Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry
Autor(a) principal: | |
---|---|
Data de Publicação: | 2015 |
Outros Autores: | , , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Acta scientiarum. Technology (Online) |
Texto Completo: | http://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/27869 |
Resumo: | This paper presents a discrete event simulation employed in a Brazilian automotive company. There was a huge waste caused by one family scrap. It was believed one reason was the company functional layout. In this case, changing from current to cellular layout, employee synergy and knowledge about this family would increase. Due to the complexity for dimensioning a new cellular layout, mainly because of batch size and client’s demand variation. In this case, discrete event simulation was used, which made possible to introduce those effects improving accuracy in final results. This accuracy will be shown by comparing results obtained with simulation and without it (as company used to do). To conclude, cellular layout was responsible for increasing 15% of productivity, reducing lead-time in 7 days and scrap in 15% for this family. |
id |
UEM-6_59675cb227b094549f4bc77b99627ddb |
---|---|
oai_identifier_str |
oai:periodicos.uem.br/ojs:article/27869 |
network_acronym_str |
UEM-6 |
network_name_str |
Acta scientiarum. Technology (Online) |
repository_id_str |
|
spelling |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industryproductivityefficiencyscraplead-time.Engenharia de ProduçãoThis paper presents a discrete event simulation employed in a Brazilian automotive company. There was a huge waste caused by one family scrap. It was believed one reason was the company functional layout. In this case, changing from current to cellular layout, employee synergy and knowledge about this family would increase. Due to the complexity for dimensioning a new cellular layout, mainly because of batch size and client’s demand variation. In this case, discrete event simulation was used, which made possible to introduce those effects improving accuracy in final results. This accuracy will be shown by comparing results obtained with simulation and without it (as company used to do). To conclude, cellular layout was responsible for increasing 15% of productivity, reducing lead-time in 7 days and scrap in 15% for this family.Universidade Estadual De Maringá2015-07-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionSimulação a eventos discretosapplication/pdfhttp://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/2786910.4025/actascitechnol.v37i3.27869Acta Scientiarum. Technology; Vol 37 No 3 (2015); 371-378Acta Scientiarum. Technology; v. 37 n. 3 (2015); 371-3781806-25631807-8664reponame:Acta scientiarum. Technology (Online)instname:Universidade Estadual de Maringá (UEM)instacron:UEMenghttp://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/27869/pdf_101Maurício, Thiago BuselatoMontevechi, José Arnaldo BarraLeal, FabianoMiranda, Rafael de CarvalhoLombardi, Fabrícioinfo:eu-repo/semantics/openAccess2015-09-11T09:21:42Zoai:periodicos.uem.br/ojs:article/27869Revistahttps://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/indexPUBhttps://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/oai||actatech@uem.br1807-86641806-2563opendoar:2015-09-11T09:21:42Acta scientiarum. Technology (Online) - Universidade Estadual de Maringá (UEM)false |
dc.title.none.fl_str_mv |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
title |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
spellingShingle |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry Maurício, Thiago Buselato productivity efficiency scrap lead-time. Engenharia de Produção |
title_short |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
title_full |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
title_fullStr |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
title_full_unstemmed |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
title_sort |
Using discrete event simulation to change from a functional layout to a cellular layout in an auto parts industry |
author |
Maurício, Thiago Buselato |
author_facet |
Maurício, Thiago Buselato Montevechi, José Arnaldo Barra Leal, Fabiano Miranda, Rafael de Carvalho Lombardi, Fabrício |
author_role |
author |
author2 |
Montevechi, José Arnaldo Barra Leal, Fabiano Miranda, Rafael de Carvalho Lombardi, Fabrício |
author2_role |
author author author author |
dc.contributor.author.fl_str_mv |
Maurício, Thiago Buselato Montevechi, José Arnaldo Barra Leal, Fabiano Miranda, Rafael de Carvalho Lombardi, Fabrício |
dc.subject.por.fl_str_mv |
productivity efficiency scrap lead-time. Engenharia de Produção |
topic |
productivity efficiency scrap lead-time. Engenharia de Produção |
description |
This paper presents a discrete event simulation employed in a Brazilian automotive company. There was a huge waste caused by one family scrap. It was believed one reason was the company functional layout. In this case, changing from current to cellular layout, employee synergy and knowledge about this family would increase. Due to the complexity for dimensioning a new cellular layout, mainly because of batch size and client’s demand variation. In this case, discrete event simulation was used, which made possible to introduce those effects improving accuracy in final results. This accuracy will be shown by comparing results obtained with simulation and without it (as company used to do). To conclude, cellular layout was responsible for increasing 15% of productivity, reducing lead-time in 7 days and scrap in 15% for this family. |
publishDate |
2015 |
dc.date.none.fl_str_mv |
2015-07-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Simulação a eventos discretos |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/27869 10.4025/actascitechnol.v37i3.27869 |
url |
http://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/27869 |
identifier_str_mv |
10.4025/actascitechnol.v37i3.27869 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
http://www.periodicos.uem.br/ojs/index.php/ActaSciTechnol/article/view/27869/pdf_101 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Estadual De Maringá |
publisher.none.fl_str_mv |
Universidade Estadual De Maringá |
dc.source.none.fl_str_mv |
Acta Scientiarum. Technology; Vol 37 No 3 (2015); 371-378 Acta Scientiarum. Technology; v. 37 n. 3 (2015); 371-378 1806-2563 1807-8664 reponame:Acta scientiarum. Technology (Online) instname:Universidade Estadual de Maringá (UEM) instacron:UEM |
instname_str |
Universidade Estadual de Maringá (UEM) |
instacron_str |
UEM |
institution |
UEM |
reponame_str |
Acta scientiarum. Technology (Online) |
collection |
Acta scientiarum. Technology (Online) |
repository.name.fl_str_mv |
Acta scientiarum. Technology (Online) - Universidade Estadual de Maringá (UEM) |
repository.mail.fl_str_mv |
||actatech@uem.br |
_version_ |
1799315335864647680 |