A computer application for scheduling in MS Project
Autor(a) principal: | |
---|---|
Data de Publicação: | 2014 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | http://hdl.handle.net/1822/36893 |
Resumo: | The project management field has shown great progress over the last decades. With technology evolution, project managers as well as other managers have a faster and more efficient way to handle information. While progress brought more abilities to managers, it also brought them more requirements, and an increasingly higher level of minimum accepted quality. The development and usage of new scheduling techniques became therefore imperative, so that better results could be achieved. In this research, four scheduling techniques well documented in the literature were studied: Early Start Schedule, Late Start Schedule, Constructive Heuristics and Branch-and-Bound. The main objective of this research project was to integrate these scheduling techniques into commercially available software, in order to help project managers deal with scheduling tasks in a more easy and controlled way. These scheduling techniques were integrated as an add-in, coded with C# programming language, for Microsoft Project 2010. After developing the add-in, an experimental phase was performed, in which the software was tested using some example projects. The initial hypothesis was confirmed by the results. For the tested projects the conclusion was that it was possible to get better results, concerning the project’s duration, using the studied techniques rather than the default scheduling technique used by Microsoft Project 2010. |
id |
RCAP_eefa45503f356e80503cdc8ae7a832da |
---|---|
oai_identifier_str |
oai:repositorium.sdum.uminho.pt:1822/36893 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
A computer application for scheduling in MS ProjectProject managementproject scheduling,Microsoft Project Add-inEngenharia e Tecnologia::Outras Engenharias e TecnologiasThe project management field has shown great progress over the last decades. With technology evolution, project managers as well as other managers have a faster and more efficient way to handle information. While progress brought more abilities to managers, it also brought them more requirements, and an increasingly higher level of minimum accepted quality. The development and usage of new scheduling techniques became therefore imperative, so that better results could be achieved. In this research, four scheduling techniques well documented in the literature were studied: Early Start Schedule, Late Start Schedule, Constructive Heuristics and Branch-and-Bound. The main objective of this research project was to integrate these scheduling techniques into commercially available software, in order to help project managers deal with scheduling tasks in a more easy and controlled way. These scheduling techniques were integrated as an add-in, coded with C# programming language, for Microsoft Project 2010. After developing the add-in, an experimental phase was performed, in which the software was tested using some example projects. The initial hypothesis was confirmed by the results. For the tested projects the conclusion was that it was possible to get better results, concerning the project’s duration, using the studied techniques rather than the default scheduling technique used by Microsoft Project 2010.Ethan Publishing CompanyUniversidade do MinhoTereso, Anabela PereiraGuedes, AndréCascais, António Carlos Pinheiro20142014-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://hdl.handle.net/1822/36893engTereso, A., Guedes, A. and Cascais, A. (2014) 'A Computer Application for Scheduling in MS Project', Computer Science, 1(5), 309-318.info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-07-21T12:07:38Zoai:repositorium.sdum.uminho.pt:1822/36893Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T18:58:39.773446Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
A computer application for scheduling in MS Project |
title |
A computer application for scheduling in MS Project |
spellingShingle |
A computer application for scheduling in MS Project Tereso, Anabela Pereira Project management project scheduling, Microsoft Project Add-in Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
title_short |
A computer application for scheduling in MS Project |
title_full |
A computer application for scheduling in MS Project |
title_fullStr |
A computer application for scheduling in MS Project |
title_full_unstemmed |
A computer application for scheduling in MS Project |
title_sort |
A computer application for scheduling in MS Project |
author |
Tereso, Anabela Pereira |
author_facet |
Tereso, Anabela Pereira Guedes, André Cascais, António Carlos Pinheiro |
author_role |
author |
author2 |
Guedes, André Cascais, António Carlos Pinheiro |
author2_role |
author author |
dc.contributor.none.fl_str_mv |
Universidade do Minho |
dc.contributor.author.fl_str_mv |
Tereso, Anabela Pereira Guedes, André Cascais, António Carlos Pinheiro |
dc.subject.por.fl_str_mv |
Project management project scheduling, Microsoft Project Add-in Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
topic |
Project management project scheduling, Microsoft Project Add-in Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
description |
The project management field has shown great progress over the last decades. With technology evolution, project managers as well as other managers have a faster and more efficient way to handle information. While progress brought more abilities to managers, it also brought them more requirements, and an increasingly higher level of minimum accepted quality. The development and usage of new scheduling techniques became therefore imperative, so that better results could be achieved. In this research, four scheduling techniques well documented in the literature were studied: Early Start Schedule, Late Start Schedule, Constructive Heuristics and Branch-and-Bound. The main objective of this research project was to integrate these scheduling techniques into commercially available software, in order to help project managers deal with scheduling tasks in a more easy and controlled way. These scheduling techniques were integrated as an add-in, coded with C# programming language, for Microsoft Project 2010. After developing the add-in, an experimental phase was performed, in which the software was tested using some example projects. The initial hypothesis was confirmed by the results. For the tested projects the conclusion was that it was possible to get better results, concerning the project’s duration, using the studied techniques rather than the default scheduling technique used by Microsoft Project 2010. |
publishDate |
2014 |
dc.date.none.fl_str_mv |
2014 2014-01-01T00:00:00Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://hdl.handle.net/1822/36893 |
url |
http://hdl.handle.net/1822/36893 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
Tereso, A., Guedes, A. and Cascais, A. (2014) 'A Computer Application for Scheduling in MS Project', Computer Science, 1(5), 309-318. |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Ethan Publishing Company |
publisher.none.fl_str_mv |
Ethan Publishing Company |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799132376997036032 |