Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos

Detalhes bibliográficos
Autor(a) principal: Weber, Lucas Eduardo
Data de Publicação: 2020
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Repositório Institucional da UFS
Texto Completo: http://ri.ufs.br/jspui/handle/riufs/13631
Resumo: Public works aim to meet social demand and play an important role in the social and economic development of a region. However, they are constantly characterized by their inefficiency and recurring delays in delivering the project. In this way, this research investigates, from the perspective of the contractors, what are the factors that cause deadline extensions in public works contracts and how these can be minimized by applying the Lean Construction concepts. The research is limited to the public works of federal agencies located in Sergipe. First, a systematic review of the literature on lean construction, public works, application of lean construction in public works and delays in works was carried out. Then, a systematic mapping of the literature on Lean Construction and Public Works was carried out, in order to obtain examples of the applicability of lean concepts in public works to verify how the theme is being treated. The tool for obtaining data on contracts was the “Portal da Transparência”, launched by the “Ministério da Transparência” and the “Controladoria Geral da União” in 2004, which is an open access electronic address. To answer the research problem, a questionnaire, with open and closed questions, was prepared based on the literature review and was applied with the contractors responsible for the execution of each contract. The results found demonstrate that the main factors that cause time additives are part of the aspects related to the project design, with emphasis on the errors in the budget figures. As they are aspects prior to bidding, the solutions can be implemented in public agencies. Thus, the use of Lean tools such as concurrent engineering, Target Value Design and BIM can minimize the occurrence of time delays in public works.
id UFS-2_35b594cc1299642ec3827a7b7d4e33c0
oai_identifier_str oai:ufs.br:riufs/13631
network_acronym_str UFS-2
network_name_str Repositório Institucional da UFS
repository_id_str
spelling Weber, Lucas EduardoSantos, Débora de GoisMendes, Ludmilson Abritta2020-09-03T21:31:48Z2020-09-03T21:31:48Z2020-03-23WEBER, Lucas Eduardo. Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos. 2020. 96 f. Dissertação (Mestrado em Engenharia Civil) - Universidade Federal de Sergipe, São Cristóvão, SE, 2020.http://ri.ufs.br/jspui/handle/riufs/13631Public works aim to meet social demand and play an important role in the social and economic development of a region. However, they are constantly characterized by their inefficiency and recurring delays in delivering the project. In this way, this research investigates, from the perspective of the contractors, what are the factors that cause deadline extensions in public works contracts and how these can be minimized by applying the Lean Construction concepts. The research is limited to the public works of federal agencies located in Sergipe. First, a systematic review of the literature on lean construction, public works, application of lean construction in public works and delays in works was carried out. Then, a systematic mapping of the literature on Lean Construction and Public Works was carried out, in order to obtain examples of the applicability of lean concepts in public works to verify how the theme is being treated. The tool for obtaining data on contracts was the “Portal da Transparência”, launched by the “Ministério da Transparência” and the “Controladoria Geral da União” in 2004, which is an open access electronic address. To answer the research problem, a questionnaire, with open and closed questions, was prepared based on the literature review and was applied with the contractors responsible for the execution of each contract. The results found demonstrate that the main factors that cause time additives are part of the aspects related to the project design, with emphasis on the errors in the budget figures. As they are aspects prior to bidding, the solutions can be implemented in public agencies. Thus, the use