The Viana footbridge: construction and dynamic monitoring
Autor(a) principal: | |
---|---|
Data de Publicação: | 2013 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | https://repositorio-aberto.up.pt/handle/10216/80175 |
Resumo: | A new moveable footbridge was recently built at the entrance of Marina Atlantico in the city of Viana do Castelo, Portugal. This paper presents a brief description of the global solution, with a special focus on the characterisation of the construction methods adopted. Particular consideration is given to the construction of the pivot pylon and the steel structure, showing how all the bridge components work together to ensure a safe working relationship with the marina, the river and users of the continuous bicycling and pedestrian pathway running across the closed bridge. The mechanical, hydraulic, electrical and navigational light systems play fundamental roles, especially during bridge opening and closing operations. Moreover, as this light footbridge is susceptible to vibrations due to human traffic, the paper also describes the dynamic tests performed during and after construction, including two ambient vibration tests, the measurement of cable-stay forces, and tests with groups of pedestrians used to evaluate induced vibration levels along with the monitoring of bridge accelerations over 4 months of use. |
id |
RCAP_796fd9f849bc00894c80427e1ab9b60d |
---|---|
oai_identifier_str |
oai:repositorio-aberto.up.pt:10216/80175 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
The Viana footbridge: construction and dynamic monitoringEngenharia estrutural, Engenharia civilStructural engineering, Civil engineeringA new moveable footbridge was recently built at the entrance of Marina Atlantico in the city of Viana do Castelo, Portugal. This paper presents a brief description of the global solution, with a special focus on the characterisation of the construction methods adopted. Particular consideration is given to the construction of the pivot pylon and the steel structure, showing how all the bridge components work together to ensure a safe working relationship with the marina, the river and users of the continuous bicycling and pedestrian pathway running across the closed bridge. The mechanical, hydraulic, electrical and navigational light systems play fundamental roles, especially during bridge opening and closing operations. Moreover, as this light footbridge is susceptible to vibrations due to human traffic, the paper also describes the dynamic tests performed during and after construction, including two ambient vibration tests, the measurement of cable-stay forces, and tests with groups of pedestrians used to evaluate induced vibration levels along with the monitoring of bridge accelerations over 4 months of use.20132013-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttps://repositorio-aberto.up.pt/handle/10216/80175eng1478463710.1680/bren.10.00048R. BarbosaF. MagalhãesE. CaetanoÁ. Cunhainfo:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-11-29T13:36:06Zoai:repositorio-aberto.up.pt:10216/80175Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T23:43:32.484297Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
The Viana footbridge: construction and dynamic monitoring |
title |
The Viana footbridge: construction and dynamic monitoring |
spellingShingle |
The Viana footbridge: construction and dynamic monitoring R. Barbosa Engenharia estrutural, Engenharia civil Structural engineering, Civil engineering |
title_short |
The Viana footbridge: construction and dynamic monitoring |
title_full |
The Viana footbridge: construction and dynamic monitoring |
title_fullStr |
The Viana footbridge: construction and dynamic monitoring |
title_full_unstemmed |
The Viana footbridge: construction and dynamic monitoring |
title_sort |
The Viana footbridge: construction and dynamic monitoring |
author |
R. Barbosa |
author_facet |
R. Barbosa F. Magalhães E. Caetano Á. Cunha |
author_role |
author |
author2 |
F. Magalhães E. Caetano Á. Cunha |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
R. Barbosa F. Magalhães E. Caetano Á. Cunha |
dc.subject.por.fl_str_mv |
Engenharia estrutural, Engenharia civil Structural engineering, Civil engineering |
topic |
Engenharia estrutural, Engenharia civil Structural engineering, Civil engineering |
description |
A new moveable footbridge was recently built at the entrance of Marina Atlantico in the city of Viana do Castelo, Portugal. This paper presents a brief description of the global solution, with a special focus on the characterisation of the construction methods adopted. Particular consideration is given to the construction of the pivot pylon and the steel structure, showing how all the bridge components work together to ensure a safe working relationship with the marina, the river and users of the continuous bicycling and pedestrian pathway running across the closed bridge. The mechanical, hydraulic, electrical and navigational light systems play fundamental roles, especially during bridge opening and closing operations. Moreover, as this light footbridge is susceptible to vibrations due to human traffic, the paper also describes the dynamic tests performed during and after construction, including two ambient vibration tests, the measurement of cable-stay forces, and tests with groups of pedestrians used to evaluate induced vibration levels along with the monitoring of bridge accelerations over 4 months of use. |
publishDate |
2013 |
dc.date.none.fl_str_mv |
2013 2013-01-01T00:00:00Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://repositorio-aberto.up.pt/handle/10216/80175 |
url |
https://repositorio-aberto.up.pt/handle/10216/80175 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
14784637 10.1680/bren.10.00048 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799135750810238976 |