Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical

Detalhes bibliográficos
Autor(a) principal: Lermen, Fernando Henrique
Data de Publicação: 2016
Outros Autores: Morais, Márcia de Fátima, Matos, Camila, Röder, Rodrigo, Röder, Celise
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Independent Journal of Management & Production
Texto Completo: http://www.ijmp.jor.br/index.php/ijmp/article/view/423
Resumo: The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.
id IJMP_7de5b96a870881df884ff7c00de0068b
oai_identifier_str oai:www.ijmp.jor.br:article/423
network_acronym_str IJMP
network_name_str Independent Journal of Management & Production
repository_id_str
spelling Optimization of times and costs of project of horizontal laminator production using PERT/CPM technicalNetwork DiagramDeterministic EstimativePath CriticalSlack of ActivitiesMachinery IndustryThe PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.Independent2016-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://www.ijmp.jor.br/index.php/ijmp/article/view/42310.14807/ijmp.v7i3.423Independent Journal of Management & Production; Vol. 7 No. 3 (2016): Independent Journal of Management & Production; 833-8532236-269X2236-269Xreponame:Independent Journal of Management & Productioninstname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)instacron:IJM&Penghttp://www.ijmp.jor.br/index.php/ijmp/article/view/423/534http://www.ijmp.jor.br/index.php/ijmp/article/view/423/570Copyright (c) 2016 Márcia de Fatima Morais, Fernando Henrique Lermen, Camila Matos, Rodrigo Röder, Celise Röderinfo:eu-repo/semantics/openAccessLermen, Fernando HenriqueMorais, Márcia de FátimaMatos, CamilaRöder, RodrigoRöder, Celise2018-09-04T13:06:52Zoai:www.ijmp.jor.br:article/423Revistahttp://www.ijmp.jor.br/PUBhttp://www.ijmp.jor.br/index.php/ijmp/oaiijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||2236-269X2236-269Xopendoar:2018-09-04T13:06:52Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)false
dc.title.none.fl_str_mv Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
title Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
spellingShingle Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
Lermen, Fernando Henrique
Network Diagram
Deterministic Estimative
Path Critical
Slack of Activities
Machinery Industry
title_short Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
title_full Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
title_fullStr Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
title_full_unstemmed Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
title_sort Optimization of times and costs of project of horizontal laminator production using PERT/CPM technical
author Lermen, Fernando Henrique
author_facet Lermen, Fernando Henrique
Morais, Márcia de Fátima
Matos, Camila
Röder, Rodrigo
Röder, Celise
author_role author
author2 Morais, Márcia de Fátima
Matos, Camila
Röder, Rodrigo
Röder, Celise
author2_role author
author
author
author
dc.contributor.author.fl_str_mv Lermen, Fernando Henrique
Morais, Márcia de Fátima
Matos, Camila
Röder, Rodrigo
Röder, Celise
dc.subject.por.fl_str_mv Network Diagram
Deterministic Estimative
Path Critical
Slack of Activities
Machinery Industry
topic Network Diagram
Deterministic Estimative
Path Critical
Slack of Activities
Machinery Industry
description The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.
publishDate 2016
dc.date.none.fl_str_mv 2016-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://www.ijmp.jor.br/index.php/ijmp/article/view/423
10.14807/ijmp.v7i3.423
url http://www.ijmp.jor.br/index.php/ijmp/article/view/423
identifier_str_mv 10.14807/ijmp.v7i3.423
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv http://www.ijmp.jor.br/index.php/ijmp/article/view/423/534
http://www.ijmp.jor.br/index.php/ijmp/article/view/423/570
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
text/html
dc.publisher.none.fl_str_mv Independent
publisher.none.fl_str_mv Independent
dc.source.none.fl_str_mv Independent Journal of Management & Production; Vol. 7 No. 3 (2016): Independent Journal of Management & Production; 833-853
2236-269X
2236-269X
reponame:Independent Journal of Management & Production
instname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
instacron:IJM&P
instname_str Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
instacron_str IJM&P
institution IJM&P
reponame_str Independent Journal of Management & Production
collection Independent Journal of Management & Production
repository.name.fl_str_mv Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
repository.mail.fl_str_mv ijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||
_version_ 1797220490917445632