Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil
Autor(a) principal: | |
---|---|
Data de Publicação: | 2014 |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Gestão e Projetos (GeP) |
Texto Completo: | https://periodicos.uninove.br/gep/article/view/9600 |
Resumo: | This present study aims to evaluate the Project Management Maturity level in the Design department of a large shipyard in Brazilian Northeast, from the analysis of answers of a questionnaire developed by Prado. For this, the questionnaires were distributed among managers and coordinators and the results were analyzed using tools developed by the author. These results point to a project management maturity level considered weak when compared with other companies in different segments. It was noticed that continuous improvement plans and processes shall be used to compliance with the best practices developed by the PMBOK. |
id |
UNINOVE-4_c5ee40f1973df34a4ad33f701d293a22 |
---|---|
oai_identifier_str |
oai:https://periodicos.uninove.br:article/9600 |
network_acronym_str |
UNINOVE-4 |
network_name_str |
Revista Gestão e Projetos (GeP) |
repository_id_str |
|
spelling |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern BrazilAvaliação do Nível de Maturidade em Gerenciamento de Projetos no Setor de Engenharia de Projetos de um Estaleiro de Grande Porte no Nordeste BrasileiroIndústria Naval; Nível de Maturidade em GP; Metodologia em GP; PradoThis present study aims to evaluate the Project Management Maturity level in the Design department of a large shipyard in Brazilian Northeast, from the analysis of answers of a questionnaire developed by Prado. For this, the questionnaires were distributed among managers and coordinators and the results were analyzed using tools developed by the author. These results point to a project management maturity level considered weak when compared with other companies in different segments. It was noticed that continuous improvement plans and processes shall be used to compliance with the best practices developed by the PMBOK. O presente trabalho visa avaliar o nível de maturidade em gerenciamento de projetos no setor de Engenharia de Projetos de um Estaleiro de grande porte no nordeste brasileiro, a partir da análise das respostas de um questionário desenvolvido por Prado. Para isso os questionários foram distribuídos entre gerentes e coordenadores e os resultados foram analisados através das ferramentas desenvolvidas pelo autor. Esses apontam para um nível de maturidade em gerenciamento de projetos considerado fraco quando comparado com outras empresas de diversos segmentos. Foi constatada a necessidade de planos de melhoria contínua e de processos para o atendimento às boas práticas desenvolvidas pelo PMBOK.Universidade Nove de Julho (Uninove)Oliveira, Joao Paulo Nogueira de2014-12-27info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/960010.5585/gep.v5i3.257Revista de Gestão e Projetos; v. 5, n. 3 (2014): setembro-dezembro; 01-132236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9600/4345Direitos autorais 2015 Joao Paulo Nogueira de Oliveirainfo:eu-repo/semantics/openAccess2019-05-27T21:10:52Zoai:https://periodicos.uninove.br:article/9600Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:10:52Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false |
dc.title.none.fl_str_mv |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil Avaliação do Nível de Maturidade em Gerenciamento de Projetos no Setor de Engenharia de Projetos de um Estaleiro de Grande Porte no Nordeste Brasileiro |
title |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
spellingShingle |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil Oliveira, Joao Paulo Nogueira de Indústria Naval; Nível de Maturidade em GP; Metodologia em GP; Prado |
title_short |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
title_full |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
title_fullStr |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
title_full_unstemmed |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
title_sort |
Level of Maturity in Project Management in Project Engineering Sector Assessment of a Shipyard Porte Great in Northeastern Brazil |
author |
Oliveira, Joao Paulo Nogueira de |
author_facet |
Oliveira, Joao Paulo Nogueira de |
author_role |
author |
dc.contributor.none.fl_str_mv |
|
dc.contributor.author.fl_str_mv |
Oliveira, Joao Paulo Nogueira de |
dc.subject.por.fl_str_mv |
Indústria Naval; Nível de Maturidade em GP; Metodologia em GP; Prado |
topic |
Indústria Naval; Nível de Maturidade em GP; Metodologia em GP; Prado |
description |
This present study aims to evaluate the Project Management Maturity level in the Design department of a large shipyard in Brazilian Northeast, from the analysis of answers of a questionnaire developed by Prado. For this, the questionnaires were distributed among managers and coordinators and the results were analyzed using tools developed by the author. These results point to a project management maturity level considered weak when compared with other companies in different segments. It was noticed that continuous improvement plans and processes shall be used to compliance with the best practices developed by the PMBOK. |
publishDate |
2014 |
dc.date.none.fl_str_mv |
2014-12-27 |
dc.type.none.fl_str_mv |
|
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9600 10.5585/gep.v5i3.257 |
url |
https://periodicos.uninove.br/gep/article/view/9600 |
identifier_str_mv |
10.5585/gep.v5i3.257 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9600/4345 |
dc.rights.driver.fl_str_mv |
Direitos autorais 2015 Joao Paulo Nogueira de Oliveira info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Direitos autorais 2015 Joao Paulo Nogueira de Oliveira |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
dc.source.none.fl_str_mv |
Revista de Gestão e Projetos; v. 5, n. 3 (2014): setembro-dezembro; 01-13 2236-0972 reponame:Revista Gestão e Projetos (GeP) instname:Universidade Nove de Julho (UNINOVE) instacron:UNINOVE |
instname_str |
Universidade Nove de Julho (UNINOVE) |
instacron_str |
UNINOVE |
institution |
UNINOVE |
reponame_str |
Revista Gestão e Projetos (GeP) |
collection |
Revista Gestão e Projetos (GeP) |
repository.name.fl_str_mv |
Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE) |
repository.mail.fl_str_mv |
gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br |
_version_ |
1797052865256095744 |