Measuring lead time and inventory in the manufacturing of electromechanical equipment.
Autor(a) principal: | |
---|---|
Data de Publicação: | 2007 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | GEPROS. Gestão da Produção. Operações e Sistemas |
Texto Completo: | https://revista.feb.unesp.br/gepros/article/view/172 |
Resumo: | This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability. |
id |
UNESP-2_b1e980e6f18a012672977d14c1ef5c36 |
---|---|
oai_identifier_str |
oai:ojs.gepros.emnuvens.com.br:article/172 |
network_acronym_str |
UNESP-2 |
network_name_str |
GEPROS. Gestão da Produção. Operações e Sistemas |
repository_id_str |
|
spelling |
Measuring lead time and inventory in the manufacturing of electromechanical equipment.Medição de tempo de atravessamento e inventário em manufatura de equipamentos eletromecânicos.This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability.Este artigo trata da aplicação de um método de cálculo do tempo de atravessamento e inventário, em manufatura, de equipamentos eletromecânicos, fabricados sob encomenda. Revisam-se os conceitos de tempo de atravessamento e inventário e apresenta-se o método de cálculo. Na pesquisa de campo, coletaram-se dados de início e término de ordens de fabricação, quantidades fabricadas e valores de venda. O modelo de cálculo foi aplicado, permitindo considerações acerca da gestão do prazo de entrega e da fila de ordens na manufatura. Tais variáveis podem ser importantes em um cenário em que a competição também se dê por critérios de confiabilidade de entregas. Palavras-chave: tempo de atravessamento, inventário, prazo de entrega, produção sob encomenda, confiabilidade de entregas.A Fundacao para o Desenvolvimento de Bauru (FunDeB)2007-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revista.feb.unesp.br/gepros/article/view/17210.15675/gepros.v0i3.172Revista Gestão da Produção Operações e Sistemas; n. 3 (2007); Pag. 1071984-2430reponame:GEPROS. Gestão da Produção. Operações e Sistemasinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPporhttps://revista.feb.unesp.br/gepros/article/view/172/120Moura, Greco Tusset deMartins, Jonatas CamposLuckow, Felipe TroglioSellitto, Miguel Afonsoinfo:eu-repo/semantics/openAccess2008-10-15T20:19:33Zoai:ojs.gepros.emnuvens.com.br:article/172Revistahttps://revista.feb.unesp.br/geprosPUBhttps://revista.feb.unesp.br/gepros/oaigepros@feb.unesp.br||abjabbour@feb.unesp.br1984-24301809-614Xopendoar:2008-10-15T20:19:33GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. Medição de tempo de atravessamento e inventário em manufatura de equipamentos eletromecânicos. |
title |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
spellingShingle |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. Moura, Greco Tusset de |
title_short |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
title_full |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
title_fullStr |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
title_full_unstemmed |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
title_sort |
Measuring lead time and inventory in the manufacturing of electromechanical equipment. |
author |
Moura, Greco Tusset de |
author_facet |
Moura, Greco Tusset de Martins, Jonatas Campos Luckow, Felipe Troglio Sellitto, Miguel Afonso |
author_role |
author |
author2 |
Martins, Jonatas Campos Luckow, Felipe Troglio Sellitto, Miguel Afonso |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Moura, Greco Tusset de Martins, Jonatas Campos Luckow, Felipe Troglio Sellitto, Miguel Afonso |
description |
This paper presents an application for a calculation method of the lead-time and work-in-process inventory in xx manufacturing of electromechanical machines made after orders. Xx The concepts of lead-time and work-in-process were reviewed and the method presented. In the process, data regarding the beginning and the completion of the orders; quantities and revenues for each order, were collected. The method was applied and tested, allowing considerations about delivery time and queues in manufacturing management. Such variants can be important in a strategic scenario, in which competition also involves delivery reliability criteria. Keywords: lead-time, work-in-process, delivery time, production after orders, delivery reliability. |
publishDate |
2007 |
dc.date.none.fl_str_mv |
2007-09-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://revista.feb.unesp.br/gepros/article/view/172 10.15675/gepros.v0i3.172 |
url |
https://revista.feb.unesp.br/gepros/article/view/172 |
identifier_str_mv |
10.15675/gepros.v0i3.172 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://revista.feb.unesp.br/gepros/article/view/172/120 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
A Fundacao para o Desenvolvimento de Bauru (FunDeB) |
publisher.none.fl_str_mv |
A Fundacao para o Desenvolvimento de Bauru (FunDeB) |
dc.source.none.fl_str_mv |
Revista Gestão da Produção Operações e Sistemas; n. 3 (2007); Pag. 107 1984-2430 reponame:GEPROS. Gestão da Produção. Operações e Sistemas instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
GEPROS. Gestão da Produção. Operações e Sistemas |
collection |
GEPROS. Gestão da Produção. Operações e Sistemas |
repository.name.fl_str_mv |
GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
gepros@feb.unesp.br||abjabbour@feb.unesp.br |
_version_ |
1800215695039922176 |