Resumo: Brazilian cities are facing several problems related to urban mobility. These problems are caused, mainly, by the massive use of individual motorized transportation and by the quality of the offered public transportation, which intensifies the first cause. In this way, developing traffic jams, increased waste of time in traffic, waste of energy, environmental impacts, poor populational life quality and high costs. Therefore, with the goal of solving these problems and of developing more sustainable cities, it was introduced by the National Urban Mobility Plan through the law 12.587. Being Aracaju one of these cities, it proposes in its Mobility plan, the prioritization of the circulation of non-motorized modals, and high capacity motorized ones to achieve these goals, being the last one provided by the deployment of BRT. Thereby, the system is the deployment phase, so in this assignment is analyzed the proposed project of the Bus Rapid Transit in Aracaju to ascertain its real classification by its features. And from this, compare it to other models of the same, already implanted and consolidated in other places, thus observing how the features of the Aracaju system behave in relation to the others. And ascertain the possible impacts of it, provided to the city and the local population. In this way, concluding that the system does not show every feature proposed by the project, due to 60% of the corridors does not show the prerequisites to the BRT classification, so reducing its extension and range in the town, despite its connection to other counties. Therefore, not being as efficient as planned, needing a revision toward the inclusion of BRT classificatory features in at least a few more.
id UFS-2_4e428075277f2142a495d560ebb3983a
oai_identifier_str oai:ufs.br:riufs/7093
network_acronym_str UFS-2
network_name_str Repositório Institucional da UFS
repository_id_str
spelling Melo, Maria Clara RamosAraújo, Rozana Rivas de2017-12-07T19:18:01Z2017-12-07T19:18:01Z2016-11-01MELO, Maria Clara Ramos. Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju. 2016. 124 f. Trabalho de Conclusão de Curso (Graduação em Arquitetura e Urbanismo)- Departamento de Arquitetura e Urbanismo, Campus de Laranjeiras, Universidade Federal de Sergipe, Laranjeiras, 2016.https://ri.ufs.br/handle/riufs/7093Brazilian cities are facing several problems related to urban mobility. These problems are caused, mainly, by the massive use of individual motorized transportation and by the quality of the offered public transportation, which intensifies the first cause. In this way, developing traffic jams, increased waste of time in traffic, waste of energy, environmental impacts, poor populational life quality and high costs. Therefore, with the goal of solving these problems and of developing more sustainable cities, it was introduced by the National Urban Mobility Plan through the law 12.587. Being Aracaju one of these cities, it proposes in its Mobility plan, the prioritization of the circulation of non-motorized modals, and high capacity motorized ones to achieve these goals, being the last one provided by the deployment of BRT. Thereby, the system is the deployment phase, so in this assignment is analyzed the proposed project of the Bus Rapid Transit in Aracaju to ascertain its real classification by its features. And from this, compare it to other models of the same, already implanted and consolidated in other places, thus observing how the features of the Aracaju system behave in relation to the others. And ascertain the possible impacts of it, provided to the city and the local population. In this way, concluding that the system does not show every feature proposed by the project, due to 60% of the corridors does not show the prerequisites to the BRT classification, so reducing its extension and range in the town, despite its connection to other counties. Therefore, not being as efficient as planned, needing a revision toward the inclusion of BRT classificatory features in at least a few more.As cidades brasileiras enfrentam diversos problemas relacionados a mobilidade urbana. Estes são causados, principalmente, pelo uso massivo do transporte individual motorizado e