Analysis of contractual amendments in public constructions in the state of Minas Gerais

Detalhes bibliográficos
Autor(a) principal: Costa, Mateus Monferrari
Data de Publicação: 2021
Outros Autores: Almeida, Fernando do Couto Rosa
Tipo de documento: Artigo
Idioma: por
Título da fonte: The Journal of Engineering and Exact Sciences
Texto Completo: https://periodicos.ufv.br/jcec/article/view/12101
Resumo: The high demand for infrastructure in Brazil and the advancement of technological resources in construction industry generated an increase of projects complexity. Consequently, contractual amendments become recurrent in public constructions. Thus, the present paper aims to present a panorama of the engineering contracts signed by the State of Minas Gerais, as well as to show a case study of revitalization in Belo Horizonte/MG. For this purpose, 32 engineering public contracts in the last two years were analyzed, considering the amendments of costs and terms of those contracts. In particular, the case study showed that the mentioned construction work had several contractual amendments due to insufficiency and incompatibilities of projects. Moreover, the undersized contractual plan may be a consequence of divergent data and financial resources that compromised the estimation of the overall cost. However, despite the constant use of this tool in public contracts, it is understood that contractual amendments are still an important mechanism that allows the execution of construction works. This even in the absence of project specifications and adequate planning before the implementation of public enterprises.
id UFV-6_d3d3104a12d25637392f264d7e0cf16b
oai_identifier_str oai:ojs.periodicos.ufv.br:article/12101
network_acronym_str UFV-6
network_name_str The Journal of Engineering and Exact Sciences
repository_id_str
spelling Analysis of contractual amendments in public constructions in the state of Minas GeraisAnálise de aditivos contratuais em obras públicas no estado de Minas GeraisContractual amendmentPublic constructionOver pricePublic biddingAditivo contratualObras públicasSobrepreçoLicitaçãoThe high demand for infrastructure in Brazil and the advancement of technological resources in construction industry generated an increase of projects complexity. Consequently, contractual amendments become recurrent in public constructions. Thus, the present paper aims to present a panorama of the engineering contracts signed by the State of Minas Gerais, as well as to show a case study of revitalization in Belo Horizonte/MG. For this purpose, 32 engineering public contracts in the last two years were analyzed, considering the amendments of costs and terms of those contracts. In particular, the case study showed that the mentioned construction work had several contractual amendments due to insufficiency and incompatibilities of projects. Moreover, the undersized contractual plan may be a consequence of divergent data and financial resources that compromised the estimation of the overall cost. However, despite the constant use of this tool in public contracts, it is understood that contractual amendments are still an important mechanism that allows the execution of construction works. This even in the absence of project specifications and adequate planning before the implementation of public enterprises. A alta demanda por obras de infraestrutura no Brasil e o avanço dos recursos tecnológicos durante os processos na construção civil geraram o aumento da complexidade dos projetos. Em consequência, os aditivos contratuais para acréscimo de custo e prazo se tornam recorrentes em obras públicas. Assim, o presente trabalho buscou apresentar um panorama dos contratos de serviços de engenharia celebrados pelo Estado de Minas Gerais, bem como mostrar um estudo de caso de uma obra de reforma no município de Belo Horizonte/MG. Para isso, foram levantados 32 contratos de serviços de engenharia realizados pelo estado nos dois últimos anos, sendo analisados os aditivos de custos e prazos desses contratos. Em particular, o estudo de caso mostrou que a obra em questão teve diversos aditivos contratuais em virtude da insuficiência e incompatibilidades entre os projetos. Além disso, o subdimensionamento da planilha contratual se deve às divergências de dados e recursos financeiros que dificultaram a estimativa do custo total. Entretanto, apesar do uso constante dessa ferramenta nas obras públicas, compreende-se que o aditivo contratual ainda é um importante mecanismo que possibilita a execução de obras. Isso mesmo diante da falta de especificações em projetos e adequado planejamento antes da implantação dos empreendimentos públicos. Universidade Federal de Viçosa - UFV2021-03-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.ufv.br/jcec/article/view/1210110.18540/jcecvl7iss1pp12101-01-09eThe Journal of Engineering and Exact Sciences; Vol. 7 No. 1 (2021); 12101-01-09eThe Journal of Engineering and Exact Sciences; Vol. 7 Núm. 1 (2021); 12101-01-09eThe Journal of Engineering and Exact Sciences; v. 7 n. 1 (2021); 12101-01-09e2527-1075reponame:The Journal of Engineering and Exact Sciencesinstname:Universidade Federal de Viçosa (UFV)instacron:UFVporhttps://periodicos.ufv.br/jcec/article/view/12101/6487Copyright (c) 2021 The Journal of Engineering and Exact Scienceshttps://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessCosta, Mateus MonferrariAlmeida, Fernando do Couto Rosa2021-05-31T12:54:32Zoai:ojs.periodicos.ufv.br:article/12101Revistahttp://www.seer.ufv.br/seer/rbeq2/index.php/req2/oai2527-10752527-1075opendoar:2021-05-31T12:54:32The Journal of Engineering and Exact Sciences - Universidade Federal de Viçosa (UFV)false
