Os caminhos de ferro do Oeste português
Autor(a) principal: | |
---|---|
Data de Publicação: | 2019 |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | http://hdl.handle.net/10362/98431 |
Resumo: | When Portugal began building railways, the main goal was to connect Lisbon to Porto and the eastern frontier by the shortest route, which left a major part of the Portuguese Western regions away from the network. As soon as those goals were achieved, the Portuguese government and private investors tried to extend the network to the peripheries. Since the West was already served by the Northern line, construction had to wait until the 1880s, although different proposals were being submitted since the 1840s. In this paper, I analyse the process of integration and territorial integration of the West promoted by railways, from the embryonic planning embodied in the first projects to the opening of the Western, Sintra, and Cascais lines. To do so, I will use parliamentary debates, sundry technical reports, statistical data of the operation and recent studies on the impact of each one of those railroads. |
id |
RCAP_ad67c8f211abc24198600b19a69117d1 |
---|---|
oai_identifier_str |
oai:run.unl.pt:10362/98431 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
Os caminhos de ferro do Oeste portuguêsWestern railways of Portugaltools of territorial appropriationinstrumentos de apropriação territorialEstremaduraBeira LitoralcirculationtransportFontismoWhen Portugal began building railways, the main goal was to connect Lisbon to Porto and the eastern frontier by the shortest route, which left a major part of the Portuguese Western regions away from the network. As soon as those goals were achieved, the Portuguese government and private investors tried to extend the network to the peripheries. Since the West was already served by the Northern line, construction had to wait until the 1880s, although different proposals were being submitted since the 1840s. In this paper, I analyse the process of integration and territorial integration of the West promoted by railways, from the embryonic planning embodied in the first projects to the opening of the Western, Sintra, and Cascais lines. To do so, I will use parliamentary debates, sundry technical reports, statistical data of the operation and recent studies on the impact of each one of those railroads.CIUHCT - Centro Interuniversitário de História das Ciências e da TecnologiaRUNPereira, Hugo Silveira2020-05-27T22:45:42Z2019-122019-12-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article25application/pdfhttp://hdl.handle.net/10362/98431por1645-2259PURE: 16637328https://doi.org/10.14195/1645-2259_19_10info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2024-03-11T04:45:07Zoai:run.unl.pt:10362/98431Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-20T03:38:59.064596Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
Os caminhos de ferro do Oeste português Western railways of Portugaltools of territorial appropriation instrumentos de apropriação territorial |
title |
Os caminhos de ferro do Oeste português |
spellingShingle |
Os caminhos de ferro do Oeste português Pereira, Hugo Silveira Estremadura Beira Litoral circulation transport Fontismo |
title_short |
Os caminhos de ferro do Oeste português |
title_full |
Os caminhos de ferro do Oeste português |
title_fullStr |
Os caminhos de ferro do Oeste português |
title_full_unstemmed |
Os caminhos de ferro do Oeste português |
title_sort |
Os caminhos de ferro do Oeste português |
author |
Pereira, Hugo Silveira |
author_facet |
Pereira, Hugo Silveira |
author_role |
author |
dc.contributor.none.fl_str_mv |
CIUHCT - Centro Interuniversitário de História das Ciências e da Tecnologia RUN |
dc.contributor.author.fl_str_mv |
Pereira, Hugo Silveira |
dc.subject.por.fl_str_mv |
Estremadura Beira Litoral circulation transport Fontismo |
topic |
Estremadura Beira Litoral circulation transport Fontismo |
description |
When Portugal began building railways, the main goal was to connect Lisbon to Porto and the eastern frontier by the shortest route, which left a major part of the Portuguese Western regions away from the network. As soon as those goals were achieved, the Portuguese government and private investors tried to extend the network to the peripheries. Since the West was already served by the Northern line, construction had to wait until the 1880s, although different proposals were being submitted since the 1840s. In this paper, I analyse the process of integration and territorial integration of the West promoted by railways, from the embryonic planning embodied in the first projects to the opening of the Western, Sintra, and Cascais lines. To do so, I will use parliamentary debates, sundry technical reports, statistical data of the operation and recent studies on the impact of each one of those railroads. |
publishDate |
2019 |
dc.date.none.fl_str_mv |
2019-12 2019-12-01T00:00:00Z 2020-05-27T22:45:42Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://hdl.handle.net/10362/98431 |
url |
http://hdl.handle.net/10362/98431 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
1645-2259 PURE: 16637328 https://doi.org/10.14195/1645-2259_19_10 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
25 application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799138006123151360 |