Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
Autor(a) principal: | |
---|---|
Data de Publicação: | 2018 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UFOP |
Texto Completo: | http://www.repositorio.ufop.br/handle/123456789/11265 http://dx.doi.org/10.1590/0370-44672017710037 |
Resumo: | Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software. |
id |
UFOP_02545a2b12cc983373b10d3214329c9d |
---|---|
oai_identifier_str |
oai:localhost:123456789/11265 |
network_acronym_str |
UFOP |
network_name_str |
Repositório Institucional da UFOP |
repository_id_str |
3233 |
spelling |
Campos, Pedro Henrique AlvesCabral, Ivo EyerArroyo Ortiz, Carlos EnriqueMorales, Nelson2019-05-10T12:42:46Z2019-05-10T12:42:46Z2018CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019.1807-0353http://www.repositorio.ufop.br/handle/123456789/11265http://dx.doi.org/10.1590/0370-44672017710037Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.A REM - International Engineering Journal - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Licença concedida mediante preenchimento de formulário online em 12 set. 2013.info:eu-repo/semantics/openAccessProduction schedulingComparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleengreponame:Repositório Institucional da UFOPinstname:Universidade Federal de Ouro Preto (UFOP)instacron:UFOPLICENSElicense.txtlicense.txttext/plain; charset=utf-8924http://www.repositorio.ufop.br/bitstream/123456789/11265/2/license.txt62604f8d955274beb56c80ce1ee5dcaeMD52ORIGINALARTIGO_ComparisonApplicationConventional.pdfARTIGO_ComparisonApplicationConventional.pdfapplication/pdf1360317http://www.repositorio.ufop.br/bitstream/123456789/11265/1/ARTIGO_ComparisonApplicationConventional.pdff8f939a50d34f398bfdd04d17d34cd52MD51123456789/112652019-05-10 08:43:13.327oai:localhost: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ório InstitucionalPUBhttp://www.repositorio.ufop.br/oai/requestrepositorio@ufop.edu.bropendoar:32332019-05-10T12:43:13Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP)false |
dc.title.pt_BR.fl_str_mv |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
title |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
spellingShingle |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. Campos, Pedro Henrique Alves Production scheduling |
title_short |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
title_full |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
title_fullStr |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
title_full_unstemmed |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
title_sort |
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. |
author |
Campos, Pedro Henrique Alves |
author_facet |
Campos, Pedro Henrique Alves Cabral, Ivo Eyer Arroyo Ortiz, Carlos Enrique Morales, Nelson |
author_role |
author |
author2 |
Cabral, Ivo Eyer Arroyo Ortiz, Carlos Enrique Morales, Nelson |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Campos, Pedro Henrique Alves Cabral, Ivo Eyer Arroyo Ortiz, Carlos Enrique Morales, Nelson |
dc.subject.por.fl_str_mv |
Production scheduling |
topic |
Production scheduling |
description |
Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software. |
publishDate |
2018 |
dc.date.issued.fl_str_mv |
2018 |
dc.date.accessioned.fl_str_mv |
2019-05-10T12:42:46Z |
dc.date.available.fl_str_mv |
2019-05-10T12:42:46Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.citation.fl_str_mv |
CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019. |
dc.identifier.uri.fl_str_mv |
http://www.repositorio.ufop.br/handle/123456789/11265 |
dc.identifier.issn.none.fl_str_mv |
1807-0353 |
dc.identifier.doi.pt_BR.fl_str_mv |
http://dx.doi.org/10.1590/0370-44672017710037 |
identifier_str_mv |
CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019. 1807-0353 |
url |
http://www.repositorio.ufop.br/handle/123456789/11265 http://dx.doi.org/10.1590/0370-44672017710037 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da UFOP instname:Universidade Federal de Ouro Preto (UFOP) instacron:UFOP |
instname_str |
Universidade Federal de Ouro Preto (UFOP) |
instacron_str |
UFOP |
institution |
UFOP |
reponame_str |
Repositório Institucional da UFOP |
collection |
Repositório Institucional da UFOP |
bitstream.url.fl_str_mv |
http://www.repositorio.ufop.br/bitstream/123456789/11265/2/license.txt http://www.repositorio.ufop.br/bitstream/123456789/11265/1/ARTIGO_ComparisonApplicationConventional.pdf |
bitstream.checksum.fl_str_mv |
62604f8d955274beb56c80ce1ee5dcae f8f939a50d34f398bfdd04d17d34cd52 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 |
repository.name.fl_str_mv |
Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP) |
repository.mail.fl_str_mv |
repositorio@ufop.edu.br |
_version_ |
1801685742767833088 |