Resumo: Orientador: Prof. Dr. João Manoel Losada Moreira
id UFBC_174353d4395790df0dacdae030403340
oai_identifier_str oai:BDTD:109173
network_acronym_str UFBC
network_name_str Repositório Institucional da UFABC
repository_id_str
spelling Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamentoCUSTO ECONÔMICOESTRATÉGIA ORGANIZACIONALINTERDEPENDÊNCIA ECONÔMICACOSTSTRATEGYINTERDEPENDENCIESPROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA - UFABCOrientador: Prof. Dr. João Manoel Losada MoreiraTese (doutorado) - Universidade Federal do ABC. Programa de Pós-Graduação em Energia, 2017.O descomissionamento de uma planta nuclear de potência é a etapa que encerra seu ciclo de vida, permitindo sua retirada do controle regulatório de forma segura e a liberação de seu sitio para um novo uso. O processo deve ser executado de acordo com o estabelecido no plano final de descomissionamento. O processo pode ser organizado de diferentes maneiras, conforme a similaridade das diferentes e inúmeras tarefas envolvidas, razões econômicas e interesse das diferentes partes interessadas. Contudo, as abordagens encontradas na literatura pouco variam devido à grande complexidade do processo de descomissionamento e suas inúmeras tarefas. Por esta razão, uma abordagem simplificada, capaz de organizar o processo em um número reduzido de etapas e tarefas gerais, mostra-se vantajosa uma vez que isto torna o processo mais claro, mesmo às partes interessadas que não possuam conhecimentos técnicos específicos. A despeito da existência de diferentes ferramentas de gerenciamento de projetos, não se encontra na literatura uma ferramenta que reúna as principais características destas ferramentas junto com um modelo matemático capaz de estimar os custos e volume de cada classe dos rejeitos produzidos durante o processo de descomissionamento ou para um sítio com múltiplos reatores com plantas interdependentes. O presente trabalho tem como objetivo propor uma ferramenta de gestão que permita propor diferentes estratégias de descomissionamento para sítios com múltiplos reatores, qualquer que seja seu número ou tipo, e que possua um modelo matemático capaz de estimar o custo de descomissionamento com a precisão exigida por um orçamento. A funcionalidade da ferramenta de gestão será demonstrada por meio de um estudo de caso, considerando um sítio nuclear hipotético com 3 plantas, o qual possui características similares ao sítio nuclear brasileiro de Angra e suas 3 usinas. Este sítio foi escolhido como referência dadas suas características únicas no mundo em termos de cronograma e interdependências. A validação da ferramenta de gestão e seu modelo matemático foi conduzida comparando o custo estimado para uma planta, em cerca de R$2,56 bilhões (aproximadamente US$767,00 milhões), com valores encontrados na literatura. Uma análise de sensibilidade dos principais parâmetros do modelo foi realizada, permitindo avaliar a influência destes sobre o resultado. As interdependências entre as plantas nucleares foram consideradas por meio de diferentes estratégias de descomissionamento, entre os sistemas, fatores de custo e volumes de cada classe de rejeitos radioativos produzidos. Ao final são discutidos os possíveis cenários para um projeto de descomissionamento no futuro. Como principais conclusões, verificou-se que a extensão do planejamento tem pouca influência sobre o custo do projeto e que a alteração do estado final do sítio ou a disposição de rejeitos não radioativos no sítio permitem uma pequena redução de custo. Por outro lado, o uso de tecnologias remotas e automação para execução das tarefas de descontaminação e desmantelamento nas áreas contaminadas permitem reduzir significativamente o custo do projeto. Adicionalmente, verificou-se que as interdependências apresentam grande influência no cronograma das estratégias propostas e respectivos custos do projeto, mas que estas influem de forma desprezível o volume de rejeitos produzidos.TThe decommissioning of a nuclear power plant is the step that finishes its life cycle, allowing its safe release from regulatory control and a new use for the released site. This process must be executed according to the established final decommissioning plan. The process can be organized in different manners according to the similarity of the several tasks involved, economic reasons and interests of different stakeholders. However, the approaches found in literature do not vary much because of the high complexity of the decommissioning process and its numerous tasks. Due to this reason, a simplified approach, able to organize the process with a reduced number of phases and broad tasks is advantageous since it clarifies the process, even to those without specific technical knowledge in the subject. Despite the existence of several kinds of project management tools, it was not found in the literature one with such features, i.e., presenting a simplified mathematical model able to estimate costs and radioactive waste volumes generated during the decommissioning process, allowing to consider a site with multiple nuclear power plants, and