Influence of waste management on the construction management plan: a case study in Teresina - PI

Detalhes bibliográficos
Autor(a) principal: Leitão Neto, Esdras Avelino
Data de Publicação: 2022
Tipo de documento: Artigo
Idioma: por
Título da fonte: Research, Society and Development
Texto Completo: https://rsdjournal.org/index.php/rsd/article/view/28758
Resumo: The construction industry in Teresina is constantly growing, as a result of which a large amount of raw material from the environment is being consumed, as well as large quantities of waste being generated.The generation of waste from construction causes great concern, as it is still presented as one of the great generators of environmental impacts, and when poorly executed, its management can directly affect the performance of the contruction works.The objective of this work is to analyze the waste management system of a work, where, through a survey of the management practices carried out, identify the problems and generating sources, and then propose the necessary actions to improve its efficiency.For this analysis, a structured checklist was used with the phases of management at the construction site, with the purpose of gathering information that shows the not adequate or absence of these practices in the work studied.The results obtained demonstrate that the lack of inspection and awareness of the companies, directly affect the work plan, due to the fact that many actions are still necessary for an adequate waste management.Thus, with the implementation of an efficient management system, there will be an increase in the work organization, cost reduction, and a reduction in the environmental impact caused at construction sites.
id UNIFEI_dded557672e19d0a7b24d01e179597d7
oai_identifier_str oai:ojs.pkp.sfu.ca:article/28758
network_acronym_str UNIFEI
network_name_str Research, Society and Development
repository_id_str
spelling Influence of waste management on the construction management plan: a case study in Teresina - PIInfluencia de la gestión de residuos en el plan de dirección de obra: un estudio de caso en Teresina – PIInfluência da gestão de resíduos no plano de gerenciamento de obra: um estudo de caso em Teresina – PIResíduos da construção civilGestão de resíduosImpacto ambientalEnsino.Construction wasteWaste managementEnvironmental impactTeaching.Residuos de la construcciónGestión de ResiduosImpacto ambientalEnseñanza.The construction industry in Teresina is constantly growing, as a result of which a large amount of raw material from the environment is being consumed, as well as large quantities of waste being generated.The generation of waste from construction causes great concern, as it is still presented as one of the great generators of environmental impacts, and when poorly executed, its management can directly affect the performance of the contruction works.The objective of this work is to analyze the waste management system of a work, where, through a survey of the management practices carried out, identify the problems and generating sources, and then propose the necessary actions to improve its efficiency.For this analysis, a structured checklist was used with the phases of management at the construction site, with the purpose of gathering information that shows the not adequate or absence of these practices in the work studied.The results obtained demonstrate that the lack of inspection and awareness of the companies, directly affect the work plan, due to the fact that many actions are still necessary for an adequate waste management.Thus, with the implementation of an efficient management system, there will be an increase in the work organization, cost reduction, and a reduction in the environmental impact caused at construction sites.El sector de la construcción civil en Teresina está en constante crecimiento, por lo que se consume gran cantidad de materia prima del medio ambiente, así como se generan grandes cantidades de residuos. La generación de residuos de la construcción civil (RCC) causa gran preocupación, pues además de presentarse como uno de los grandes generadores de impactos ambientales, cuando es mal ejecutado, su manejo puede afectar directamente el desempeño de la obra. Este trabajo tiene como objetivo analizar el sistema de gestión de residuos de una obra, donde a través de un relevamiento de las prácticas de gestión realizadas, identificar los problemas y fuentes generadoras, para luego proponer las acciones necesarias para mejorar su eficiencia. Para este análisis, se utilizó una lista de verificación estructurada con las fases de gestión en el sitio de construcción, con el objetivo de recopilar información que evidencie la inadecuación o ausencia de estas prácticas en la obra estudiada. Los resultados obtenidos demuestran que la falta de supervisión y concientización de las empresas incide directamente en el plan de trabajo, debido a que aún son necesarias muchas acciones para el adecuado manejo de los residuos. Así, con la implantación de un sistema de gestión eficiente, se producirá un aumento en la organización de la obra, reducción de costes, además de la reducción del impacto ambiental provocado en las obras.O setor da construção civil em Teresina encontra-se em crescimento constante, em virtude disso está sendo consumido uma grande quantidade de matéria prima oriunda do meio ambiente, assim como estão sendo gerados grandes quantidades de resíduos. A geração de resíduos provenientes da construção civil (RCC) causam grande preocupação, pois além de ainda ser apresentada como uma das grandes geradoras de impactos ambientais, quando mal executada, sua gestão pode afetar diretamente o desempenho da obra. Este trabalho tem como objetivo analisar o sistema de gestão de resíduos de uma obra, onde por meio de um levantamento das práticas de gestão realizadas, identificar os problemas e fontes geradoras, para então, propor as ações necessárias para a melhoria de sua eficiência. Para essa análise, utilizou-se um checklist estruturado com as fases de gestão no canteiro de obra, com o propósito de colher informações que evidenciem a não adequada ou ausência dessas práticas na obra estudada. Os