Success factors in the implementation of statistical process control: action research in a chemical plant
Autor(a) principal: | |
---|---|
Data de Publicação: | 2017 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Production |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312 |
Resumo: | Abstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that contribute to the success of the SPC and through an action research was implemented a control chart in a chemical plant using these factors. The attention to CSF during planning, implementation and the discussion with the process team resulted in the implementation and acceptance of control charts by the operational teams of the company, with continuing indications of use. The results enabled a framework to apply control charts based on CSF. |
id |
ABEPRO-1_2024d3e1f971b2a564953455cc5aee9c |
---|---|
oai_identifier_str |
oai:scielo:S0103-65132017000100312 |
network_acronym_str |
ABEPRO-1 |
network_name_str |
Production |
repository_id_str |
|
spelling |
Success factors in the implementation of statistical process control: action research in a chemical plantControl chartsCritical success factorsImplementationStatistical process controlAbstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that contribute to the success of the SPC and through an action research was implemented a control chart in a chemical plant using these factors. The attention to CSF during planning, implementation and the discussion with the process team resulted in the implementation and acceptance of control charts by the operational teams of the company, with continuing indications of use. The results enabled a framework to apply control charts based on CSF.Associação Brasileira de Engenharia de Produção2017-01-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312Production v.27 2017reponame:Productioninstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPRO10.1590/0103-6513.220816info:eu-repo/semantics/openAccessToledo,Jose Carlos deLizarelli,Fabiane LetíciaSantana Junior,Manoel Bispoeng2017-06-05T00:00:00Zoai:scielo:S0103-65132017000100312Revistahttps://www.scielo.br/j/prod/https://old.scielo.br/oai/scielo-oai.php||production@editoracubo.com.br1980-54110103-6513opendoar:2017-06-05T00:00Production - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title |
Success factors in the implementation of statistical process control: action research in a chemical plant |
spellingShingle |
Success factors in the implementation of statistical process control: action research in a chemical plant Toledo,Jose Carlos de Control charts Critical success factors Implementation Statistical process control |
title_short |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_full |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_fullStr |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_full_unstemmed |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_sort |
Success factors in the implementation of statistical process control: action research in a chemical plant |
author |
Toledo,Jose Carlos de |
author_facet |
Toledo,Jose Carlos de Lizarelli,Fabiane Letícia Santana Junior,Manoel Bispo |
author_role |
author |
author2 |
Lizarelli,Fabiane Letícia Santana Junior,Manoel Bispo |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Toledo,Jose Carlos de Lizarelli,Fabiane Letícia Santana Junior,Manoel Bispo |
dc.subject.por.fl_str_mv |
Control charts Critical success factors Implementation Statistical process control |
topic |
Control charts Critical success factors Implementation Statistical process control |
description |
Abstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that contribute to the success of the SPC and through an action research was implemented a control chart in a chemical plant using these factors. The attention to CSF during planning, implementation and the discussion with the process team resulted in the implementation and acceptance of control charts by the operational teams of the company, with continuing indications of use. The results enabled a framework to apply control charts based on CSF. |
publishDate |
2017 |
dc.date.none.fl_str_mv |
2017-01-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/0103-6513.220816 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Production v.27 2017 reponame:Production instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Production |
collection |
Production |
repository.name.fl_str_mv |
Production - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||production@editoracubo.com.br |
_version_ |
1754213154101919744 |