Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector
Autor(a) principal: | |
---|---|
Data de Publicação: | 2021 |
Outros Autores: | , , , , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Gestão & Produção |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300302 |
Resumo: | Abstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption. |
id |
UFSCAR-3_3c0d1406ad5944130ed09601037db568 |
---|---|
oai_identifier_str |
oai:scielo:S0104-530X2021000300302 |
network_acronym_str |
UFSCAR-3 |
network_name_str |
Gestão & Produção |
repository_id_str |
|
spelling |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sectorTotal Productive MaintenanceTPMDifficultiesBarriersAbstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption.Universidade Federal de São Carlos2021-01-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300302Gestão & Produção v.28 n.3 2021reponame:Gestão & Produçãoinstname:Universidade Federal de São Carlos (UFSCAR)instacron:UFSCAR10.1590/1806-9649-2021v28e5300info:eu-repo/semantics/openAccessArromba,Iara FranchiAnholon,RosleyRampasso,Izabela SimonSilva,DirceuQuelhas,Osvaldo Luiz GonçalvesSanta-Eulalia,Luis AntonioLeal Filho,Waltereng2021-09-10T00:00:00Zoai:scielo:S0104-530X2021000300302Revistahttps://www.gestaoeproducao.com/PUBhttps://old.scielo.br/oai/scielo-oai.phpgp@dep.ufscar.br||revistagestaoemanalise@unichristus.edu.br1806-96490104-530Xopendoar:2021-09-10T00:00Gestão & Produção - Universidade Federal de São Carlos (UFSCAR)false |
dc.title.none.fl_str_mv |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
title |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
spellingShingle |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector Arromba,Iara Franchi Total Productive Maintenance TPM Difficulties Barriers |
title_short |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
title_full |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
title_fullStr |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
title_full_unstemmed |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
title_sort |
Difficulties observed when implementing Total Productive Maintenance (TPM): empirical evidences from the manufacturing sector |
author |
Arromba,Iara Franchi |
author_facet |
Arromba,Iara Franchi Anholon,Rosley Rampasso,Izabela Simon Silva,Dirceu Quelhas,Osvaldo Luiz Gonçalves Santa-Eulalia,Luis Antonio Leal Filho,Walter |
author_role |
author |
author2 |
Anholon,Rosley Rampasso,Izabela Simon Silva,Dirceu Quelhas,Osvaldo Luiz Gonçalves Santa-Eulalia,Luis Antonio Leal Filho,Walter |
author2_role |
author author author author author author |
dc.contributor.author.fl_str_mv |
Arromba,Iara Franchi Anholon,Rosley Rampasso,Izabela Simon Silva,Dirceu Quelhas,Osvaldo Luiz Gonçalves Santa-Eulalia,Luis Antonio Leal Filho,Walter |
dc.subject.por.fl_str_mv |
Total Productive Maintenance TPM Difficulties Barriers |
topic |
Total Productive Maintenance TPM Difficulties Barriers |
description |
Abstract: This article analyses the difficulties observed in adopting the Total Productive Maintenance (TPM) program in production systems. The research strategies used for this purpose consisted of a literature review, a panel of experts and a survey with professionals working in manufacturing companies. Altogether, 69 market professionals took part in the survey and the collected data was analyzed through the PLS-SEM technique. Results indicate that there is a causal relationship between difficulties associated with the planning phase of a TPM program and issues associated with its implementation. This is an original research and the results are valuable to business professionals desiring to properly implement TPM, as well for researchers interested in the mechanics of total productive maintenance system’s adoption. |
publishDate |
2021 |
dc.date.none.fl_str_mv |
2021-01-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300302 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300302 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/1806-9649-2021v28e5300 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Universidade Federal de São Carlos |
publisher.none.fl_str_mv |
Universidade Federal de São Carlos |
dc.source.none.fl_str_mv |
Gestão & Produção v.28 n.3 2021 reponame:Gestão & Produção instname:Universidade Federal de São Carlos (UFSCAR) instacron:UFSCAR |
instname_str |
Universidade Federal de São Carlos (UFSCAR) |
instacron_str |
UFSCAR |
institution |
UFSCAR |
reponame_str |
Gestão & Produção |
collection |
Gestão & Produção |
repository.name.fl_str_mv |
Gestão & Produção - Universidade Federal de São Carlos (UFSCAR) |
repository.mail.fl_str_mv |
gp@dep.ufscar.br||revistagestaoemanalise@unichristus.edu.br |
_version_ |
1750118207966937088 |