Influence of water level in mine sequencing applied to strategic mining planning
Autor(a) principal: | |
---|---|
Data de Publicação: | 2020 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Institucional da UFRGS |
Texto Completo: | http://hdl.handle.net/10183/218178 |
Resumo: | Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions. |
id |
UFRGS-2_3e8f418b243cf53a71d2c0f999c0c1eb |
---|---|
oai_identifier_str |
oai:www.lume.ufrgs.br:10183/218178 |
network_acronym_str |
UFRGS-2 |
network_name_str |
Repositório Institucional da UFRGS |
repository_id_str |
|
spelling |
Fontes, Marcélio PradoPeroni, Rodrigo de Lemos2021-02-24T04:18:25Z20202448-167Xhttp://hdl.handle.net/10183/218178001121225Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions.application/pdfengREM : international engineering journal. Ouro Preto, MG. Vol. 73, no. 2 (Apr./June 2020), p. 233-240MineraçãoLençol freáticoEconomia mineralSequencingMiningGroundwaterMineral economicsInfluence of water level in mine sequencing applied to strategic mining planninginfo:eu-repo/semantics/articleinfo:eu-repo/semantics/otherinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/openAccessreponame:Repositório Institucional da UFRGSinstname:Universidade Federal do Rio Grande do Sul (UFRGS)instacron:UFRGSTEXT001121225.pdf.txt001121225.pdf.txtExtracted Texttext/plain33275http://www.lume.ufrgs.br/bitstream/10183/218178/2/001121225.pdf.txt6c9c7a1ad318f8db6df6d81e9824ac34MD52ORIGINAL001121225.pdfTexto completo (inglês)application/pdf1028987http://www.lume.ufrgs.br/bitstream/10183/218178/1/001121225.pdf8e0d5ddcdcea37a50aa822685152ca79MD5110183/2181782023-08-09 03:49:03.669196oai:www.lume.ufrgs.br:10183/218178Repositório de PublicaçõesPUBhttps://lume.ufrgs.br/oai/requestopendoar:2023-08-09T06:49:03Repositório Institucional da UFRGS - Universidade Federal do Rio Grande do Sul (UFRGS)false |
dc.title.pt_BR.fl_str_mv |
Influence of water level in mine sequencing applied to strategic mining planning |
title |
Influence of water level in mine sequencing applied to strategic mining planning |
spellingShingle |
Influence of water level in mine sequencing applied to strategic mining planning Fontes, Marcélio Prado Mineração Lençol freático Economia mineral Sequencing Mining Groundwater Mineral economics |
title_short |
Influence of water level in mine sequencing applied to strategic mining planning |
title_full |
Influence of water level in mine sequencing applied to strategic mining planning |
title_fullStr |
Influence of water level in mine sequencing applied to strategic mining planning |
title_full_unstemmed |
Influence of water level in mine sequencing applied to strategic mining planning |
title_sort |
Influence of water level in mine sequencing applied to strategic mining planning |
author |
Fontes, Marcélio Prado |
author_facet |
Fontes, Marcélio Prado Peroni, Rodrigo de Lemos |
author_role |
author |
author2 |
Peroni, Rodrigo de Lemos |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Fontes, Marcélio Prado Peroni, Rodrigo de Lemos |
dc.subject.por.fl_str_mv |
Mineração Lençol freático Economia mineral |
topic |
Mineração Lençol freático Economia mineral Sequencing Mining Groundwater Mineral economics |
dc.subject.eng.fl_str_mv |
Sequencing Mining Groundwater Mineral economics |
description |
Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of the mineral resources. The conventional method of mining sequencing is divided into three main steps: first, the delineation of the final pit; second, subdivision of the final pit in operational pushbacks (mining advances) and third, sequencing the blocks in each of these pushbacks, taking into consideration mine, processing plant and market capacities. However, there are some aspects that are not usually incorporated in production scheduling, including ore mining below groundwater level. The objective of this study is to demonstrate the relevance and impact on the results of the Net Present Value (NPV) from groundwater level as a constraint related to the need for its drawdown, also considering grades and Stripping Ratio (SR) variability during mining sequence for a phosphate mine. The results show a difference of U$ 140 million for the evaluation considering and not considering groundwater level, without considering other restrictions. |
publishDate |
2020 |
dc.date.issued.fl_str_mv |
2020 |
dc.date.accessioned.fl_str_mv |
2021-02-24T04:18:25Z |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/other |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://hdl.handle.net/10183/218178 |
dc.identifier.issn.pt_BR.fl_str_mv |
2448-167X |
dc.identifier.nrb.pt_BR.fl_str_mv |
001121225 |
identifier_str_mv |
2448-167X 001121225 |
url |
http://hdl.handle.net/10183/218178 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.ispartof.pt_BR.fl_str_mv |
REM : international engineering journal. Ouro Preto, MG. Vol. 73, no. 2 (Apr./June 2020), p. 233-240 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da UFRGS instname:Universidade Federal do Rio Grande do Sul (UFRGS) instacron:UFRGS |
instname_str |
Universidade Federal do Rio Grande do Sul (UFRGS) |
instacron_str |
UFRGS |
institution |
UFRGS |
reponame_str |
Repositório Institucional da UFRGS |
collection |
Repositório Institucional da UFRGS |
bitstream.url.fl_str_mv |
http://www.lume.ufrgs.br/bitstream/10183/218178/2/001121225.pdf.txt http://www.lume.ufrgs.br/bitstream/10183/218178/1/001121225.pdf |
bitstream.checksum.fl_str_mv |
6c9c7a1ad318f8db6df6d81e9824ac34 8e0d5ddcdcea37a50aa822685152ca79 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 |
repository.name.fl_str_mv |
Repositório Institucional da UFRGS - Universidade Federal do Rio Grande do Sul (UFRGS) |
repository.mail.fl_str_mv |
|
_version_ |
1801225008822878208 |