Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study

Detalhes bibliográficos
Autor(a) principal: de Oliveira, Jaqueline Mata
Data de Publicação: 2023
Outros Autores: Gorga Lago, Eliane Maria
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista de Engenharia e Pesquisa Aplicada
Texto Completo: http://revistas.poli.br/index.php/repa/article/view/2484
Resumo: The application of the Preliminary Risk Analysis - APR and the Hazard Rating Number-HRN, a necessary tool for risk management, in gas infrastructure works, is still neglected by the companies that perform this type of work. In this sense, the objective of this study is to carry out a risk analysis in a work of execution of a natural gas network developed in the municipality of Paulista, state of Pernambuco. The methodology consisted of identifying risks, evaluating and proposing control measures through the application of the APR and the HRN. With the application of the method, the risks, their causes and consequences were identified, which were later analyzed regarding their degrees of severity, probability of occurrence of the owner, frequency of exposure and number of people exposed. Through the results obtained, it is verified that all the mechanical and ergonomic riches were classified as "high", and among these, the ones that presented the highest values ​​are those of trampling and explosion, because they have greater numbers of exposed people and a high degree of exposure. of severity. Finally, it was noticed that this type of work is subject to work accidents that can be circumvented by adopting relatively simple measures, such as signaling work, training and using PPE. In this context, the application of such tools proved to be important in the risk management process, and if, in fact, it is applied correctly, it can contribute to reducing the number of work accidents in gas network works.
id UFPE-2_9136f3bb19b9ffc805668e0d450037b8
oai_identifier_str oai:ojs.poli.br:article/2484
network_acronym_str UFPE-2
network_name_str Revista de Engenharia e Pesquisa Aplicada
repository_id_str
spelling Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case StudyGerenciamento de Risco de Acidente do Trabalho na Execução de Rede Externa de Gás Natural – Estudo de CasoThe application of the Preliminary Risk Analysis - APR and the Hazard Rating Number-HRN, a necessary tool for risk management, in gas infrastructure works, is still neglected by the companies that perform this type of work. In this sense, the objective of this study is to carry out a risk analysis in a work of execution of a natural gas network developed in the municipality of Paulista, state of Pernambuco. The methodology consisted of identifying risks, evaluating and proposing control measures through the application of the APR and the HRN. With the application of the method, the risks, their causes and consequences were identified, which were later analyzed regarding their degrees of severity, probability of occurrence of the owner, frequency of exposure and number of people exposed. Through the results obtained, it is verified that all the mechanical and ergonomic riches were classified as "high", and among these, the ones that presented the highest values ​​are those of trampling and explosion, because they have greater numbers of exposed people and a high degree of exposure. of severity. Finally, it was noticed that this type of work is subject to work accidents that can be circumvented by adopting relatively simple measures, such as signaling work, training and using PPE. In this context, the application of such tools proved to be important in the risk management process, and if, in fact, it is applied correctly, it can contribute to reducing the number of work accidents in gas network works.A aplicação da Análise Preliminar de Risco - APR e do Hazard Rating Number-HRN, ferramenta necessária para o gerenciamento de riscos, em obras de infraestrutura de gás, ainda é negligenciada por parte das empresas que executam este tipo de obra. Neste sentido, o objetivo deste estudo visa realizar a análise de riscos em uma obra de execução de rede de gás natural desenvolvida no município de Paulista, estado de Pernambuco. A metodologia consistiu na identificação dos riscos, avaliação e proposta de medidas de controle através da aplicação da APR e do HRN. Com a aplicação do método, foram identificados os riscos, suas causas e consequências, os quais foram, posteriormente, analisados quanto aos seus graus de severidade, probabilidade de ocorrência do dono, frequência de exposição e número de pessoas expostas. Através dos resultados obtidos, verifica-se que todos os ricos mecânicos e ergonômico foram classificados como “alto”, e entres estes, os que apresentaram maiores valores, estão os de atropelamento e de explosão, por possuírem maiores números de pessoas expostas e alto grau de severidade. Por fim, percebeu-se que esse tipo de obra está sujeito a acidentes de trabalho que podem ser contornados a partir da adoção de medidas relativamente simples, tais como a sinalização de obra, treinamentos e usos de EPI’s. Neste contexto, a aplicação de tais ferramentas provaram ser importante no processo de gerenciamento de riscos, e se, de fato, for aplicada de forma correta, pode contribuir na diminuição do número de acidentes de trabalho em obras de rede de