Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.

Detalhes bibliográficos
Autor(a) principal: Campos, Pedro Henrique Alves
Data de Publicação: 2018
Outros Autores: Cabral, Ivo Eyer, Arroyo Ortiz, Carlos Enrique, Morales, Nelson
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Institucional da UFOP
Texto Completo: http://www.repositorio.ufop.br/handle/123456789/11265
http://dx.doi.org/10.1590/0370-44672017710037
Resumo: Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.
id UFOP_02545a2b12cc983373b10d3214329c9d
oai_identifier_str oai:localhost:123456789/11265
network_acronym_str UFOP
network_name_str Repositório Institucional da UFOP
repository_id_str 3233
spelling Campos, Pedro Henrique AlvesCabral, Ivo EyerArroyo Ortiz, Carlos EnriqueMorales, Nelson2019-05-10T12:42:46Z2019-05-10T12:42:46Z2018CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019.1807-0353http://www.repositorio.ufop.br/handle/123456789/11265http://dx.doi.org/10.1590/0370-44672017710037Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.A REM - International Engineering Journal - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Licença concedida mediante preenchimento de formulário online em 12 set. 2013.info:eu-repo/semantics/openAccessProduction schedulingComparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleengreponame:Repositório Institucional da UFOPinstname:Universidade Federal de Ouro Preto (UFOP)instacron:UFOPLICENSElicense.txtlicense.txttext/plain; charset=utf-8924http://www.repositorio.ufop.br/bitstream/123456789/11265/2/license.txt62604f8d955274beb56c80ce1ee5dcaeMD52ORIGINALARTIGO_ComparisonApplicationConventional.pdfARTIGO_ComparisonApplicationConventional.pdfapplication/pdf1360317http://www.repositorio.ufop.br/bitstream/123456789/11265/1/ARTIGO_ComparisonApplicationConventional.pdff8f939a50d34f398bfdd04d17d34cd52MD51123456789/112652019-05-10 08:43:13.327oai:localhost: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ório InstitucionalPUBhttp://www.repositorio.ufop.br/oai/requestrepositorio@ufop.edu.bropendoar:32332019-05-10T12:43:13Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP)false
dc.title.pt_BR.fl_str_mv Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
title Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
spellingShingle Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
Campos, Pedro Henrique Alves
Production scheduling
title_short Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
title_full Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
title_fullStr Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
title_full_unstemmed Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
title_sort Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
author Campos, Pedro Henrique Alves
author_facet Campos, Pedro Henrique Alves
Cabral, Ivo Eyer
Arroyo Ortiz, Carlos Enrique
Morales, Nelson
author_role author
author2 Cabral, Ivo Eyer
Arroyo Ortiz, Carlos Enrique
Morales, Nelson
author2_role author
author
author
dc.contributor.author.fl_str_mv Campos, Pedro Henrique Alves
Cabral, Ivo Eyer
Arroyo Ortiz, Carlos Enrique
Morales, Nelson
dc.subject.por.fl_str_mv Production scheduling
topic Production scheduling
description Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.
publishDate 2018
dc.date.issued.fl_str_mv 2018
dc.date.accessioned.fl_str_mv 2019-05-10T12:42:46Z
dc.date.available.fl_str_mv 2019-05-10T12:42:46Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.citation.fl_str_mv CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019.
dc.identifier.uri.fl_str_mv http://www.repositorio.ufop.br/handle/123456789/11265
dc.identifier.issn.none.fl_str_mv 1807-0353
dc.identifier.doi.pt_BR.fl_str_mv http://dx.doi.org/10.1590/0370-44672017710037
identifier_str_mv CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019.
1807-0353
url http://www.repositorio.ufop.br/handle/123456789/11265
http://dx.doi.org/10.1590/0370-44672017710037
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFOP
instname:Universidade Federal de Ouro Preto (UFOP)
instacron:UFOP
instname_str Universidade Federal de Ouro Preto (UFOP)
instacron_str UFOP
institution UFOP
reponame_str Repositório Institucional da UFOP
collection Repositório Institucional da UFOP
bitstream.url.fl_str_mv http://www.repositorio.ufop.br/bitstream/123456789/11265/2/license.txt
http://www.repositorio.ufop.br/bitstream/123456789/11265/1/ARTIGO_ComparisonApplicationConventional.pdf
bitstream.checksum.fl_str_mv 62604f8d955274beb56c80ce1ee5dcae
f8f939a50d34f398bfdd04d17d34cd52
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP)
repository.mail.fl_str_mv repositorio@ufop.edu.br
_version_ 1801685742767833088