Analysis of Time Management Applied to a Project of Oil
Autor(a) principal: | |
---|---|
Data de Publicação: | 2010 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Gestão e Projetos (GeP) |
Texto Completo: | https://periodicos.uninove.br/gep/article/view/9408 |
Resumo: | Project management (PM) efficient results in increased probability of success of activities and itscompletion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, anychanges will affect within the scope and increase the cost of the project. This was a case study in alarge company exploiting oil and gas. The research is focused on time management (TM) in an oilproject in order to examine the schedule of activities according to the time tool, the Gantt Chart inMS Project 2003 software. The study design was selected due to its long delay in implementationand lack of planning and managing this. By analyzing the Gantt Chart, activities were identifiedlate. With this, the problems that caused delays were surveyed (the project documents) and theirparents questioned. Thus, it was proposed improvements to an effective control of time on theproblems encountered. |
id |
UNINOVE-4_d9b6b477daa0abaa797e05c35e3c12ed |
---|---|
oai_identifier_str |
oai:https://periodicos.uninove.br:article/9408 |
network_acronym_str |
UNINOVE-4 |
network_name_str |
Revista Gestão e Projetos (GeP) |
repository_id_str |
|
spelling |
Analysis of Time Management Applied to a Project of OilAnálise de Gerenciamento de Tempo Aplicado a um Projeto de PetróleoTime Management; Gantt; DelaysProject management (PM) efficient results in increased probability of success of activities and itscompletion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, anychanges will affect within the scope and increase the cost of the project. This was a case study in alarge company exploiting oil and gas. The research is focused on time management (TM) in an oilproject in order to examine the schedule of activities according to the time tool, the Gantt Chart inMS Project 2003 software. The study design was selected due to its long delay in implementationand lack of planning and managing this. By analyzing the Gantt Chart, activities were identifiedlate. With this, the problems that caused delays were surveyed (the project documents) and theirparents questioned. Thus, it was proposed improvements to an effective control of time on theproblems encountered.Um gerenciamento de projetos eficiente resulta no aumento da probabilidade de sucesso das atividades e de sua finalização conforme prazos, custos e escopo planejados. Como esta tríade (prazo, custo e escopo) é interligada, qualquer alteração no prazo afetará o escopo e aumentará o custo do projeto. Foi feito um estudo de caso em uma grande empresa exploradora de petróleo e gás. A pesquisa está focada no gerenciamento de tempo em um projeto de petróleo, com o intuito de analisar o cronograma de atividades de acordo com a ferramenta de tempo, o Gráfico de Gantt, no software MS Project 2003. O projeto estudado foi selecionado devido ao seu grande atraso em sua execução e à falta de planejamento e gerenciamento deste. Ao analisar o Gráfico de Gantt, foram identificadas atividades atrasadas. Com isso, os problemas que ocasionaram esses atrasos foram pesquisados (nos documentos do projeto) e seus responsáveis questionados. Assim, foram elaboradas propostas de melhorias para um controle do tempo eficaz nos problemas encontrados.Universidade Nove de Julho (Uninove)Moreira, Arielle Meirelesda Silva, Raquel SoaresPalma, Manuel Antonio Molina2010-12-26info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.uninove.br/gep/article/view/940810.5585/gep.v1i2.19Revista de Gestão e Projetos; v. 1, n. 2 (2010): julho-dezembro; 128-1462236-0972reponame:Revista Gestão e Projetos (GeP)instname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEporhttps://periodicos.uninove.br/gep/article/view/9408/4177Direitos autorais 2011 Arielle Meireles Moreira, Raquel Soares da Silva, Manuel Antonio Molina Palmainfo:eu-repo/semantics/openAccess2019-05-27T21:05:35Zoai:https://periodicos.uninove.br:article/9408Revistahttps://periodicos.uninove.br/gepPRIhttps://periodicos.uninove.br/gep/oaigep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br2236-09722236-0972opendoar:2019-05-27T21:05:35Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE)false |
dc.title.none.fl_str_mv |
Analysis of Time Management Applied to a Project of Oil Análise de Gerenciamento de Tempo Aplicado a um Projeto de Petróleo |
title |
Analysis of Time Management Applied to a Project of Oil |
spellingShingle |
Analysis of Time Management Applied to a Project of Oil Moreira, Arielle Meireles Time Management; Gantt; Delays |
title_short |
Analysis of Time Management Applied to a Project of Oil |
title_full |
Analysis of Time Management Applied to a Project of Oil |
title_fullStr |
Analysis of Time Management Applied to a Project of Oil |
title_full_unstemmed |
Analysis of Time Management Applied to a Project of Oil |
title_sort |
Analysis of Time Management Applied to a Project of Oil |
author |
Moreira, Arielle Meireles |
author_facet |
Moreira, Arielle Meireles da Silva, Raquel Soares Palma, Manuel Antonio Molina |
author_role |
author |
author2 |
da Silva, Raquel Soares Palma, Manuel Antonio Molina |
author2_role |
author author |
dc.contributor.none.fl_str_mv |
|
dc.contributor.author.fl_str_mv |
Moreira, Arielle Meireles da Silva, Raquel Soares Palma, Manuel Antonio Molina |
dc.subject.none.fl_str_mv |
|
dc.subject.por.fl_str_mv |
Time Management; Gantt; Delays |
topic |
Time Management; Gantt; Delays |
description |
Project management (PM) efficient results in increased probability of success of activities and itscompletion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, anychanges will affect within the scope and increase the cost of the project. This was a case study in alarge company exploiting oil and gas. The research is focused on time management (TM) in an oilproject in order to examine the schedule of activities according to the time tool, the Gantt Chart inMS Project 2003 software. The study design was selected due to its long delay in implementationand lack of planning and managing this. By analyzing the Gantt Chart, activities were identifiedlate. With this, the problems that caused delays were surveyed (the project documents) and theirparents questioned. Thus, it was proposed improvements to an effective control of time on theproblems encountered. |
publishDate |
2010 |
dc.date.none.fl_str_mv |
2010-12-26 |
dc.type.none.fl_str_mv |
|
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9408 10.5585/gep.v1i2.19 |
url |
https://periodicos.uninove.br/gep/article/view/9408 |
identifier_str_mv |
10.5585/gep.v1i2.19 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.uninove.br/gep/article/view/9408/4177 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
publisher.none.fl_str_mv |
Universidade Nove de Julho (Uninove) |
dc.source.none.fl_str_mv |
Revista de Gestão e Projetos; v. 1, n. 2 (2010): julho-dezembro; 128-146 2236-0972 reponame:Revista Gestão e Projetos (GeP) instname:Universidade Nove de Julho (UNINOVE) instacron:UNINOVE |
instname_str |
Universidade Nove de Julho (UNINOVE) |
instacron_str |
UNINOVE |
institution |
UNINOVE |
reponame_str |
Revista Gestão e Projetos (GeP) |
collection |
Revista Gestão e Projetos (GeP) |
repository.name.fl_str_mv |
Revista Gestão e Projetos (GeP) - Universidade Nove de Julho (UNINOVE) |
repository.mail.fl_str_mv |
gep@uninove.br || editor@revistagep.org || crismonteiro@uninove.br |
_version_ |
1797052865699643392 |