gás.Escola Politécnica de Pernambuco2023-05-15info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://revistas.poli.br/index.php/repa/article/view/248410.25286/repa.v8i2.2484Journal of Engineering and Applied Research; Vol 8 No 2 (2023): Revista de Engenharia e Pesquisa Aplicada; 50-64Revista de Engenharia e Pesquisa Aplicada; v. 8 n. 2 (2023): Revista de Engenharia e Pesquisa Aplicada; 50-642525-425110.25286/repa.v8i2reponame:Revista de Engenharia e Pesquisa Aplicadainstname:Universidade Federal de Pernambuco (UFPE)instacron:UFPEporhttp://revistas.poli.br/index.php/repa/article/view/2484/881http://revistas.poli.br/index.php/repa/article/view/2484/882Copyright (c) 2023 Jaqueline Mata de Oliveira, Eliane Maria Gorga Lagohttp://creativecommons.org/licenses/by-nc/4.0info:eu-repo/semantics/openAccessde Oliveira, Jaqueline MataGorga Lago, Eliane Maria2023-06-12T13:25:36Zoai:ojs.poli.br:article/2484Revistahttp://revistas.poli.br/index.php/repaONGhttp://revistas.poli.br/index.php/repa/oai||repa@poli.br2525-42512525-4251opendoar:2023-06-12T13:25:36Revista de Engenharia e Pesquisa Aplicada - Universidade Federal de Pernambuco (UFPE)false
dc.title.none.fl_str_mv Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
Gerenciamento de Risco de Acidente do Trabalho na Execução de Rede Externa de Gás Natural – Estudo de Caso
title Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
spellingShingle Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
de Oliveira, Jaqueline Mata
title_short Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
title_full Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
title_fullStr Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
title_full_unstemmed Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
title_sort Preliminary Risk Analysis for Execution Activity of External Natural Gas Network – Case Study
author de Oliveira, Jaqueline Mata
author_facet de Oliveira, Jaqueline Mata
Gorga Lago, Eliane Maria
author_role author
author2 Gorga Lago, Eliane Maria
author2_role author
dc.contributor.author.fl_str_mv de Oliveira, Jaqueline Mata
Gorga Lago, Eliane Maria
description The application of the Preliminary Risk Analysis - APR and the Hazard Rating Number-HRN, a necessary tool for risk management, in gas infrastructure works, is still neglected by the companies that perform this type of work. In this sense, the objective of this study is to carry out a risk analysis in a work of execution of a natural gas network developed in the municipality of Paulista, state of Pernambuco. The methodology consisted of identifying risks, evaluating and proposing control measures through the application of the APR and the HRN. With the application of the method, the risks, their causes and consequences were identified, which were later analyzed regarding their degrees of severity, probability of occurrence of the owner, frequency of exposure and number of people exposed. Through the results obtained, it is verified that all the mechanical and ergonomic riches were classified as "high", and among these, the ones that presented the highest values ​​are those of trampling and explosion, because they have greater numbers of exposed people and a high degree of exposure. of severity. Finally, it was noticed that this type of work is subject to work accidents that can be circumvented by adopting relatively simple measures, such as signaling work, training and using PPE. In this context, the application of such tools proved to be important in the risk management process, and if, in fact, it is applied correctly, it can contribute to reducing the number of work accidents in gas network works.
publishDate 2023
dc.date.none.fl_str_mv 2023-05-15
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://revistas.poli.br/index.php/repa/article/view/2484
10.25286/repa.v8i2.2484
url http://revistas.poli.br/index.php/repa/article/view/2484
identifier_str_mv 10.25286/repa.v8i2.2484
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv http://revistas.poli.br/index.php/repa/article/view/2484/881
http://revistas.poli.br/index.php/repa/article/view/2484/882
dc.rights.driver.fl_str_mv Copyright (c) 2023 Jaqueline Mata de Oliveira, Eliane Maria Gorga Lago
http://creativecommons.org/licenses/by-nc/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2023 Jaqueline Mata de Oliveira, Eliane Maria Gorga Lago
http://creativecommons.org/licenses/by-nc/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
text/html
dc.publisher.none.fl_str_mv Escola Politécnica de Pernambuco
publisher.none.fl_str_mv Escola Politécnica de Pernambuco
dc.source.none.fl_str_mv Journal of Engineering and Applied Research; Vol 8 No 2 (2023): Revista de Engenharia e Pesquisa Aplicada; 50-64
Revista de Engenharia e Pesquisa Aplicada; v. 8 n. 2 (2023): Revista de Engenharia e Pesquisa Aplicada; 50-64
2525-4251
10.25286/repa.v8i2
reponame:Revista de Engenharia e Pesquisa Aplicada
instname:Universidade Federal de Pernambuco (UFPE)
instacron:UFPE
instname_str Universidade Federal de Pernambuco (UFPE)
instacron_str UFPE
institution UFPE
reponame_str Revista de Engenharia e Pesquisa Aplicada
collection Revista de Engenharia e Pesquisa Aplicada
repository.name.fl_str_mv Revista de Engenharia e Pesquisa Aplicada - Universidade Federal de Pernambuco (UFPE)
repository.mail.fl_str_mv ||repa@poli.br
_version_ 1798036000489865216