Lead time considerations for the multi-level capacitated lot-sizing problem
Autor(a) principal: | |
---|---|
Data de Publicação: | 2015 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | http://repositorio.inesctec.pt/handle/123456789/6382 http://dx.doi.org/10.1016/j.ejor.2014.09.030 |
Resumo: | The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed. |
id |
RCAP_e3562e90136c82935e25cb4fb30cb332 |
---|---|
oai_identifier_str |
oai:repositorio.inesctec.pt:123456789/6382 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
Lead time considerations for the multi-level capacitated lot-sizing problemThe classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed.2018-01-16T15:13:09Z2015-01-01T00:00:00Z2015info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://repositorio.inesctec.pt/handle/123456789/6382http://dx.doi.org/10.1016/j.ejor.2014.09.030engAlmeder,CKlabjan,DTraxler,RBernardo Almada-Loboinfo:eu-repo/semantics/embargoedAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-05-15T10:20:50Zoai:repositorio.inesctec.pt:123456789/6382Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T17:53:42.262810Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
Lead time considerations for the multi-level capacitated lot-sizing problem |
title |
Lead time considerations for the multi-level capacitated lot-sizing problem |
spellingShingle |
Lead time considerations for the multi-level capacitated lot-sizing problem Almeder,C |
title_short |
Lead time considerations for the multi-level capacitated lot-sizing problem |
title_full |
Lead time considerations for the multi-level capacitated lot-sizing problem |
title_fullStr |
Lead time considerations for the multi-level capacitated lot-sizing problem |
title_full_unstemmed |
Lead time considerations for the multi-level capacitated lot-sizing problem |
title_sort |
Lead time considerations for the multi-level capacitated lot-sizing problem |
author |
Almeder,C |
author_facet |
Almeder,C Klabjan,D Traxler,R Bernardo Almada-Lobo |
author_role |
author |
author2 |
Klabjan,D Traxler,R Bernardo Almada-Lobo |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Almeder,C Klabjan,D Traxler,R Bernardo Almada-Lobo |
description |
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed. |
publishDate |
2015 |
dc.date.none.fl_str_mv |
2015-01-01T00:00:00Z 2015 2018-01-16T15:13:09Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://repositorio.inesctec.pt/handle/123456789/6382 http://dx.doi.org/10.1016/j.ejor.2014.09.030 |
url |
http://repositorio.inesctec.pt/handle/123456789/6382 http://dx.doi.org/10.1016/j.ejor.2014.09.030 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/embargoedAccess |
eu_rights_str_mv |
embargoedAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799131611145437184 |