Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil

Detalhes bibliográficos
Autor(a) principal: De Oliveira, Ualison Rébula
Data de Publicação: 2023
Outros Autores: de Souza, Hilda Anatiely Donato, Menezes, Carlos Augusto Gabriel [UNESP], Rocha, Henrique Martins
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Institucional da UNESP
Texto Completo: http://dx.doi.org/10.1007/s12063-023-00368-x
http://hdl.handle.net/11449/247249
Resumo: Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.
id UNSP_856ea8d2049c7449840818c9430ae90e
oai_identifier_str oai:repositorio.unesp.br:11449/247249
network_acronym_str UNSP
network_name_str Repositório Institucional da UNESP
repository_id_str 2946
spelling Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in BrazilAnalytic Hierarchy processEquipment availabilityMaintenance plansMulticriteria decisionPeriodicityPreventive maintenanceEquipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.Universidade Federal Fluminense (UFF) / MPA-PPGA MSG and PPSIG, 783 Des. Ellis Hermydio Figueira StUniversidade Federal Fluminense (UFF), 783 Desembargador Ellis Hermydio Figueira StUniversidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São PauloUniversidade do Estado do Rio de Janeiro (UERJ), Rodovia Presidente Dutra Km 298, Rio de JaneiroUniversidade Estadual Júlio de Mesquita Filho (UNESP), 333 Dr. Ariberto Pereira da Cunha, São PauloUniversidade Federal Fluminense (UFF)Universidade Estadual Paulista (UNESP)Universidade do Estado do Rio de Janeiro (UERJ)De Oliveira, Ualison Rébulade Souza, Hilda Anatiely DonatoMenezes, Carlos Augusto Gabriel [UNESP]Rocha, Henrique Martins2023-07-29T13:10:51Z2023-07-29T13:10:51Z2023-01-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articlehttp://dx.doi.org/10.1007/s12063-023-00368-xOperations Management Research.1936-97431936-9735http://hdl.handle.net/11449/24724910.1007/s12063-023-00368-x2-s2.0-85153751736Scopusreponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengOperations Management Researchinfo:eu-repo/semantics/openAccess2023-07-29T13:10:51Zoai:repositorio.unesp.br:11449/247249Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T14:42:43.877496Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false
dc.title.none.fl_str_mv Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
title Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
spellingShingle Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
De Oliveira, Ualison Rébula
Analytic Hierarchy process
Equipment availability
Maintenance plans
Multicriteria decision
Periodicity
Preventive maintenance
title_short Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
title_full Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
title_fullStr Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
title_full_unstemmed Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
title_sort Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil
author De Oliveira, Ualison Rébula
author_facet De Oliveira, Ualison Rébula
de Souza, Hilda Anatiely Donato
Menezes, Carlos Augusto Gabriel [UNESP]
Rocha, Henrique Martins
author_role author
author2 de Souza, Hilda Anatiely Donato
Menezes, Carlos Augusto Gabriel [UNESP]
Rocha, Henrique Martins
author2_role author
author
author
dc.contributor.none.fl_str_mv Universidade Federal Fluminense (UFF)
Universidade Estadual Paulista (UNESP)
Universidade do Estado do Rio de Janeiro (UERJ)
dc.contributor.author.fl_str_mv De Oliveira, Ualison Rébula
de Souza, Hilda Anatiely Donato
Menezes, Carlos Augusto Gabriel [UNESP]
Rocha, Henrique Martins
dc.subject.por.fl_str_mv Analytic Hierarchy process
Equipment availability
Maintenance plans
Multicriteria decision
Periodicity
Preventive maintenance
topic Analytic Hierarchy process
Equipment availability
Maintenance plans
Multicriteria decision
Periodicity
Preventive maintenance
description Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.
publishDate 2023
dc.date.none.fl_str_mv 2023-07-29T13:10:51Z
2023-07-29T13:10:51Z
2023-01-01
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://dx.doi.org/10.1007/s12063-023-00368-x
Operations Management Research.
1936-9743
1936-9735
http://hdl.handle.net/11449/247249
10.1007/s12063-023-00368-x
2-s2.0-85153751736
url http://dx.doi.org/10.1007/s12063-023-00368-x
http://hdl.handle.net/11449/247249
identifier_str_mv Operations Management Research.
1936-9743
1936-9735
10.1007/s12063-023-00368-x
2-s2.0-85153751736
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv Operations Management Research
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.source.none.fl_str_mv Scopus
reponame:Repositório Institucional da UNESP
instname:Universidade Estadual Paulista (UNESP)
instacron:UNESP
instname_str Universidade Estadual Paulista (UNESP)
instacron_str UNESP
institution UNESP
reponame_str Repositório Institucional da UNESP
collection Repositório Institucional da UNESP
repository.name.fl_str_mv Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)
repository.mail.fl_str_mv
_version_ 1808128407974707200