Deficiências no planejamento e execução de obras no campus central da UFRN

Detalhes bibliográficos
Autor(a) principal: Silva, Renan Rodrigues
Data de Publicação: 2016
Tipo de documento: Trabalho de conclusão de curso
Idioma: por
Título da fonte: Repositório Institucional da UFRN
Texto Completo: https://repositorio.ufrn.br/handle/123456789/40812
Resumo: This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified.
id UFRN_faffefb045875bd5de4627c3568cbd39
oai_identifier_str oai:https://repositorio.ufrn.br:123456789/40812
network_acronym_str UFRN
network_name_str Repositório Institucional da UFRN
repository_id_str
spelling Silva, Renan RodriguesMedeiros, Fernanda Karolline deMedeiros, Fernanda Karolline deSilva, Moacir Guilhermino daSiqueira Filho, Elton Cortês RochaSilva, Jaquelígia Brito da2016-06-20T13:03:41Z2021-09-29T14:40:28Z2016-06-20T13:03:41Z2021-09-29T14:40:28Z2016-06-012011062453SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016.https://repositorio.ufrn.br/handle/123456789/40812This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified.O presente trabalho visa aprofundar a temática sobre as deficiências em obras públicas, com foco em empreendimentos realizados no campus central da Universidade Federal do Rio Grande do Norte, UFRN. Em virtude de problemas relacionados a contratos públicos, como superfaturamento e erros de projetos, expostos cotidianamente à sociedade, é necessário justificar que não só a empresa prestadora de serviços tem responsabilidade sobre esses problemas, como também os órgãos gerenciadores contribuem. Nesse sentido, torna-se necessário demonstrar como a falta de planejamento é capaz de prejudicar a realização de um empreendimento público, principalmente antes do início dos serviços. Para isso, foram estudadas três vertentes principais: deficiências de projetos, falhas em orçamentos e a dificuldade de se entregar uma obra no prazo. Ao final do estudo, percebeu-se que as obras analisadas apresentam diversas falhas nos orçamentos, principalmente no que se refere a quantitativos e ausência de serviços. Nenhuma das obras analisadas conseguiu ser entregue dentro do prazo estipulado, onde todas tiveram prorrogação. A incompatibilidade entre projetos foi a principal causa das deficiências presentes nos projetos das obras verificadas.Universidade Federal do Rio Grande do NorteUFRNBrasilEngenharia CivilAn error occurred getting the license - uri.info:eu-repo/semantics/openAccessobras públicas, planejamento, projetos, orçamento, prazo.publics works, planning, projects, budget, period.Deficiências no planejamento e execução de obras no campus central da UFRNinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisporreponame:Repositório Institucional da UFRNinstname:Universidade Federal do Rio Grande do Norte (UFRN)instacron:UFRNTEXTTCC_Renan Rodrigues Silva_Final.pdf.txtExtracted texttext/plain96953https://repositorio.ufrn.br/bitstream/123456789/40812/1/TCC_Renan%20Rodrigues%20Silva_Final.pdf.txtaffaba42f66f29cfd0b5cd938154ebd0MD51LICENSElicense.txttext/plain756https://repositorio.ufrn.br/bitstream/123456789/40812/2/license.txta80a9cda2756d355b388cc443c3d8a43MD52ORIGINALTCC_Renan Rodrigues Silva_Final.pdfapplication/pdf1620250https://repositorio.ufrn.br/bitstream/123456789/40812/3/TCC_Renan%20Rodrigues%20Silva_Final.pdf2ead0fdc537a83115e657323e5b0a9e8MD53123456789/408122021-09-29 11:40:28.923oai:https://repositorio.ufrn.br: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ório de PublicaçõesPUBhttp://repositorio.ufrn.br/oai/opendoar:2021-09-29T14:40:28Repositório Institucional da UFRN - Universidade Federal do Rio Grande do Norte (UFRN)false
dc.title.pr_BR.fl_str_mv Deficiências no planejamento e execução de obras no campus central da UFRN
title Deficiências no planejamento e execução de obras no campus central da UFRN
spellingShingle Deficiências no planejamento e execução de obras no campus central da UFRN
Silva, Renan Rodrigues
obras públicas, planejamento, projetos, orçamento, prazo.
publics works, planning, projects, budget, period.