pela qualidade do transporte público ofertado, a qual intensifica a primeira causa. Dessa forma, desenvolvendo congestionamentos, maiores perdas de tempo no trânsito, desperdício de energia, impactos ambientais, má qualidade de vida populacional e altos custos. Logo, com objetivo de solucionar tais problemas e de desenvolver cidades mais sustentáveis, foi introduzido o Plano Nacional de Mobilidade Urbana através da lei 12.587. Sendo Aracaju uma dessas cidades, a mesma propõe, em seu Plano de Mobilidade, a priorização da circulação dos modais não motorizados e motorizados de alta capacidade para atingir tais objetivos, sendo o último proporcionado através da implantação do BRT. Dessa forma, como o sistema está em fase de implantação, é então, analisado, no presente trabalho, o projeto proposto do Bus Rapid Transit em Aracaju para a partir de suas características averiguar sua real classificação. E a partir deste, compara-lo com outros modelos do mesmo, já implantados e consolidados, em outras localidades, observando assim como se comporta as características do sistema de Aracaju diante dos demais. E também averiguar os possíveis impactos do mesmo proporcionados a cidade e a população local. Dessa forma, concluindo-se que o sistema não apresenta todas características propostas no projeto, devido a 60% dos corredores não apresentarem os pré-requisitos para a classificação de BRT, assim reduzindo sua extensão e área de alcance na cidade, além de sua conexão com outros municípios. Dessa forma, não sendo eficiente como planejado, necessitando de uma revisão para a inclusão de características classificatórias de corredor BRT em pelo menos mais alguns.Laranjeiras, SEporArquiteturaAracaju (SE)Transporte urbanoPlanejamento urbanoTrânsitoMobilidade urbanaUrban mobilityBus Rapid Transit (BRT)CIENCIAS SOCIAIS APLICADAS::ARQUITETURA E URBANISMOBus Rapid Transit (BRT): análise do sistema proposto para Aracajuinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisUniversidade Federal de SergipeDAU - Departamento de Arquitetura e Urbanismo – Laranjeiras - Presencialreponame:Repositório Institucional da UFSinstname:Universidade Federal de Sergipe (UFS)instacron:UFSinfo:eu-repo/semantics/openAccessLICENSElicense.txtlicense.txttext/plain; charset=utf-81475https://ri.ufs.br/jspui/bitstream/riufs/7093/1/license.txt098cbbf65c2c15e1fb2e49c5d306a44cMD51ORIGINALMaria_Clara_Ramos_Melo.pdfMaria_Clara_Ramos_Melo.pdfapplication/pdf6197918https://ri.ufs.br/jspui/bitstream/riufs/7093/2/Maria_Clara_Ramos_Melo.pdf771518e0a127d65ad28e6fc01ccef3b6MD52TEXTMaria_Clara_Ramos_Melo.pdf.txtMaria_Clara_Ramos_Melo.pdf.txtExtracted texttext/plain222157https://ri.ufs.br/jspui/bitstream/riufs/7093/3/Maria_Clara_Ramos_Melo.pdf.txt8d1ae3c447cfc8c6db830269aa96fd09MD53THUMBNAILMaria_Clara_Ramos_Melo.pdf.jpgMaria_Clara_Ramos_Melo.pdf.jpgGenerated Thumbnailimage/jpeg1279https://ri.ufs.br/jspui/bitstream/riufs/7093/4/Maria_Clara_Ramos_Melo.pdf.jpga7519f36ac0b526e8bf6060c119cedd2MD54riufs/70932017-12-07 16:18:01.353oai:ufs.br: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Repositório InstitucionalPUBhttps://ri.ufs.br/oai/requestrepositorio@academico.ufs.bropendoar:2017-12-07T19:18:01Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)false
dc.title.pt_BR.fl_str_mv Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
title Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
spellingShingle Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
Melo, Maria Clara Ramos
Arquitetura
Aracaju (SE)
Transporte urbano
Planejamento urbano
Trânsito
Mobilidade urbana
Urban mobility
Bus Rapid Transit (BRT)
CIENCIAS SOCIAIS APLICADAS::ARQUITETURA E URBANISMO
title_short Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
title_full Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
title_fullStr Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
title_full_unstemmed Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
title_sort Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju
author Melo, Maria Clara Ramos
author_facet Melo, Maria Clara Ramos
author_role author
dc.contributor.author.fl_str_mv Melo, Maria Clara Ramos
dc.contributor.advisor1.fl_str_mv Araújo, Rozana Rivas de