resultados obtidos demonstram que a falta de fiscalização e conscientização das empresas, afetam diretamente o plano de obra, devido ao fato de que muitas ações ainda são necessárias para uma gestão de resíduos adequada. Assim, com a implantação de um eficiente sistema de gestão, ocorrerá o aumento da organização da obra, redução de custos, além da diminuição do impacto ambiental causado nos canteiros de obras.Research, Society and Development2022-04-17info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://rsdjournal.org/index.php/rsd/article/view/2875810.33448/rsd-v11i5.28758Research, Society and Development; Vol. 11 No. 5; e59311528758Research, Society and Development; Vol. 11 Núm. 5; e59311528758Research, Society and Development; v. 11 n. 5; e593115287582525-3409reponame:Research, Society and Developmentinstname:Universidade Federal de Itajubá (UNIFEI)instacron:UNIFEIporhttps://rsdjournal.org/index.php/rsd/article/view/28758/24892Copyright (c) 2022 Esdras Avelino Leitão Netohttps://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessLeitão Neto, Esdras Avelino2022-04-17T18:18:56Zoai:ojs.pkp.sfu.ca:article/28758Revistahttps://rsdjournal.org/index.php/rsd/indexPUBhttps://rsdjournal.org/index.php/rsd/oairsd.articles@gmail.com2525-34092525-3409opendoar:2024-01-17T09:46:03.028383Research, Society and Development - Universidade Federal de Itajubá (UNIFEI)false
dc.title.none.fl_str_mv Influence of waste management on the construction management plan: a case study in Teresina - PI
Influencia de la gestión de residuos en el plan de dirección de obra: un estudio de caso en Teresina – PI
Influência da gestão de resíduos no plano de gerenciamento de obra: um estudo de caso em Teresina – PI
title Influence of waste management on the construction management plan: a case study in Teresina - PI
spellingShingle Influence of waste management on the construction management plan: a case study in Teresina - PI
Leitão Neto, Esdras Avelino
Resíduos da construção civil
Gestão de resíduos
Impacto ambiental
Ensino.
Construction waste
Waste management
Environmental impact
Teaching.
Residuos de la construcción
Gestión de Residuos
Impacto ambiental
Enseñanza.
title_short Influence of waste management on the construction management plan: a case study in Teresina - PI
title_full Influence of waste management on the construction management plan: a case study in Teresina - PI
title_fullStr Influence of waste management on the construction management plan: a case study in Teresina - PI
title_full_unstemmed Influence of waste management on the construction management plan: a case study in Teresina - PI
title_sort Influence of waste management on the construction management plan: a case study in Teresina - PI
author Leitão Neto, Esdras Avelino
author_facet Leitão Neto, Esdras Avelino
author_role author
dc.contributor.author.fl_str_mv Leitão Neto, Esdras Avelino
dc.subject.por.fl_str_mv Resíduos da construção civil
Gestão de resíduos
Impacto ambiental
Ensino.
Construction waste
Waste management
Environmental impact
Teaching.
Residuos de la construcción
Gestión de Residuos
Impacto ambiental
Enseñanza.
topic Resíduos da construção civil
Gestão de resíduos
Impacto ambiental
Ensino.
Construction waste
Waste management
Environmental impact
Teaching.
Residuos de la construcción
Gestión de Residuos
Impacto ambiental
Enseñanza.
description The construction industry in Teresina is constantly growing, as a result of which a large amount of raw material from the environment is being consumed, as well as large quantities of waste being generated.The generation of waste from construction causes great concern, as it is still presented as one of the great generators of environmental impacts, and when poorly executed, its management can directly affect the performance of the contruction works.The objective of this work is to analyze the waste management system of a work, where, through a survey of the management practices carried out, identify the problems and generating sources, and then propose the necessary actions to improve its efficiency.For this analysis, a structured checklist was used with the phases of management at the construction site, with the purpose of gathering information that shows the not adequate or absence of these practices in the work studied.The results obtained demonstrate that the lack of inspection and awareness of the companies, directly affect the work plan, due to the fact that many actions are still necessary for an adequate waste management.Thus, with the implementation of an efficient management system, there will be an increase in the work organization, cost reduction, and a reduction in the environmental impact caused at construction sites.
publishDate 2022
dc.date.none.fl_str_mv 2022-04-17
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://rsdjournal.org/index.php/rsd/article/view/28758
10.33448/rsd-v11i5.28758
url https://rsdjournal.org/index.php/rsd/article/view/28758
identifier_str_mv 10.33448/rsd-v11i5.28758
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://rsdjournal.org/index.php/rsd/article/view/28758/24892
dc.rights.driver.fl_str_mv Copyright (c) 2022 Esdras Avelino Leitão Neto
https://creativecommons.org/licenses/by/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2022 Esdras Avelino Leitão Neto
https://creativecommons.org/licenses/by/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Research, Society and Development
publisher.none.fl_str_mv Research, Society and Development
dc.source.none.fl_str_mv Research, Society and Development; Vol. 11 No. 5; e59311528758
Research, Society and Development; Vol. 11 Núm. 5; e59311528758
Research, Society and Development; v. 11 n. 5; e59311528758
2525-3409
reponame:Research, Society and Development
instname:Universidade Federal de Itajubá (UNIFEI)
instacron:UNIFEI
instname_str Universidade Federal de Itajubá (UNIFEI)
instacron_str UNIFEI
institution UNIFEI
reponame_str Research, Society and Development
collection Research, Society and Development
repository.name.fl_str_mv Research, Society and Development - Universidade Federal de Itajubá (UNIFEI)
repository.mail.fl_str_mv rsd.articles@gmail.com
_version_ 1797052710537658368