dc.title.none.fl_str_mv Analysis of contractual amendments in public constructions in the state of Minas Gerais
Análise de aditivos contratuais em obras públicas no estado de Minas Gerais
title Analysis of contractual amendments in public constructions in the state of Minas Gerais
spellingShingle Analysis of contractual amendments in public constructions in the state of Minas Gerais
Costa, Mateus Monferrari
Contractual amendment
Public construction
Over price
Public bidding
Aditivo contratual
Obras públicas
Sobrepreço
Licitação
title_short Analysis of contractual amendments in public constructions in the state of Minas Gerais
title_full Analysis of contractual amendments in public constructions in the state of Minas Gerais
title_fullStr Analysis of contractual amendments in public constructions in the state of Minas Gerais
title_full_unstemmed Analysis of contractual amendments in public constructions in the state of Minas Gerais
title_sort Analysis of contractual amendments in public constructions in the state of Minas Gerais
author Costa, Mateus Monferrari
author_facet Costa, Mateus Monferrari
Almeida, Fernando do Couto Rosa
author_role author
author2 Almeida, Fernando do Couto Rosa
author2_role author
dc.contributor.author.fl_str_mv Costa, Mateus Monferrari
Almeida, Fernando do Couto Rosa
dc.subject.por.fl_str_mv Contractual amendment
Public construction
Over price
Public bidding
Aditivo contratual
Obras públicas
Sobrepreço
Licitação
topic Contractual amendment
Public construction
Over price
Public bidding
Aditivo contratual
Obras públicas
Sobrepreço
Licitação
description The high demand for infrastructure in Brazil and the advancement of technological resources in construction industry generated an increase of projects complexity. Consequently, contractual amendments become recurrent in public constructions. Thus, the present paper aims to present a panorama of the engineering contracts signed by the State of Minas Gerais, as well as to show a case study of revitalization in Belo Horizonte/MG. For this purpose, 32 engineering public contracts in the last two years were analyzed, considering the amendments of costs and terms of those contracts. In particular, the case study showed that the mentioned construction work had several contractual amendments due to insufficiency and incompatibilities of projects. Moreover, the undersized contractual plan may be a consequence of divergent data and financial resources that compromised the estimation of the overall cost. However, despite the constant use of this tool in public contracts, it is understood that contractual amendments are still an important mechanism that allows the execution of construction works. This even in the absence of project specifications and adequate planning before the implementation of public enterprises.
publishDate 2021
dc.date.none.fl_str_mv 2021-03-30
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.ufv.br/jcec/article/view/12101
10.18540/jcecvl7iss1pp12101-01-09e
url https://periodicos.ufv.br/jcec/article/view/12101
identifier_str_mv 10.18540/jcecvl7iss1pp12101-01-09e
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.ufv.br/jcec/article/view/12101/6487
dc.rights.driver.fl_str_mv Copyright (c) 2021 The Journal of Engineering and Exact Sciences
https://creativecommons.org/licenses/by/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2021 The Journal of Engineering and Exact Sciences
https://creativecommons.org/licenses/by/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Federal de Viçosa - UFV
publisher.none.fl_str_mv Universidade Federal de Viçosa - UFV
dc.source.none.fl_str_mv The Journal of Engineering and Exact Sciences; Vol. 7 No. 1 (2021); 12101-01-09e
The Journal of Engineering and Exact Sciences; Vol. 7 Núm. 1 (2021); 12101-01-09e
The Journal of Engineering and Exact Sciences; v. 7 n. 1 (2021); 12101-01-09e
2527-1075
reponame:The Journal of Engineering and Exact Sciences
instname:Universidade Federal de Viçosa (UFV)
instacron:UFV
instname_str Universidade Federal de Viçosa (UFV)
instacron_str UFV
institution UFV
reponame_str The Journal of Engineering and Exact Sciences
collection The Journal of Engineering and Exact Sciences
repository.name.fl_str_mv The Journal of Engineering and Exact Sciences - Universidade Federal de Viçosa (UFV)
repository.mail.fl_str_mv
_version_ 1798313321263267840