contributor_str_mv Araújo, Rozana Rivas de
dc.subject.por.fl_str_mv Arquitetura
Aracaju (SE)
Transporte urbano
Planejamento urbano
Trânsito
Mobilidade urbana
Urban mobility
topic Arquitetura
Aracaju (SE)
Transporte urbano
Planejamento urbano
Trânsito
Mobilidade urbana
Urban mobility
Bus Rapid Transit (BRT)
CIENCIAS SOCIAIS APLICADAS::ARQUITETURA E URBANISMO
dc.subject.eng.fl_str_mv Bus Rapid Transit (BRT)
dc.subject.cnpq.fl_str_mv CIENCIAS SOCIAIS APLICADAS::ARQUITETURA E URBANISMO
description Brazilian cities are facing several problems related to urban mobility. These problems are caused, mainly, by the massive use of individual motorized transportation and by the quality of the offered public transportation, which intensifies the first cause. In this way, developing traffic jams, increased waste of time in traffic, waste of energy, environmental impacts, poor populational life quality and high costs. Therefore, with the goal of solving these problems and of developing more sustainable cities, it was introduced by the National Urban Mobility Plan through the law 12.587. Being Aracaju one of these cities, it proposes in its Mobility plan, the prioritization of the circulation of non-motorized modals, and high capacity motorized ones to achieve these goals, being the last one provided by the deployment of BRT. Thereby, the system is the deployment phase, so in this assignment is analyzed the proposed project of the Bus Rapid Transit in Aracaju to ascertain its real classification by its features. And from this, compare it to other models of the same, already implanted and consolidated in other places, thus observing how the features of the Aracaju system behave in relation to the others. And ascertain the possible impacts of it, provided to the city and the local population. In this way, concluding that the system does not show every feature proposed by the project, due to 60% of the corridors does not show the prerequisites to the BRT classification, so reducing its extension and range in the town, despite its connection to other counties. Therefore, not being as efficient as planned, needing a revision toward the inclusion of BRT classificatory features in at least a few more.
publishDate 2016
dc.date.issued.fl_str_mv 2016-11-01
dc.date.accessioned.fl_str_mv 2017-12-07T19:18:01Z
dc.date.available.fl_str_mv 2017-12-07T19:18:01Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv MELO, Maria Clara Ramos. Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju. 2016. 124 f. Trabalho de Conclusão de Curso (Graduação em Arquitetura e Urbanismo)- Departamento de Arquitetura e Urbanismo, Campus de Laranjeiras, Universidade Federal de Sergipe, Laranjeiras, 2016.
dc.identifier.uri.fl_str_mv https://ri.ufs.br/handle/riufs/7093
identifier_str_mv MELO, Maria Clara Ramos. Bus Rapid Transit (BRT): análise do sistema proposto para Aracaju. 2016. 124 f. Trabalho de Conclusão de Curso (Graduação em Arquitetura e Urbanismo)- Departamento de Arquitetura e Urbanismo, Campus de Laranjeiras, Universidade Federal de Sergipe, Laranjeiras, 2016.
url https://ri.ufs.br/handle/riufs/7093
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.initials.fl_str_mv Universidade Federal de Sergipe
dc.publisher.department.fl_str_mv DAU - Departamento de Arquitetura e Urbanismo – Laranjeiras - Presencial
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFS
instname:Universidade Federal de Sergipe (UFS)
instacron:UFS
instname_str Universidade Federal de Sergipe (UFS)
instacron_str UFS
institution UFS
reponame_str Repositório Institucional da UFS
collection Repositório Institucional da UFS
bitstream.url.fl_str_mv https://ri.ufs.br/jspui/bitstream/riufs/7093/1/license.txt
https://ri.ufs.br/jspui/bitstream/riufs/7093/2/Maria_Clara_Ramos_Melo.pdf
https://ri.ufs.br/jspui/bitstream/riufs/7093/3/Maria_Clara_Ramos_Melo.pdf.txt
https://ri.ufs.br/jspui/bitstream/riufs/7093/4/Maria_Clara_Ramos_Melo.pdf.jpg
bitstream.checksum.fl_str_mv 098cbbf65c2c15e1fb2e49c5d306a44c
771518e0a127d65ad28e6fc01ccef3b6
8d1ae3c447cfc8c6db830269aa96fd09
a7519f36ac0b526e8bf6060c119cedd2
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)
repository.mail.fl_str_mv repositorio@academico.ufs.br
_version_ 1802110840473649152