of Lean tools such as concurrent engineering, Target Value Design and BIM can minimize the occurrence of time delays in public works.Os empreendimentos públicos objetivam o atendimento a uma demanda social e têm um papel importante para o desenvolvimento social e econômico de uma região. Contudo, são constantemente caracterizados por sua ineficiência e recorrentes atrasos na entrega do objeto. Desta forma, esta pesquisa investiga, sob a ótica dos empreiteiros, quais são os fatores que causam os aditivos de tempo nos contratos de obras públicas e como estes podem ser minimizados aplicando os conceitos da Construção Enxuta. A pesquisa limita-se às obras públicas de órgãos federais localizados em Sergipe. Primeiramente foi feita uma revisão sistemática da literatura sobre construção enxuta, obras públicas, aplicação da construção enxuta em obras públicas e atrasos em obras. Em seguida, foi realizado um mapeamento sistemático da literatura sobre a Construção Enxuta e Obras Públicas, a fim de obter exemplos de aplicabilidade dos conceitos enxutos em empreendimentos públicos para verificar como a temática está sendo tratada. A ferramenta para obtenção dos dados sobre os contratos foi o Portal da Transparência, lançado pelo Ministério da Transparência e Controladoria Geral da União em 2004, que é um endereço eletrônico de acesso livre. Para responder ao problema de pesquisa, um questionário, com perguntas abertas e fechadas, foi elaborado com base na revisão da literatura e foi aplicado com os empreiteiros responsáveis pela execução de cada contrato. Os resultados encontrados demonstram que os principais fatores causadores de aditivos de prazo fazem parte dos aspectos relacionados à concepção do empreendimento, com destaque para os erros nos quantitativos do orçamento. Por serem aspectos anteriores à licitação, as soluções podem ser implementadas nos órgãos públicos. Assim, o uso de ferramentas Lean como a engenharia simultânea, o Target Value Design e o BIM podem minorar a ocorrência de acréscimo de tempo em obras públicas.São Cristóvão, SEporObras públicasAditivos de prazoConstrução enxutaPublic worksDeadline extensionLean constructionENGENHARIAS::ENGENHARIA CIVILAditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutosinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisPós-Graduação em Engenharia CivilUniversidade Federal de Sergipereponame:Repositório Institucional da UFSinstname:Universidade Federal de Sergipe (UFS)instacron:UFSinfo:eu-repo/semantics/openAccessLICENSElicense.txtlicense.txttext/plain; charset=utf-81475https://ri.ufs.br/jspui/bitstream/riufs/13631/1/license.txt098cbbf65c2c15e1fb2e49c5d306a44cMD51ORIGINALLUCAS_EDUARDO_WEBER.pdfLUCAS_EDUARDO_WEBER.pdfapplication/pdf1819796https://ri.ufs.br/jspui/bitstream/riufs/13631/2/LUCAS_EDUARDO_WEBER.pdf0f7877355b0170703a99dbb8eab5cbcbMD52TEXTLUCAS_EDUARDO_WEBER.pdf.txtLUCAS_EDUARDO_WEBER.pdf.txtExtracted texttext/plain193876https://ri.ufs.br/jspui/bitstream/riufs/13631/3/LUCAS_EDUARDO_WEBER.pdf.txtce2ae4772ebed09022617630f1842d24MD53THUMBNAILLUCAS_EDUARDO_WEBER.pdf.jpgLUCAS_EDUARDO_WEBER.pdf.jpgGenerated Thumbnailimage/jpeg1209https://ri.ufs.br/jspui/bitstream/riufs/13631/4/LUCAS_EDUARDO_WEBER.pdf.jpg6b8896bfbb80a29318c376d3ab5ca460MD54riufs/136312020-09-03 18:31:48.937oai:ufs.br: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Repositório InstitucionalPUBhttps://ri.ufs.br/oai/requestrepositorio@academico.ufs.bropendoar:2020-09-03T21:31:48Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)false
dc.title.pt_BR.fl_str_mv Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
title Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
spellingShingle Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
Weber, Lucas Eduardo
Obras públicas
Aditivos de prazo
Construção enxuta
Public works
Deadline extension
Lean construction
ENGENHARIAS::ENGENHARIA CIVIL
title_short Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
title_full Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
title_fullStr Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
title_full_unstemmed Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
title_sort Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos
author Weber, Lucas Eduardo
author_facet Weber, Lucas Eduardo
