.br/index.php/ijmp/article/view/455/550Copyright (c) 2016 Augusto Sandes Mendes, Adriano Maniçoba da Silva, Luiz Teruo Kawamoto Júniorinfo:eu-repo/semantics/openAccessMendes, Augusto SandesSilva, Adriano Maniçoba daKawamoto Júnior, Luiz Teruo2018-09-04T13:04:27Zoai:www.ijmp.jor.br:article/455Revistahttp://www.ijmp.jor.br/PUBhttp://www.ijmp.jor.br/index.php/ijmp/oaiijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||2236-269X2236-269Xopendoar:2018-09-04T13:04:27Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)false |
dc.title.none.fl_str_mv |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
title |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
spellingShingle |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation Mendes, Augusto Sandes Line balancing Production line Monte Carlo simulation |
title_short |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
title_full |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
title_fullStr |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
title_full_unstemmed |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
title_sort |
Balance capacity with variability caused by human factor: an application in a line with Monte Carlo simulation |
author |
Mendes, Augusto Sandes |
author_facet |
Mendes, Augusto Sandes Silva, Adriano Maniçoba da Kawamoto Júnior, Luiz Teruo |
author_role |
author |
author2 |
Silva, Adriano Maniçoba da Kawamoto Júnior, Luiz Teruo |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Mendes, Augusto Sandes Silva, Adriano Maniçoba da Kawamoto Júnior, Luiz Teruo |
dc.subject.por.fl_str_mv |
Line balancing Production line Monte Carlo simulation |
topic |
Line balancing Production line Monte Carlo simulation |
description |
The variation in processing times due to the human factor between the working stations of a production line can generate queues resulting in a higher cost to the productive process. The objective of this study was to apply Monte Carlo simulation to balance the capacity of a production line with stations suffering variability in processing time due to the human factor. Simulations of the current situation of the production line were performed by comparing it with a proposal to align capacity with the production restriction in order to reduce inventories process while maintaining full capacity of the line. To develop the study, the selection involves the case of a company’s production line in the metal industry that produces machinery and products for metalworking area. The results allowed pointing suggestions for the company to reduce in-process inventory, keeping then total capacity of the line. |
publishDate |
2016 |
dc.date.none.fl_str_mv |
2016-07-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/455 10.14807/ijmp.v7i5.455 |
url |
http://www.ijmp.jor.br/index.php/ijmp/article/view/455 |
identifier_str_mv |
10.14807/ijmp.v7i5.455 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/455/540 http://www.ijmp.jor.br/index.php/ijmp/article/view/455/550 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2016 Augusto Sandes Mendes, Adriano Maniçoba da Silva, Luiz Teruo Kawamoto Júnior info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2016 Augusto Sandes Mendes, Adriano Maniçoba da Silva, Luiz Teruo Kawamoto Júnior |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf text/html |
dc.publisher.none.fl_str_mv |
Independent |
publisher.none.fl_str_mv |
Independent |
dc.source.none.fl_str_mv |
Independent Journal of Management & Production; Vol. 7 No. 5 (2016): Independent Journal of Management & Production (Special Edition); 643-661 2236-269X 2236-269X reponame:Independent Journal of Management & Production instname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) instacron:IJM&P |
instname_str |
Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
instacron_str |
IJM&P |
institution |
IJM&P |
reponame_str |
Independent Journal of Management & Production |
collection |
Independent Journal of Management & Production |
repository.name.fl_str_mv |
Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
repository.mail.fl_str_mv |
ijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br|| |
_version_ |
1797220490954145792 |