Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
Autor(a) principal: | |
---|---|
Data de Publicação: | 2016 |
Outros Autores: | , , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Independent Journal of Management & Production |
Texto Completo: | http://www.ijmp.jor.br/index.php/ijmp/article/view/423 |
Resumo: | The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time. In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations. When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost. |
id |
IJMP_7de5b96a870881df884ff7c00de0068b |
---|---|
oai_identifier_str |
oai:www.ijmp.jor.br:article/423 |
network_acronym_str |
IJMP |
network_name_str |
Independent Journal of Management & Production |
repository_id_str |
|
spelling |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technicalNetwork DiagramDeterministic EstimativePath CriticalSlack of ActivitiesMachinery IndustryThe PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time. In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations. When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.Independent2016-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://www.ijmp.jor.br/index.php/ijmp/article/view/42310.14807/ijmp.v7i3.423Independent Journal of Management & Production; Vol. 7 No. 3 (2016): Independent Journal of Management & Production; 833-8532236-269X2236-269Xreponame:Independent Journal of Management & Productioninstname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)instacron:IJM&Penghttp://www.ijmp.jor.br/index.php/ijmp/article/view/423/534http://www.ijmp.jor.br/index.php/ijmp/article/view/423/570Copyright (c) 2016 Márcia de Fatima Morais, Fernando Henrique Lermen, Camila Matos, Rodrigo Röder, Celise Röderinfo:eu-repo/semantics/openAccessLermen, Fernando HenriqueMorais, Márcia de FátimaMatos, CamilaRöder, RodrigoRöder, Celise2018-09-04T13:06:52Zoai:www.ijmp.jor.br:article/423Revistahttp://www.ijmp.jor.br/PUBhttp://www.ijmp.jor.br/index.php/ijmp/oaiijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||2236-269X2236-269Xopendoar:2018-09-04T13:06:52Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)false |
dc.title.none.fl_str_mv |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
title |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
spellingShingle |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical Lermen, Fernando Henrique Network Diagram Deterministic Estimative Path Critical Slack of Activities Machinery Industry |
title_short |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
title_full |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
title_fullStr |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
title_full_unstemmed |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
title_sort |
Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical |
author |
Lermen, Fernando Henrique |
author_facet |
Lermen, Fernando Henrique Morais, Márcia de Fátima Matos, Camila Röder, Rodrigo Röder, Celise |
author_role |
author |
author2 |
Morais, Márcia de Fátima Matos, Camila Röder, Rodrigo Röder, Celise |
author2_role |
author author author author |
dc.contributor.author.fl_str_mv |
Lermen, Fernando Henrique Morais, Márcia de Fátima Matos, Camila Röder, Rodrigo Röder, Celise |
dc.subject.por.fl_str_mv |
Network Diagram Deterministic Estimative Path Critical Slack of Activities Machinery Industry |
topic |
Network Diagram Deterministic Estimative Path Critical Slack of Activities Machinery Industry |
description |
The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time. In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations. When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost. |
publishDate |
2016 |
dc.date.none.fl_str_mv |
2016-09-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/423 10.14807/ijmp.v7i3.423 |
url |
http://www.ijmp.jor.br/index.php/ijmp/article/view/423 |
identifier_str_mv |
10.14807/ijmp.v7i3.423 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/423/534 http://www.ijmp.jor.br/index.php/ijmp/article/view/423/570 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf text/html |
dc.publisher.none.fl_str_mv |
Independent |
publisher.none.fl_str_mv |
Independent |
dc.source.none.fl_str_mv |
Independent Journal of Management & Production; Vol. 7 No. 3 (2016): Independent Journal of Management & Production; 833-853 2236-269X 2236-269X reponame:Independent Journal of Management & Production instname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) instacron:IJM&P |
instname_str |
Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
instacron_str |
IJM&P |
institution |
IJM&P |
reponame_str |
Independent Journal of Management & Production |
collection |
Independent Journal of Management & Production |
repository.name.fl_str_mv |
Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
repository.mail.fl_str_mv |
ijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br|| |
_version_ |
1797220490917445632 |