Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM

Detalhes bibliográficos
Autor(a) principal: Novais, Igor Fontes
Data de Publicação: 2011
Outros Autores: Jorge, Eduardo Manoel de Freitas, Junior, Carlos Pereira Costa, Souza, Daniele Tavares
Tipo de documento: Artigo
Idioma: por
Título da fonte: Revista Gestão e Projetos (GeP)
Texto Completo: https://periodicos.uninove.br/gep/article/view/9426
Resumo: The time factor for project managers is one of the most worrisome because of difficulties in keeping projects on time, making interesting use of traditional techniques such as PERT/CPM. Another interesting technique that supports the management of time is the Critical Chain (CCPM) based on the Theory of Constraints (TOC). This article presents the method Optimistic Project Management (GPO) that is based on PERT/CPM and CCPM. The method GPO brings as differential a new way of assembling a schedule, designed to obtain more accurate durations of activities and buffers.
id UNINOVE-4_1ade840d8e62250e9d207d1490556709
oai_identifier_str oai:https://periodicos.uninove.br:article/9426
network_acronym_str UNINOVE-4
network_name_str Revista Gestão e Projetos (GeP)
repository_id_str
spelling Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPMGerenciamento de Projeto Otimista (GPO): Um Método que Integra PERT/CPM à CCPMTheory of Constraints;Optimistic Project Management; Project ManagementThe time factor for project managers is one of the most worrisome because of difficulties in keeping projects on time, making interesting use of traditional techniques such as PERT/CPM. Another interesting technique that supports the management of time is the Critical Chain (CCPM) based on the Theory of Constraints (TOC). This article presents the method Optimistic Project Management (GPO) that is based on PERT/CPM and CCPM. The method GPO brings as differential a new way of assembling a schedule, designed to obtain more accurate durations of activities and buffers.O fator tempo para os gerentes de projetos é um dos pontos mais preocupantes em razão das dificuldades em manter os projetos no prazo previsto, tornando interessante o uso de técnicas tradicionais como PERT/CPM. Outra técnica interessante que apóia a gestão de tempo é a Corrente Crítica (CCPM) baseada na Teoria das Restrições (TOC). Este artigo apresenta o método Gerenciamento de Projeto Otimista (GPO) que é baseado na PERT/CPM e na CCPM. O método GPO traz como diferencial uma nova forma de montagem de um cronograma, visando obter durações de atividades e buffers mais precisas.DOI:10.5585/gep.v2i2.25Universidade Nove de Julho (Uninove)Novais, Igor FontesJorge, Eduardo Manoel de FreitasJunior, Carlos Pereira CostaSouza, Daniele Tavares2011-12-28info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/942610.5585/gep.v2i2.25Revista de Gestão e Projetos; v. 2, n. 2 (2011): julho-dezembro; 150-1652236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9426/4195Direitos autorais 2011 Igor Fontes Novais, Eduardo Manoel de Freitas Jorge, Carlos Pereira Costa Junior, Daniele Tavares Souzainfo:eu-repo/semantics/openAccess2019-05-27T21:06:27Zoai:https://periodicos.uninove.br:article/9426Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:06:27Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false
dc.title.none.fl_str_mv Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
Gerenciamento de Projeto Otimista (GPO): Um Método que Integra PERT/CPM à CCPM
title Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
spellingShingle Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
Novais, Igor Fontes
Theory of Constraints;Optimistic Project Management; Project Management
title_short Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
title_full Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
title_fullStr Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
title_full_unstemmed Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
title_sort Project Management Optimistic (GPO): A Method that Integra Pert / CPM to CCPM
author Novais, Igor Fontes
author_facet Novais, Igor Fontes
Jorge, Eduardo Manoel de Freitas
Junior, Carlos Pereira Costa
Souza, Daniele Tavares
author_role author
author2 Jorge, Eduardo Manoel de Freitas
Junior, Carlos Pereira Costa
Souza, Daniele Tavares
author2_role author
author
author
dc.contributor.none.fl_str_mv
dc.contributor.author.fl_str_mv Novais, Igor Fontes
Jorge, Eduardo Manoel de Freitas
Junior, Carlos Pereira Costa
Souza, Daniele Tavares
dc.subject.none.fl_str_mv
dc.subject.por.fl_str_mv Theory of Constraints;Optimistic Project Management; Project Management
topic Theory of Constraints;Optimistic Project Management; Project Management
description The time factor for project managers is one of the most worrisome because of difficulties in keeping projects on time, making interesting use of traditional techniques such as PERT/CPM. Another interesting technique that supports the management of time is the Critical Chain (CCPM) based on the Theory of Constraints (TOC). This article presents the method Optimistic Project Management (GPO) that is based on PERT/CPM and CCPM. The method GPO brings as differential a new way of assembling a schedule, designed to obtain more accurate durations of activities and buffers.
publishDate 2011
dc.date.none.fl_str_mv 2011-12-28
dc.type.none.fl_str_mv

dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.uninove.br/gep/article/view/9426
10.5585/gep.v2i2.25
url https://periodicos.uninove.br/gep/article/view/9426
identifier_str_mv 10.5585/gep.v2i2.25
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.uninove.br/gep/article/view/9426/4195
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Nove de Julho (Uninove)
publisher.none.fl_str_mv Universidade Nove de Julho (Uninove)
dc.source.none.fl_str_mv Revista de Gestão e Projetos; v. 2, n. 2 (2011): julho-dezembro; 150-165
2236-0972
reponame:Revista Gestão e Projetos (GeP)
instname:Universidade Nove de Julho (UNINOVE)
instacron:UNINOVE
instname_str Universidade Nove de Julho (UNINOVE)
instacron_str UNINOVE
institution UNINOVE
reponame_str Revista Gestão e Projetos (GeP)
collection Revista Gestão e Projetos (GeP)
repository.name.fl_str_mv Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)
repository.mail.fl_str_mv gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br
_version_ 1797052865358856192