possible interdependencies among them. The present work aims at developing a management tool that allows assessing different decommissioning strategies for a multiple power plant considering cost alternatives with a mathematical model with budget level accuracy. The management tool is verified in a case study considering a hypothetic nuclear power generation site with 3 plants, with characteristics similar to the Brazilian Angra nuclear power site. This choice was made because it presents unique features in terms of schedule of decommissioning and power plant interdependencies. The validation of the management tool and its mathematical model were carried out comparing a single plant decommissioning cost, of about R$2,56 billion (approximately US$767,00 millions), with the values reported in the literature. A sensibility study of the main model parameters was undertaken to estimate their influence on the results. The interdependencies among the nuclear power plants were considered regarding different decommissioning strategies, systems, decommissioning costs and volumes of each radioactive waste class. The final part of the work discusses the possible scenarios for the decommissioning of the site in the future. It was found that the extent of planning has little influence on the cost of the decommissioning project and that changes in the final state of the site of final disposal of non-radioactive wastes cause small cost reductions. On the other hand, the use of remote technologies and automation to carry out decontamination and dismantling tasks in contaminated areas can significantly reduce the cost of decommissioning. In addition, it was found that interdependencies have a great influence of the timeline of the proposed strategies and respective project costs, but have negligible influence on the volume of stored radioactive waste.Moreira, João Manoel LosadaFrajndlich, RobertoAndrade, Alexandre Acácio deRossi, Pedro Carlos RussoBenassi, Roseli FrederigiMonteiro, Deiglys Borges2017info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesisapplication/pdf407 f. : il.http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173&midiaext=75695http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173&midiaext=75696Cover: http://biblioteca.ufabc.edu.br/php/capa.php?obra=109173porreponame:Repositório Institucional da UFABCinstname:Universidade Federal do ABC (UFABC)instacron:UFABCinfo:eu-repo/semantics/openAccess2022-06-15T09:52:30Zoai:BDTD:109173Repositório InstitucionalPUBhttp://www.biblioteca.ufabc.edu.br/oai/oai.phpopendoar:2022-06-15T09:52:30Repositório Institucional da UFABC - Universidade Federal do ABC (UFABC)false
dc.title.none.fl_str_mv Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
title Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
spellingShingle Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
Monteiro, Deiglys Borges
CUSTO ECONÔMICO
ESTRATÉGIA ORGANIZACIONAL
INTERDEPENDÊNCIA ECONÔMICA
COST
STRATEGY
INTERDEPENDENCIES
PROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA - UFABC
title_short Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
title_full Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
title_fullStr Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
title_full_unstemmed Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
title_sort Descomissionamento de centrais nucleares no Brasil : proposta de uma ferramenta de gestão de custos de descomissionamento
author Monteiro, Deiglys Borges
author_facet Monteiro, Deiglys Borges
author_role author
dc.contributor.none.fl_str_mv Moreira, João Manoel Losada
Frajndlich, Roberto
Andrade, Alexandre Acácio de
Rossi, Pedro Carlos Russo
Benassi, Roseli Frederigi
dc.contributor.author.fl_str_mv Monteiro, Deiglys Borges
dc.subject.por.fl_str_mv CUSTO ECONÔMICO
ESTRATÉGIA ORGANIZACIONAL
INTERDEPENDÊNCIA ECONÔMICA
COST
STRATEGY
INTERDEPENDENCIES
PROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA - UFABC
topic CUSTO ECONÔMICO
ESTRATÉGIA ORGANIZACIONAL
INTERDEPENDÊNCIA ECONÔMICA
COST
STRATEGY
INTERDEPENDENCIES
PROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA - UFABC
description Orientador: Prof. Dr. João Manoel Losada Moreira
publishDate 2017
dc.date.none.fl_str_mv 2017
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/doctoralThesis
format doctoralThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173
url http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173&midiaext=75695
http://biblioteca.ufabc.edu.br/index.php?codigo_sophia=109173&midiaext=75696
Cover: http://biblioteca.ufabc.edu.br/php/capa.php?obra=109173
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
407 f. : il.
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFABC
instname:Universidade Federal do ABC (UFABC)
instacron:UFABC
instname_str Universidade Federal do ABC (UFABC)
instacron_str UFABC
institution UFABC
reponame_str Repositório Institucional da UFABC
collection Repositório Institucional da UFABC
repository.name.fl_str_mv Repositório Institucional da UFABC - Universidade Federal do ABC (UFABC)
repository.mail.fl_str_mv
_version_ 1813263944682307584