Texto Completo: https://bjopm.org.br/bjopm/article/view/360
Resumo: Standardized work is an effective way for process improvement, specially when it is applied to manual tasks such as assembly lines. This tool is part of Toyota Production System and based on wastes reduction. Thus, the objectives were to implement standardized work in a medium chassis assembly line and measure the benefis from optimization of operators’ tasks and movement through waste reduction. In order to achieve these results, a single case study was performed in a medium chassis assembly line that is part of a company in South Brazil. The steps involved: defining the object of study; time measurement and takt time definition; creating a production capacity sheet; defining the minimum number of operators and balancing the line; determining minimum work in process; defining the new layout; creating a standardized operations sheet and a standardized operations routine sheet; training and implementing standardized work; and verifying the results. Results show 36 minutes reduction in terms of assembly time and 200 meters reduction in terms of operators’ movement on average. Other contributions regard the 9.6% reduction in terms of the assembly line downtime.
id ABEPRO_63e345f2d8f92cdb57bf156e92f65c54
oai_identifier_str oai:ojs.bjopm.org.br:article/360
network_acronym_str ABEPRO
network_name_str Brazilian Journal of Operations & Production Management (Online)
repository_id_str
spelling Improvement based on standardized work: an implementation case studyStandardized workWaste reductionProcess optimizationToyota Production SystemMedium chassis assembly line.Standardized work is an effective way for process improvement, specially when it is applied to manual tasks such as assembly lines. This tool is part of Toyota Production System and based on wastes reduction. Thus, the objectives were to implement standardized work in a medium chassis assembly line and measure the benefis from optimization of operators’ tasks and movement through waste reduction. In order to achieve these results, a single case study was performed in a medium chassis assembly line that is part of a company in South Brazil. The steps involved: defining the object of study; time measurement and takt time definition; creating a production capacity sheet; defining the minimum number of operators and balancing the line; determining minimum work in process; defining the new layout; creating a standardized operations sheet and a standardized operations routine sheet; training and implementing standardized work; and verifying the results. Results show 36 minutes reduction in terms of assembly time and 200 meters reduction in terms of operators’ movement on average. Other contributions regard the 9.6% reduction in terms of the assembly line downtime.Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)2017-09-06info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer-reviewed ArticleCase studytext/htmlapplication/pdfhttps://bjopm.org.br/bjopm/article/view/36010.14488/BJOPM.2017.v14.n3.a12Brazilian Journal of Operations & Production Management; Vol. 14 No. 3 (2017): September, 2017; 388-3952237-8960reponame:Brazilian Journal of Operations & Production Management (Online)instname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROenghttps://bjopm.org.br/bjopm/article/view/360/300https://bjopm.org.br/bjopm/article/view/360/311Copyright (c) 2017 Brazilian Journal of Operations & Production Managementinfo:eu-repo/semantics/openAccessFin, Julio CesarVidor, GabrielCecconello, IvandroMachado, Vanessa de Campos2021-07-13T14:14:49Zoai:ojs.bjopm.org.br:article/360Revistahttps://bjopm.org.br/bjopmONGhttps://bjopm.org.br/bjopm/oaibjopm.journal@gmail.com2237-89601679-8171opendoar:2023-03-13T09:45:14.013651Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)false
dc.title.none.fl_str_mv Improvement based on standardized work: an implementation case study
title Improvement based on standardized work: an implementation case study
spellingShingle Improvement based on standardized work: an implementation case study
Fin, Julio Cesar
Standardized work
Waste reduction
Process optimization
Toyota Production System
Medium chassis assembly line.
title_short Improvement based on standardized work: an implementation case study
title_full Improvement based on standardized work: an implementation case study
title_fullStr Improvement based on standardized work: an implementation case study
title_full_unstemmed Improvement based on standardized work: an implementation case study
title_sort Improvement based on standardized work: an implementation case study
author Fin, Julio Cesar
author_facet Fin, Julio Cesar
Vidor, Gabriel
Cecconello, Ivandro
Machado, Vanessa de Campos
author_role author
author2 Vidor, Gabriel
Cecconello, Ivandro
Machado, Vanessa de Campos
author2_role author
author
author
dc.contributor.author.fl_str_mv Fin, Julio Cesar
Vidor, Gabriel
Cecconello, Ivandro
Machado, Vanessa de Campos
dc.subject.por.fl_str_mv Standardized work
Waste reduction
Process optimization
Toyota Production System
Medium chassis assembly line.
topic Standardized work
Waste reduction
Process optimization
Toyota Production System
Medium chassis assembly line.
description Standardized work is an effective way for process improvement, specially when it is applied to manual tasks such as assembly lines. This tool is part of Toyota Production System and based on wastes reduction. Thus, the objectives were to implement standardized work in a medium chassis assembly line and measure the benefis from optimization of operators’ tasks and movement through waste reduction. In order to achieve these results, a single case study was performed in a medium chassis assembly line that is part of a company in South Brazil. The steps involved: defining the object of study; time measurement and takt time definition; creating a production capacity sheet; defining the minimum number of operators and balancing the line; determining minimum work in process; defining the new layout; creating a standardized operations sheet and a standardized operations routine sheet; training and implementing standardized work; and verifying the results. Results show 36 minutes reduction in terms of assembly time and 200 meters reduction in terms of operators’ movement on average. Other contributions regard the 9.6% reduction in terms of the assembly line downtime.
publishDate 2017
dc.date.none.fl_str_mv 2017-09-06
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Peer-reviewed Article
Case study
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://bjopm.org.br/bjopm/article/view/360
10.14488/BJOPM.2017.v14.n3.a12
url https://bjopm.org.br/bjopm/article/view/360
identifier_str_mv 10.14488/BJOPM.2017.v14.n3.a12
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv https://bjopm.org.br/bjopm/article/view/360/300
https://bjopm.org.br/bjopm/article/view/360/311
dc.rights.driver.fl_str_mv Copyright (c) 2017 Brazilian Journal of Operations & Production Management
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2017 Brazilian Journal of Operations & Production Management
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
application/pdf
dc.publisher.none.fl_str_mv Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)
publisher.none.fl_str_mv Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)
dc.source.none.fl_str_mv Brazilian Journal of Operations & Production Management; Vol. 14 No. 3 (2017): September, 2017; 388-395
2237-8960
reponame:Brazilian Journal of Operations & Production Management (Online)
instname:Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron:ABEPRO
instname_str Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron_str ABEPRO
institution ABEPRO
reponame_str Brazilian Journal of Operations & Production Management (Online)
collection Brazilian Journal of Operations & Production Management (Online)
repository.name.fl_str_mv Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)
repository.mail.fl_str_mv bjopm.journal@gmail.com
_version_ 1797051460543840256