Investment recovery period in electric motor of higher efficiency in pumping for irrigation

Detalhes bibliográficos
Autor(a) principal: Zocoler,João L.
Data de Publicação: 2013
Outros Autores: Leite,Maurício A., Saad,João C. C., Cruz,Raimundo L., Zocoler,João G.
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Engenharia Agrícola
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0100-69162013000200001
Resumo: In this study, it was adjusted a mathematical model to measure the effect of electric motor efficiency on pumping system costs for irrigation on the tariff structure of conventional electricity and green horo-seasonal , and also to calculate the recovery period of the invested capital in higher efficiency equipment. Then, it was applied to a center pivot irrigation system in two options of electric motor efficiency, 92,6% (standard line) and 94,3% (high efficiency line), and the acquisition cost of the first corresponded to 70% the of the second. The power of the electric motor was 100hp. The results showed that the model allowed us to evaluate if a high efficiency motor was economically viable compared to the standard motor in each tariff structure. The high efficiency motor was not viable in the two tariff structures. In the green horo-seasonal tariff, would only be viable if its efficiency was 4.46% higher than the standard motor. In the conventional tariff, it would only be viable if the efficiency overcame 2.71%.
id SBEA-1_e21b9f2596cd379787b33e2a299b606e
oai_identifier_str oai:scielo:S0100-69162013000200001
network_acronym_str SBEA-1
network_name_str Engenharia Agrícola
repository_id_str
spelling Investment recovery period in electric motor of higher efficiency in pumping for irrigationconventional tariffgreen horo-seasonal tariffhigh efficiencyIn this study, it was adjusted a mathematical model to measure the effect of electric motor efficiency on pumping system costs for irrigation on the tariff structure of conventional electricity and green horo-seasonal , and also to calculate the recovery period of the invested capital in higher efficiency equipment. Then, it was applied to a center pivot irrigation system in two options of electric motor efficiency, 92,6% (standard line) and 94,3% (high efficiency line), and the acquisition cost of the first corresponded to 70% the of the second. The power of the electric motor was 100hp. The results showed that the model allowed us to evaluate if a high efficiency motor was economically viable compared to the standard motor in each tariff structure. The high efficiency motor was not viable in the two tariff structures. In the green horo-seasonal tariff, would only be viable if its efficiency was 4.46% higher than the standard motor. In the conventional tariff, it would only be viable if the efficiency overcame 2.71%.Associação Brasileira de Engenharia Agrícola2013-04-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0100-69162013000200001Engenharia Agrícola v.33 n.2 2013reponame:Engenharia Agrícolainstname:Associação Brasileira de Engenharia Agrícola (SBEA)instacron:SBEA10.1590/S0100-69162013000200001info:eu-repo/semantics/openAccessZocoler,João L.Leite,Maurício A.Saad,João C. C.Cruz,Raimundo L.Zocoler,João G.eng2013-06-05T00:00:00Zoai:scielo:S0100-69162013000200001Revistahttp://www.engenhariaagricola.org.br/ORGhttps://old.scielo.br/oai/scielo-oai.phprevistasbea@sbea.org.br||sbea@sbea.org.br1809-44300100-6916opendoar:2013-06-05T00:00Engenharia Agrícola - Associação Brasileira de Engenharia Agrícola (SBEA)false
dc.title.none.fl_str_mv Investment recovery period in electric motor of higher efficiency in pumping for irrigation
title Investment recovery period in electric motor of higher efficiency in pumping for irrigation
spellingShingle Investment recovery period in electric motor of higher efficiency in pumping for irrigation
Zocoler,João L.
conventional tariff
green horo-seasonal tariff
high efficiency
title_short Investment recovery period in electric motor of higher efficiency in pumping for irrigation
title_full Investment recovery period in electric motor of higher efficiency in pumping for irrigation
title_fullStr Investment recovery period in electric motor of higher efficiency in pumping for irrigation
title_full_unstemmed Investment recovery period in electric motor of higher efficiency in pumping for irrigation
title_sort Investment recovery period in electric motor of higher efficiency in pumping for irrigation
author Zocoler,João L.
author_facet Zocoler,João L.
Leite,Maurício A.
Saad,João C. C.
Cruz,Raimundo L.
Zocoler,João G.
author_role author
author2 Leite,Maurício A.
Saad,João C. C.
Cruz,Raimundo L.
Zocoler,João G.
author2_role author
author
author
author
dc.contributor.author.fl_str_mv Zocoler,João L.
Leite,Maurício A.
Saad,João C. C.
Cruz,Raimundo L.
Zocoler,João G.
dc.subject.por.fl_str_mv conventional tariff
green horo-seasonal tariff
high efficiency
topic conventional tariff
green horo-seasonal tariff
high efficiency
description In this study, it was adjusted a mathematical model to measure the effect of electric motor efficiency on pumping system costs for irrigation on the tariff structure of conventional electricity and green horo-seasonal , and also to calculate the recovery period of the invested capital in higher efficiency equipment. Then, it was applied to a center pivot irrigation system in two options of electric motor efficiency, 92,6% (standard line) and 94,3% (high efficiency line), and the acquisition cost of the first corresponded to 70% the of the second. The power of the electric motor was 100hp. The results showed that the model allowed us to evaluate if a high efficiency motor was economically viable compared to the standard motor in each tariff structure. The high efficiency motor was not viable in the two tariff structures. In the green horo-seasonal tariff, would only be viable if its efficiency was 4.46% higher than the standard motor. In the conventional tariff, it would only be viable if the efficiency overcame 2.71%.
publishDate 2013
dc.date.none.fl_str_mv 2013-04-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0100-69162013000200001
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0100-69162013000200001
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/S0100-69162013000200001
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Associação Brasileira de Engenharia Agrícola
publisher.none.fl_str_mv Associação Brasileira de Engenharia Agrícola
dc.source.none.fl_str_mv Engenharia Agrícola v.33 n.2 2013
reponame:Engenharia Agrícola
instname:Associação Brasileira de Engenharia Agrícola (SBEA)
instacron:SBEA
instname_str Associação Brasileira de Engenharia Agrícola (SBEA)
instacron_str SBEA
institution SBEA
reponame_str Engenharia Agrícola
collection Engenharia Agrícola
repository.name.fl_str_mv Engenharia Agrícola - Associação Brasileira de Engenharia Agrícola (SBEA)
repository.mail.fl_str_mv revistasbea@sbea.org.br||sbea@sbea.org.br
_version_ 1752126271153766400