title_short Deficiências no planejamento e execução de obras no campus central da UFRN
title_full Deficiências no planejamento e execução de obras no campus central da UFRN
title_fullStr Deficiências no planejamento e execução de obras no campus central da UFRN
title_full_unstemmed Deficiências no planejamento e execução de obras no campus central da UFRN
title_sort Deficiências no planejamento e execução de obras no campus central da UFRN
author Silva, Renan Rodrigues
author_facet Silva, Renan Rodrigues
author_role author
dc.contributor.referees1.none.fl_str_mv Medeiros, Fernanda Karolline de
dc.contributor.referees2.none.fl_str_mv Silva, Moacir Guilhermino da
dc.contributor.referees3.none.fl_str_mv Siqueira Filho, Elton Cortês Rocha
dc.contributor.author.fl_str_mv Silva, Renan Rodrigues
dc.contributor.advisor-co1.fl_str_mv Medeiros, Fernanda Karolline de
dc.contributor.advisor1.fl_str_mv Silva, Jaquelígia Brito da
contributor_str_mv Medeiros, Fernanda Karolline de
Silva, Jaquelígia Brito da
dc.subject.pr_BR.fl_str_mv obras públicas, planejamento, projetos, orçamento, prazo.
publics works, planning, projects, budget, period.
topic obras públicas, planejamento, projetos, orçamento, prazo.
publics works, planning, projects, budget, period.
description This work aims to deepen the theme of the deficiencies in public works, with a focus on developments carried out in the central campus of the Federal University of Rio Grande do Norte, UFRN. Because of problems related to public procurement, such as overbilling and project errors, exposed daily to society, it is necessary to justify not only the service company has responsibility for these problems, as well as the managers contribute organs. In this sense, it is necessary to demonstrate how the lack of planning is able to prejudice the achievement of a public enterprise, especially before the start of services. For this, we studied three main areas: design flaws, failures in budgets and the difficulty of delivering a project on time. At the end of the study, it was realized that the works have analyzed several flaws in budgets, especially with regard to quantitative and lack of services. None of the analyzed works could be delivered within the stipulated time, where all had extension. Incompatibility between projects was the main cause of the deficiencies present in the projects of the works verified.
publishDate 2016
dc.date.accessioned.fl_str_mv 2016-06-20T13:03:41Z
2021-09-29T14:40:28Z
dc.date.available.fl_str_mv 2016-06-20T13:03:41Z
2021-09-29T14:40:28Z
dc.date.issued.fl_str_mv 2016-06-01
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
status_str publishedVersion
dc.identifier.pr_BR.fl_str_mv 2011062453
dc.identifier.citation.fl_str_mv SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016.
dc.identifier.uri.fl_str_mv https://repositorio.ufrn.br/handle/123456789/40812
identifier_str_mv 2011062453
SILVA, Renan Rodrigues. Deficiências no planejamento e execução de obras no campus central da UFRN. 2016. 57f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Departamento de Engenharia Civil, Universidade Federal do Rio Grande do Norte, Natal, 2016.
url https://repositorio.ufrn.br/handle/123456789/40812
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv An error occurred getting the license - uri.
info:eu-repo/semantics/openAccess
rights_invalid_str_mv An error occurred getting the license - uri.
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Universidade Federal do Rio Grande do Norte
dc.publisher.initials.fl_str_mv UFRN
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Engenharia Civil
publisher.none.fl_str_mv Universidade Federal do Rio Grande do Norte
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFRN
instname:Universidade Federal do Rio Grande do Norte (UFRN)
instacron:UFRN
instname_str Universidade Federal do Rio Grande do Norte (UFRN)
instacron_str UFRN
institution UFRN
reponame_str Repositório Institucional da UFRN
collection Repositório Institucional da UFRN
bitstream.url.fl_str_mv https://repositorio.ufrn.br/bitstream/123456789/40812/1/TCC_Renan%20Rodrigues%20Silva_Final.pdf.txt
https://repositorio.ufrn.br/bitstream/123456789/40812/2/license.txt
https://repositorio.ufrn.br/bitstream/123456789/40812/3/TCC_Renan%20Rodrigues%20Silva_Final.pdf
bitstream.checksum.fl_str_mv affaba42f66f29cfd0b5cd938154ebd0
a80a9cda2756d355b388cc443c3d8a43
2ead0fdc537a83115e657323e5b0a9e8
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFRN - Universidade Federal do Rio Grande do Norte (UFRN)
repository.mail.fl_str_mv
_version_ 1814832881114021888