Deficiências no planejamento e execução de obras no campus central da UFRN
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Tipo de documento: | Trabalho de conclusão de curso |
Idioma: | por |
Título da fonte: | Repositório Institucional da UFRN |
Texto Completo: | https://repositorio.ufrn.br/handle/123456789/40812 |
Resumo: | This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified. |
id |
UFRN_faffefb045875bd5de4627c3568cbd39 |
---|---|
oai_identifier_str |
oai:https://repositorio.ufrn.br:123456789/40812 |
network_acronym_str |
UFRN |
network_name_str |
Repositório Institucional da UFRN |
repository_id_str |
|
spelling |
Silva, Renan RodriguesMedeiros, Fernanda Karolline deMedeiros, Fernanda Karolline deSilva, Moacir Guilhermino daSiqueira Filho, Elton Cortês RochaSilva, Jaquelígia Brito da2016-06-20T13:03:41Z2021-09-29T14:40:28Z2016-06-20T13:03:41Z2021-09-29T14:40:28Z2016-06-012011062453SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016.https://repositorio.ufrn.br/handle/123456789/40812This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified.O presente trabalho visa aprofundar a temática sobre as deficiências em obras públicas, com foco em empreendimentos realizados no campus central da Universidade Federal do Rio Grande do Norte, UFRN. Em virtude de problemas relacionados a contratos públicos, como superfaturamento e erros de projetos, expostos cotidianamente à sociedade, é necessário justificar que não só a empresa prestadora de serviços tem responsabilidade sobre esses problemas, como também os órgãos gerenciadores contribuem. Nesse sentido, torna-se necessário demonstrar como a falta de planejamento é capaz de prejudicar a realização de um empreendimento público, principalmente antes do início dos serviços. Para isso, foram estudadas três vertentes principais: deficiências de projetos, falhas em orçamentos e a dificuldade de se entregar uma obra no prazo. Ao final do estudo, percebeu-se que as obras analisadas apresentam diversas falhas nos orçamentos, principalmente no que se refere a quantitativos e ausência de serviços. Nenhuma das obras analisadas conseguiu ser entregue dentro do prazo estipulado, onde todas tiveram prorrogação. A incompatibilidade entre projetos foi a principal causa das deficiências presentes nos projetos das obras verificadas.Universidade Federal do Rio Grande do NorteUFRNBrasilEngenharia CivilAn error occurred getting the license - uri.info:eu-repo/semantics/openAccessobras públicas, planejamento, projetos, orçamento, prazo.publics works, planning, projects, budget, period.Deficiências no planejamento e execução de obras no campus central da UFRNinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisporreponame:Repositório Institucional da UFRNinstname:Universidade Federal do Rio Grande do Norte (UFRN)instacron:UFRNTEXTTCC_Renan Rodrigues Silva_Final.pdf.txtExtracted texttext/plain96953https://repositorio.ufrn.br/bitstream/123456789/40812/1/TCC_Renan%20Rodrigues%20Silva_Final.pdf.txtaffaba42f66f29cfd0b5cd938154ebd0MD51LICENSElicense.txttext/plain756https://repositorio.ufrn.br/bitstream/123456789/40812/2/license.txta80a9cda2756d355b388cc443c3d8a43MD52ORIGINALTCC_Renan Rodrigues Silva_Final.pdfapplication/pdf1620250https://repositorio.ufrn.br/bitstream/123456789/40812/3/TCC_Renan%20Rodrigues%20Silva_Final.pdf2ead0fdc537a83115e657323e5b0a9e8MD53123456789/408122021-09-29 11:40:28.923oai:https://repositorio.ufrn.br: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ório de PublicaçõesPUBhttp://repositorio.ufrn.br/oai/opendoar:2021-09-29T14:40:28Repositório Institucional da UFRN - Universidade Federal do Rio Grande do Norte (UFRN)false |
dc.title.pr_BR.fl_str_mv |
Deficiências no planejamento e execução de obras no campus central da UFRN |
title |
Deficiências no planejamento e execução de obras no campus central da UFRN |
spellingShingle |
