Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição
Autor(a) principal: | |
---|---|
Data de Publicação: | 2017 |
Tipo de documento: | Dissertação |
Idioma: | por |
Título da fonte: | Manancial - Repositório Digital da UFSM |
dARK ID: | ark:/26339/001300000hxrv |
Texto Completo: | http://repositorio.ufsm.br/handle/1/14719 |
Resumo: | The continuous and reliable supply of energy becomes a necessity of modern society, therefore, it is expected that its restoration is as fast as possible in any interruptions, and that it will reach the smallest possible number of consumers. These interruptions represent high costs for the electrical utility companies, since in addition to the loss of revenue there is a need to relocate maintenance teams, possible indemnities, and possible financial compensation for inadequate service, among others. Power substations, as well as their equipment and subsystems, are an important element in the generation and consumption chain in any electrical system, and are designed to operate for several years with low outages or failures. However it is necessary to follow the life cycle of each component of a substation, as well as its performance, evaluating the failure rates, maintenance costs, impact on the system in which it is inserted, and even overcoming its technology. In this context, the present work presents a methodology for prioritizing modernization investments in distribution substations, adopting techniques to determine feeder reliability based on the logical-structural matrix, considering the total failure rates in permanent regime and rate of failure in a permanent transitory regime, as well as a multi-criteria decision-making methodology known as Analytic Hierarchy Process, to prioritize the available alternatives. Reliability indicators are adopted and the criteria of criticality are defined, taking into account the analysis of experts in the electricity sector. A case study will be presented, where it is proposed to evaluate the prioritization of medium voltage circuit breakers, installed in an energy distribution substation located in the concession area of the RGE Sul distributor. Four feeder modules are selected, with a cycle of Operation equal to 0,3s - CO - 3min - CO, i.e. only a fast reclosing |
id |
UFSM_4b692c5a7d565c2cb45a4e60d20ce870 |
---|---|
oai_identifier_str |
oai:repositorio.ufsm.br:1/14719 |
network_acronym_str |
UFSM |
network_name_str |
Manancial - Repositório Digital da UFSM |
repository_id_str |
|
spelling |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuiçãoMethodology of prioritization of investments in modernization of protection and manufacturing equipment of distribution substationsPriorizaçãoDisjuntoresSubestaçõesMLEPrioritizationCircuit breakersSubstationsLogical-structural matrixCNPQ::ENGENHARIAS::ENGENHARIA ELETRICAThe continuous and reliable supply of energy becomes a necessity of modern society, therefore, it is expected that its restoration is as fast as possible in any interruptions, and that it will reach the smallest possible number of consumers. These interruptions represent high costs for the electrical utility companies, since in addition to the loss of revenue there is a need to relocate maintenance teams, possible indemnities, and possible financial compensation for inadequate service, among others. Power substations, as well as their equipment and subsystems, are an important element in the generation and consumption chain in any electrical system, and are designed to operate for several years with low outages or failures. However it is necessary to follow the life cycle of each component of a substation, as well as its performance, evaluating the failure rates, maintenance costs, impact on the system in which it is inserted, and even overcoming its technology. In this context, the present work presents a methodology for prioritizing modernization investments in distribution substations, adopting techniques to determine feeder reliability based on the logical-structural matrix, considering the total failure rates in permanent regime and rate of failure in a permanent transitory regime, as well as a multi-criteria decision-making methodology known as Analytic Hierarchy Process, to prioritize the available alternatives. Reliability indicators are adopted and the criteria of criticality are defined, taking into account the analysis of experts in the electricity sector. A case study will be presented, where it is proposed to evaluate the prioritization of medium voltage circuit breakers, installed in an energy distribution substation located in the concession area of the RGE Sul distributor. Four feeder modules are selected, with a cycle of Operation equal to 0,3s - CO - 3min - CO, i.e. only a fast reclosingO fornecimento contínuo e confiável de energia torna-se uma necessidade da sociedade moderna, e, portanto, espera-se que o seu restabelecimento seja o mais rápido possível, em eventuais interrupções, e que atinja o menor número possível de consumidores. Tais interrupções representam elevados custos para as concessionárias, pois além da perda de receita, há necessidade do deslocamento de equipes de manutenção, eventuais indenizações, possíveis compensações financeiras pelo serviço inadequado, entre outros. As subestações de energia, bem como seus equipamentos e subsistemas, são um importante elemento na cadeia de geração e consumo em qualquer sistema elétrico, sendo concebidas para operarem por diversos anos com baixas taxas de indisponibilidade ou falhas. Entretanto faz-se necessário o acompanhamento do ciclo de vida de cada componente integrante de uma subestação, bem como a sua performance, avaliando as taxas de falhas, custos de manutenções, impacto no sistema no qual está inserido, e até mesmo superação de sua tecnologia construtiva. Dentro deste contexto, o presente trabalho apresenta uma metodologia para priorização de investimentos de modernização em subestações de distribuição, adotando-se técnicas para determinar a confiabilidade dos alimentadores baseada na matriz lógico-estrutural, considerando as taxas de falha total em regime permanente e taxa de falha em regime permanente de causa transitória, além de metodologia de tomada de decisão multicriterial, conhecida como Analytic Hierarchy Process, para priorização das alternativas disponíveis. São adotados indicadores de confiabilidade e definidos critérios de criticidade, levando em consideração as análises de especialistas do setor elétrico. É apresentado um estudo de caso, onde propõem-se avaliar priorização da modernização de