Multiobjective multistage distribution system planning using tabu search
Autor(a) principal: | |
---|---|
Data de Publicação: | 2014 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UNESP |
Texto Completo: | http://dx.doi.org/10.1049/iet-gtd.2013.0115 http://hdl.handle.net/11449/171478 |
Resumo: | This study presents a multiobjective tabu search algorithm to solve the multistage planning problem of a distribution system formulated as a multiobjective dynamic mixed integer non-linear programming problem. Multiobjective problems do not have a specific solution, but a set of solutions that allows us to observe the trade-off among the analysed objectives. Taking into account this concept, the objective functions of the model proposed in this study are: costs (investment and operational) and reliability. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalising switches and construction of tie lines. The system's reliability is evaluated by means of the non-supplied energy under contingencies using the n-1 criterion. By line switching and the use of tie lines, part of the loads affected by a contingency can be restored, thus, the non-supplied energy can be evaluatedby solving a distribution network restoration problem. Numerical results are presented for a 54-bus system. © 2013 The Institution of Engineering and Technology. |
id |
UNSP_96d47546d4eb057bcf370f791ad4b685 |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/171478 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
Multiobjective multistage distribution system planning using tabu searchThis study presents a multiobjective tabu search algorithm to solve the multistage planning problem of a distribution system formulated as a multiobjective dynamic mixed integer non-linear programming problem. Multiobjective problems do not have a specific solution, but a set of solutions that allows us to observe the trade-off among the analysed objectives. Taking into account this concept, the objective functions of the model proposed in this study are: costs (investment and operational) and reliability. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalising switches and construction of tie lines. The system's reliability is evaluated by means of the non-supplied energy under contingencies using the n-1 criterion. By line switching and the use of tie lines, part of the loads affected by a contingency can be restored, thus, the non-supplied energy can be evaluatedby solving a distribution network restoration problem. Numerical results are presented for a 54-bus system. © 2013 The Institution of Engineering and Technology.Electrical Engineering Departament São Paulo State University UNESP, Ilha SolteiraMathematical Departament São Paulo State University UNESP, Ilha SolteiraE.T.S Ingenieros Industriales University of Castilla-La Mancha, Ciudad RealElectrical Engineering Departament São Paulo State University UNESP, Ilha SolteiraMathematical Departament São Paulo State University UNESP, Ilha SolteiraUniversidade Estadual Paulista (Unesp)University of Castilla-La ManchaPereira Junior, Benvindo Rodrigues [UNESP]Cossi, Antonio Marcos [UNESP]Contreras, JavierMantovani, José Roberto Sanches [UNESP]2018-12-11T16:55:29Z2018-12-11T16:55:29Z2014-01-30info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article35-45application/pdfhttp://dx.doi.org/10.1049/iet-gtd.2013.0115IET Generation, Transmission and Distribution, v. 8, n. 1, p. 35-45, 2014.1751-8687http://hdl.handle.net/11449/17147810.1049/iet-gtd.2013.01152-s2.0-848930084722-s2.0-84893008472.pdfScopusreponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengIET Generation, Transmission and Distribution0,907info:eu-repo/semantics/openAccess2024-07-10T15:41:53Zoai:repositorio.unesp.br:11449/171478Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestopendoar:29462024-08-05T23:41:23.145967Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
Multiobjective multistage distribution system planning using tabu search |
title |
Multiobjective multistage distribution system planning using tabu search |
spellingShingle |
Multiobjective multistage distribution system planning using tabu search Pereira Junior, Benvindo Rodrigues [UNESP] |
title_short |
Multiobjective multistage distribution system planning using tabu search |
title_full |
Multiobjective multistage distribution system planning using tabu search |
title_fullStr |
Multiobjective multistage distribution system planning using tabu search |
title_full_unstemmed |
Multiobjective multistage distribution system planning using tabu search |
title_sort |
Multiobjective multistage distribution system planning using tabu search |
author |
Pereira Junior, Benvindo Rodrigues [UNESP] |
author_facet |
Pereira Junior, Benvindo Rodrigues [UNESP] Cossi, Antonio Marcos [UNESP] Contreras, Javier Mantovani, José Roberto Sanches [UNESP] |
author_role |
author |
author2 |
Cossi, Antonio Marcos [UNESP] Contreras, Javier Mantovani, José Roberto Sanches [UNESP] |
author2_role |
author author author |
dc.contributor.none.fl_str_mv |
Universidade Estadual Paulista (Unesp) University of Castilla-La Mancha |
dc.contributor.author.fl_str_mv |
Pereira Junior, Benvindo Rodrigues [UNESP] Cossi, Antonio Marcos [UNESP] Contreras, Javier Mantovani, José Roberto Sanches [UNESP] |
description |
This study presents a multiobjective tabu search algorithm to solve the multistage planning problem of a distribution system formulated as a multiobjective dynamic mixed integer non-linear programming problem. Multiobjective problems do not have a specific solution, but a set of solutions that allows us to observe the trade-off among the analysed objectives. Taking into account this concept, the objective functions of the model proposed in this study are: costs (investment and operational) and reliability. The actions deemed in this model for each period of the planning horizon are: increase in the capacity of existing substations (or construction of new ones), exchange of cables in existing lines (and construction of new feeders), reconfiguration of the network, allocation of sectionalising switches and construction of tie lines. The system's reliability is evaluated by means of the non-supplied energy under contingencies using the n-1 criterion. By line switching and the use of tie lines, part of the loads affected by a contingency can be restored, thus, the non-supplied energy can be evaluatedby solving a distribution network restoration problem. Numerical results are presented for a 54-bus system. © 2013 The Institution of Engineering and Technology. |
publishDate |
2014 |
dc.date.none.fl_str_mv |
2014-01-30 2018-12-11T16:55:29Z 2018-12-11T16:55:29Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://dx.doi.org/10.1049/iet-gtd.2013.0115 IET Generation, Transmission and Distribution, v. 8, n. 1, p. 35-45, 2014. 1751-8687 http://hdl.handle.net/11449/171478 10.1049/iet-gtd.2013.0115 2-s2.0-84893008472 2-s2.0-84893008472.pdf |
url |
http://dx.doi.org/10.1049/iet-gtd.2013.0115 http://hdl.handle.net/11449/171478 |
identifier_str_mv |
IET Generation, Transmission and Distribution, v. 8, n. 1, p. 35-45, 2014. 1751-8687 10.1049/iet-gtd.2013.0115 2-s2.0-84893008472 2-s2.0-84893008472.pdf |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
IET Generation, Transmission and Distribution 0,907 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
35-45 application/pdf |
dc.source.none.fl_str_mv |
Scopus reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
|
_version_ |
1808129543844659200 |