Quality management in the process of monitoring public works: A methodological proposal
Autor(a) principal: | |
---|---|
Data de Publicação: | 2021 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Gestão & Produção |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300217 |
Resumo: | Abstract: In this research article, we present a methodological proposal for improving the process of monitoring public works using quality management. To do this, we have reviewed the monitoring process carried out by the National Education Development Fund (FNDE) during the Proinfância program. We adopted a case study based ondesign science researchas a methodology. This article presents the phases of the literature review, a map of the current work monitoring process, a survey and analysis of the data collected with the current process and a methodological proposal for the construction monitoring process. As a result of the work, a new flow for the work monitoring process is proposed, consisting of internal procedures, work routines and collection tools. The proposed methodology was applied to 15 works, and the results were analyzed. |
id |
UFSCAR-3_d9fda54156d072bfe9682554fc7a4ff6 |
---|---|
oai_identifier_str |
oai:scielo:S0104-530X2021000300217 |
network_acronym_str |
UFSCAR-3 |
network_name_str |
Gestão & Produção |
repository_id_str |
|
spelling |
Quality management in the process of monitoring public works: A methodological proposalQuality managementConstruction workMonitoringProinfânciaProcess mappingChecklistAbstract: In this research article, we present a methodological proposal for improving the process of monitoring public works using quality management. To do this, we have reviewed the monitoring process carried out by the National Education Development Fund (FNDE) during the Proinfância program. We adopted a case study based ondesign science researchas a methodology. This article presents the phases of the literature review, a map of the current work monitoring process, a survey and analysis of the data collected with the current process and a methodological proposal for the construction monitoring process. As a result of the work, a new flow for the work monitoring process is proposed, consisting of internal procedures, work routines and collection tools. The proposed methodology was applied to 15 works, and the results were analyzed.Universidade Federal de São Carlos2021-01-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300217Gestão & Produção v.28 n.3 2021reponame:Gestão & Produçãoinstname:Universidade Federal de São Carlos (UFSCAR)instacron:UFSCAR10.1590/1806-9649-2021v28e5717info:eu-repo/semantics/openAccessRe,Talita Dal’BoscoAquere,André Luizeng2021-07-29T00:00:00Zoai:scielo:S0104-530X2021000300217Revistahttps://www.gestaoeproducao.com/PUBhttps://old.scielo.br/oai/scielo-oai.phpgp@dep.ufscar.br||revistagestaoemanalise@unichristus.edu.br1806-96490104-530Xopendoar:2021-07-29T00:00Gestão & Produção - Universidade Federal de São Carlos (UFSCAR)false |
dc.title.none.fl_str_mv |
Quality management in the process of monitoring public works: A methodological proposal |
title |
Quality management in the process of monitoring public works: A methodological proposal |
spellingShingle |
Quality management in the process of monitoring public works: A methodological proposal Re,Talita Dal’Bosco Quality management Construction work Monitoring Proinfância Process mapping Checklist |
title_short |
Quality management in the process of monitoring public works: A methodological proposal |
title_full |
Quality management in the process of monitoring public works: A methodological proposal |
title_fullStr |
Quality management in the process of monitoring public works: A methodological proposal |
title_full_unstemmed |
Quality management in the process of monitoring public works: A methodological proposal |
title_sort |
Quality management in the process of monitoring public works: A methodological proposal |
author |
Re,Talita Dal’Bosco |
author_facet |
Re,Talita Dal’Bosco Aquere,André Luiz |
author_role |
author |
author2 |
Aquere,André Luiz |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Re,Talita Dal’Bosco Aquere,André Luiz |
dc.subject.por.fl_str_mv |
Quality management Construction work Monitoring Proinfância Process mapping Checklist |
topic |
Quality management Construction work Monitoring Proinfância Process mapping Checklist |
description |
Abstract: In this research article, we present a methodological proposal for improving the process of monitoring public works using quality management. To do this, we have reviewed the monitoring process carried out by the National Education Development Fund (FNDE) during the Proinfância program. We adopted a case study based ondesign science researchas a methodology. This article presents the phases of the literature review, a map of the current work monitoring process, a survey and analysis of the data collected with the current process and a methodological proposal for the construction monitoring process. As a result of the work, a new flow for the work monitoring process is proposed, consisting of internal procedures, work routines and collection tools. The proposed methodology was applied to 15 works, and the results were analyzed. |
publishDate |
2021 |
dc.date.none.fl_str_mv |
2021-01-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300217 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2021000300217 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/1806-9649-2021v28e5717 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Universidade Federal de São Carlos |
publisher.none.fl_str_mv |
Universidade Federal de São Carlos |
dc.source.none.fl_str_mv |
Gestão & Produção v.28 n.3 2021 reponame:Gestão & Produção instname:Universidade Federal de São Carlos (UFSCAR) instacron:UFSCAR |
instname_str |
Universidade Federal de São Carlos (UFSCAR) |
instacron_str |
UFSCAR |
institution |
UFSCAR |
reponame_str |
Gestão & Produção |
collection |
Gestão & Produção |
repository.name.fl_str_mv |
Gestão & Produção - Universidade Federal de São Carlos (UFSCAR) |
repository.mail.fl_str_mv |
gp@dep.ufscar.br||revistagestaoemanalise@unichristus.edu.br |
_version_ |
1750118207960645632 |