Deficiências no planejamento e execução de obras no campus central da UFRN Silva, Renan Rodrigues obras públicas, planejamento, projetos, orçamento, prazo. publics works, planning, projects, budget, period. |
title_short |
Deficiências no planejamento e execução de obras no campus central da UFRN |
title_full |
Deficiências no planejamento e execução de obras no campus central da UFRN |
title_fullStr |
Deficiências no planejamento e execução de obras no campus central da UFRN |
title_full_unstemmed |
Deficiências no planejamento e execução de obras no campus central da UFRN |
title_sort |
Deficiências no planejamento e execução de obras no campus central da UFRN |
author |
Silva, Renan Rodrigues |
author_facet |
Silva, Renan Rodrigues |
author_role |
author |
dc.contributor.referees1.none.fl_str_mv |
Medeiros, Fernanda Karolline de |
dc.contributor.referees2.none.fl_str_mv |
Silva, Moacir Guilhermino da |
dc.contributor.referees3.none.fl_str_mv |
Siqueira Filho, Elton Cortês Rocha |
dc.contributor.author.fl_str_mv |
Silva, Renan Rodrigues |
dc.contributor.advisor-co1.fl_str_mv |
Medeiros, Fernanda Karolline de |
dc.contributor.advisor1.fl_str_mv |
Silva, Jaquelígia Brito da |
contributor_str_mv |
Medeiros, Fernanda Karolline de Silva, Jaquelígia Brito da |
dc.subject.pr_BR.fl_str_mv |
obras públicas, planejamento, projetos, orçamento, prazo. publics works, planning, projects, budget, period. |
topic |
obras públicas, planejamento, projetos, orçamento, prazo. publics works, planning, projects, budget, period. |
description |
This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified. |
publishDate |
2016 |
dc.date.accessioned.fl_str_mv |
2016-06-20T13:03:41Z 2021-09-29T14:40:28Z |
dc.date.available.fl_str_mv |
2016-06-20T13:03:41Z 2021-09-29T14:40:28Z |
dc.date.issued.fl_str_mv |
2016-06-01 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
format |
bachelorThesis |
status_str |
publishedVersion |
dc.identifier.pr_BR.fl_str_mv |
2011062453 |
dc.identifier.citation.fl_str_mv |
SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016. |
dc.identifier.uri.fl_str_mv |
https://repositorio.ufrn.br/handle/123456789/40812 |
identifier_str_mv |
2011062453 SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016. |
url |
https://repositorio.ufrn.br/handle/123456789/40812 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.rights.driver.fl_str_mv |
An error occurred getting the license - uri. info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
An error occurred getting the license - uri. |
eu_rights_str_mv |
openAccess |
dc.publisher.none.fl_str_mv |
Universidade Federal do Rio Grande do Norte |
dc.publisher.initials.fl_str_mv |
UFRN |
dc.publisher.country.fl_str_mv |
Brasil |
dc.publisher.department.fl_str_mv |
Engenharia Civil |
publisher.none.fl_str_mv |
Universidade Federal do Rio Grande do Norte |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da UFRN instname:Universidade Federal do Rio Grande do Norte (UFRN) instacron:UFRN |
instname_str |
Universidade Federal do Rio Grande do Norte (UFRN) |
instacron_str |
UFRN |
institution |
UFRN |
reponame_str |
Repositório Institucional da UFRN |
collection |
Repositório Institucional da UFRN |
bitstream.url.fl_str_mv |
https://repositorio.ufrn.br/bitstream/123456789/40812/1/TCC_Renan%20Rodrigues%20Silva_Final.pdf.txt https://repositorio.ufrn.br/bitstream/123456789/40812/2/license.txt https://repositorio.ufrn.br/bitstream/123456789/40812/3/TCC_Renan%20Rodrigues%20Silva_Final.pdf |
bitstream.checksum.fl_str_mv |
affaba42f66f29cfd0b5cd938154ebd0 a80a9cda2756d355b388cc443c3d8a43 2ead0fdc537a83115e657323e5b0a9e8 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 |
repository.name.fl_str_mv |
Repositório Institucional da UFRN - Universidade Federal do Rio Grande do Norte (UFRN) |
repository.mail.fl_str_mv |
|
_version_ |
1814832881114021888 |