disjuntores de média tensão, instalados em uma subestação de distribuição de energia inserida na área de concessão da distribuidora RGE Sul, sendo selecionados quatro módulos de alimentadores, que apresentam ciclo de operação igual a 0,3s – CO – 3min – CO, ou seja, apenas um religamento rápido.Universidade Federal de Santa MariaBrasilEngenharia ElétricaUFSMPrograma de Pós-Graduação em Engenharia ElétricaCentro de TecnologiaBernardon, Daniel Pinheirohttp://lattes.cnpq.br/6004612278397270Bellinaso, Lucas Vizzottohttp://lattes.cnpq.br/4423019009861180Knak Neto, Nelsonhttp://lattes.cnpq.br/8117456718259417Mello, Gabriel Dutra de2018-10-31T22:07:13Z2018-10-31T22:07:13Z2017-08-24info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttp://repositorio.ufsm.br/handle/1/14719ark:/26339/001300000hxrvporAttribution-NonCommercial-NoDerivatives 4.0 Internationalhttp://creativecommons.org/licenses/by-nc-nd/4.0/info:eu-repo/semantics/openAccessreponame:Manancial - Repositório Digital da UFSMinstname:Universidade Federal de Santa Maria (UFSM)instacron:UFSM2022-08-09T11:22:25Zoai:repositorio.ufsm.br:1/14719Biblioteca Digital de Teses e Dissertaçõeshttps://repositorio.ufsm.br/ONGhttps://repositorio.ufsm.br/oai/requestatendimento.sib@ufsm.br||tedebc@gmail.comopendoar:2022-08-09T11:22:25Manancial - Repositório Digital da UFSM - Universidade Federal de Santa Maria (UFSM)false |
dc.title.none.fl_str_mv |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição Methodology of prioritization of investments in modernization of protection and manufacturing equipment of distribution substations |
title |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
spellingShingle |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição Mello, Gabriel Dutra de Priorização Disjuntores Subestações MLE Prioritization Circuit breakers Substations Logical-structural matrix CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
title_short |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
title_full |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
title_fullStr |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
title_full_unstemmed |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
title_sort |
Metodologia de priorização de investimentos em modernização de equipamentos de proteção e manobra de subestações de distribuição |
author |
Mello, Gabriel Dutra de |
author_facet |
Mello, Gabriel Dutra de |
author_role |
author |
dc.contributor.none.fl_str_mv |
Bernardon, Daniel Pinheiro http://lattes.cnpq.br/6004612278397270 Bellinaso, Lucas Vizzotto http://lattes.cnpq.br/4423019009861180 Knak Neto, Nelson http://lattes.cnpq.br/8117456718259417 |
dc.contributor.author.fl_str_mv |
Mello, Gabriel Dutra de |
dc.subject.por.fl_str_mv |
Priorização Disjuntores Subestações MLE Prioritization Circuit breakers Substations Logical-structural matrix CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
topic |
Priorização Disjuntores Subestações MLE Prioritization Circuit breakers Substations Logical-structural matrix CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
description |
The continuous and reliable supply of energy becomes a necessity of modern society, therefore, it is expected that its restoration is as fast as possible in any interruptions, and that it will reach the smallest possible number of consumers. These interruptions represent high costs for the electrical utility companies, since in addition to the loss of revenue there is a need to relocate maintenance teams, possible indemnities, and possible financial compensation for inadequate service, among others. Power substations, as well as their equipment and subsystems, are an important element in the generation and consumption chain in any electrical system, and are designed to operate for several years with low outages or failures. However it is necessary to follow the life cycle of each component of a substation, as well as its performance, evaluating the failure rates, maintenance costs, impact on the system in which it is inserted, and even overcoming its technology. In this context, the present work presents a methodology for prioritizing modernization investments in distribution substations, adopting techniques to determine feeder reliability based on the logical-structural matrix, considering the total failure rates in permanent regime and rate of failure in a permanent transitory regime, as well as a multi-criteria decision-making methodology known as Analytic Hierarchy Process, to prioritize the available alternatives. Reliability indicators are adopted and the criteria of criticality are defined, taking into account the analysis of experts in the electricity sector. A case study will be presented, where it is proposed to evaluate the prioritization of medium voltage circuit breakers, installed in an energy distribution substation located in the concession area of the RGE Sul distributor. Four feeder modules are selected, with a cycle of Operation equal to 0,3s - CO - 3min - CO, i.e. only a fast reclosing |
publishDate |
2017 |
dc.date.none.fl_str_mv |
2017-08-24 2018-10-31T22:07:13Z 2018-10-31T22:07:13Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/masterThesis |
format |
masterThesis |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://repositorio.ufsm.br/handle/1/14719 |
dc.identifier.dark.fl_str_mv |
ark:/26339/001300000hxrv |
url |
http://repositorio.ufsm.br/handle/1/14719 |
identifier_str_mv |
ark:/26339/001300000hxrv |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.rights.driver.fl_str_mv |
Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/ info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/ |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Federal de Santa Maria Brasil Engenharia Elétrica UFSM Programa de Pós-Graduação em Engenharia Elétrica Centro de Tecnologia |
publisher.none.fl_str_mv |
Universidade Federal de Santa Maria Brasil Engenharia Elétrica UFSM Programa de Pós-Graduação em Engenharia Elétrica Centro de Tecnologia |
dc.source.none.fl_str_mv |
reponame:Manancial - Repositório Digital da UFSM instname:Universidade Federal de Santa Maria (UFSM) instacron:UFSM |
instname_str |
Universidade Federal de Santa Maria (UFSM) |
instacron_str |
UFSM |
institution |
UFSM |
reponame_str |
Manancial - Repositório Digital da UFSM |
collection |
Manancial - Repositório Digital da UFSM |
repository.name.fl_str_mv |
Manancial - Repositório Digital da UFSM - Universidade Federal de Santa Maria (UFSM) |
repository.mail.fl_str_mv |
atendimento.sib@ufsm.br||tedebc@gmail.com |
_version_ |
1815172347502526464 |