Measuring lead time and inventory in the manufacturing of electromechanical equipment.

Detalhes bibliográficos
Autor(a) principal: Moura, Greco Tusset de
Data de Publicação: 2007
Outros Autores: Martins, Jonatas Campos, Luckow, Felipe Troglio, Sellitto, Miguel Afonso
Tipo de documento: Artigo
Idioma: por
Título da fonte: GEPROS. Gestão da Produção. Operações e Sistemas
Texto Completo: https://revista.feb.unesp.br/gepros/article/view/172
Resumo: This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability.
id UNESP-2_b1e980e6f18a012672977d14c1ef5c36
oai_identifier_str oai:ojs.gepros.emnuvens.com.br:article/172
network_acronym_str UNESP-2
network_name_str GEPROS. Gestão da Produção. Operações e Sistemas
repository_id_str
spelling Measuring lead time and inventory in the manufacturing of electromechanical equipment.Medição de tempo de atravessamento e inventário em manufatura de equipamentos eletromecânicos.This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability.Este artigo trata da aplicação de um método de cálculo do tempo de atravessamento e inventário, em manufatura, de equipamentos eletromecânicos, fabricados sob encomenda. Revisam-se os conceitos de tempo de atravessamento e inventário e apresenta-se o método de cálculo. Na pesquisa de campo, coletaram-se dados de início e término de ordens de fabricação, quantidades fabricadas e valores de venda. O modelo de cálculo foi aplicado, permitindo considerações acerca da gestão do prazo de entrega e da fila de ordens na manufatura. Tais variáveis podem ser importantes em um cenário em que a competição também se dê por critérios de confiabilidade de entregas. Palavras-chave: tempo de atravessamento, inventário, prazo de entrega, produção sob encomenda, confiabilidade de entregas.A Fundacao para o Desenvolvimento de Bauru (FunDeB)2007-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revista.feb.unesp.br/gepros/article/view/17210.15675/gepros.v0i3.172Revista Gestão da Produção Operações e Sistemas; n. 3 (2007); Pag. 1071984-2430reponame:GEPROS. Gestão da Produção. Operações e Sistemasinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPporhttps://revista.feb.unesp.br/gepros/article/view/172/120Moura, Greco Tusset deMartins, Jonatas CamposLuckow, Felipe TroglioSellitto, Miguel Afonsoinfo:eu-repo/semantics/openAccess2008-10-15T20:19:33Zoai:ojs.gepros.emnuvens.com.br:article/172Revistahttps://revista.feb.unesp.br/geprosPUBhttps://revista.feb.unesp.br/gepros/oaigepros@feb.unesp.br||abjabbour@feb.unesp.br1984-24301809-614Xopendoar:2008-10-15T20:19:33GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP)false
dc.title.none.fl_str_mv Measuring lead time and inventory in the manufacturing of electromechanical equipment.
Medição de tempo de atravessamento e inventário em manufatura de equipamentos eletromecânicos.
title Measuring lead time and inventory in the manufacturing of electromechanical equipment.
spellingShingle Measuring lead time and inventory in the manufacturing of electromechanical equipment.
Moura, Greco Tusset de
title_short Measuring lead time and inventory in the manufacturing of electromechanical equipment.
title_full Measuring lead time and inventory in the manufacturing of electromechanical equipment.
title_fullStr Measuring lead time and inventory in the manufacturing of electromechanical equipment.
title_full_unstemmed Measuring lead time and inventory in the manufacturing of electromechanical equipment.
title_sort Measuring lead time and inventory in the manufacturing of electromechanical equipment.
author Moura, Greco Tusset de
author_facet Moura, Greco Tusset de
Martins, Jonatas Campos
Luckow, Felipe Troglio
Sellitto, Miguel Afonso
author_role author
author2 Martins, Jonatas Campos
Luckow, Felipe Troglio
Sellitto, Miguel Afonso
author2_role author
author
author
dc.contributor.author.fl_str_mv Moura, Greco Tusset de
Martins, Jonatas Campos
Luckow, Felipe Troglio
Sellitto, Miguel Afonso
description This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability.
publishDate 2007
dc.date.none.fl_str_mv 2007-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://revista.feb.unesp.br/gepros/article/view/172
10.15675/gepros.v0i3.172
url https://revista.feb.unesp.br/gepros/article/view/172
identifier_str_mv 10.15675/gepros.v0i3.172
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://revista.feb.unesp.br/gepros/article/view/172/120
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv A Fundacao para o Desenvolvimento de Bauru (FunDeB)
publisher.none.fl_str_mv A Fundacao para o Desenvolvimento de Bauru (FunDeB)
dc.source.none.fl_str_mv Revista Gestão da Produção Operações e Sistemas; n. 3 (2007); Pag. 107
1984-2430
reponame:GEPROS. Gestão da Produção. Operações e Sistemas
instname:Universidade Estadual Paulista (UNESP)
instacron:UNESP
instname_str Universidade Estadual Paulista (UNESP)
instacron_str UNESP
institution UNESP
reponame_str GEPROS. Gestão da Produção. Operações e Sistemas
collection GEPROS. Gestão da Produção. Operações e Sistemas
repository.name.fl_str_mv GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP)
repository.mail.fl_str_mv gepros@feb.unesp.br||abjabbour@feb.unesp.br
_version_ 1800215695039922176