author_role author
dc.contributor.author.fl_str_mv Weber, Lucas Eduardo
dc.contributor.advisor1.fl_str_mv Santos, Débora de Gois
dc.contributor.advisor-co1.fl_str_mv Mendes, Ludmilson Abritta
contributor_str_mv Santos, Débora de Gois
Mendes, Ludmilson Abritta
dc.subject.por.fl_str_mv Obras públicas
Aditivos de prazo
Construção enxuta
topic Obras públicas
Aditivos de prazo
Construção enxuta
Public works
Deadline extension
Lean construction
ENGENHARIAS::ENGENHARIA CIVIL
dc.subject.eng.fl_str_mv Public works
Deadline extension
Lean construction
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA CIVIL
description Public works aim to meet social demand and play an important role in the social and economic development of a region. However, they are constantly characterized by their inefficiency and recurring delays in delivering the project. In this way, this research investigates, from the perspective of the contractors, what are the factors that cause deadline extensions in public works contracts and how these can be minimized by applying the Lean Construction concepts. The research is limited to the public works of federal agencies located in Sergipe. First, a systematic review of the literature on lean construction, public works, application of lean construction in public works and delays in works was carried out. Then, a systematic mapping of the literature on Lean Construction and Public Works was carried out, in order to obtain examples of the applicability of lean concepts in public works to verify how the theme is being treated. The tool for obtaining data on contracts was the “Portal da Transparência”, launched by the “Ministério da Transparência” and the “Controladoria Geral da União” in 2004, which is an open access electronic address. To answer the research problem, a questionnaire, with open and closed questions, was prepared based on the literature review and was applied with the contractors responsible for the execution of each contract. The results found demonstrate that the main factors that cause time additives are part of the aspects related to the project design, with emphasis on the errors in the budget figures. As they are aspects prior to bidding, the solutions can be implemented in public agencies. Thus, the use of Lean tools such as concurrent engineering, Target Value Design and BIM can minimize the occurrence of time delays in public works.
publishDate 2020
dc.date.accessioned.fl_str_mv 2020-09-03T21:31:48Z
dc.date.available.fl_str_mv 2020-09-03T21:31:48Z
dc.date.issued.fl_str_mv 2020-03-23
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv WEBER, Lucas Eduardo. Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos. 2020. 96 f. Dissertação (Mestrado em Engenharia Civil) - Universidade Federal de Sergipe, São Cristóvão, SE, 2020.
dc.identifier.uri.fl_str_mv http://ri.ufs.br/jspui/handle/riufs/13631
identifier_str_mv WEBER, Lucas Eduardo. Aditivos de prazo em obras públicas : uma análise sob a ótica dos empreiteiros e a aplicabilidade dos conceitos enxutos. 2020. 96 f. Dissertação (Mestrado em Engenharia Civil) - Universidade Federal de Sergipe, São Cristóvão, SE, 2020.
url http://ri.ufs.br/jspui/handle/riufs/13631
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.program.fl_str_mv Pós-Graduação em Engenharia Civil
dc.publisher.initials.fl_str_mv Universidade Federal de Sergipe
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFS
instname:Universidade Federal de Sergipe (UFS)
instacron:UFS
instname_str Universidade Federal de Sergipe (UFS)
instacron_str UFS
institution UFS
reponame_str Repositório Institucional da UFS
collection Repositório Institucional da UFS
bitstream.url.fl_str_mv https://ri.ufs.br/jspui/bitstream/riufs/13631/1/license.txt
https://ri.ufs.br/jspui/bitstream/riufs/13631/2/LUCAS_EDUARDO_WEBER.pdf
https://ri.ufs.br/jspui/bitstream/riufs/13631/3/LUCAS_EDUARDO_WEBER.pdf.txt
https://ri.ufs.br/jspui/bitstream/riufs/13631/4/LUCAS_EDUARDO_WEBER.pdf.jpg
bitstream.checksum.fl_str_mv 098cbbf65c2c15e1fb2e49c5d306a44c
0f7877355b0170703a99dbb8eab5cbcb
ce2ae4772ebed09022617630f1842d24
6b8896bfbb80a29318c376d3ab5ca460
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)
repository.mail.fl_str_mv repositorio@academico.ufs.br
_version_ 1802110823571652608